Featured news

prev

Loan Guarantee Program

Energy Department Finalizes Loan Guarantee to Support California Solar Generation Project

California project expected to fund over 550 jobs and generate clean, renewable solar power Washington D.C. – U.S. Energy Secretary Steven Chu today announced that the Department finalized partial loan [...]

Read more Energy Department Finalizes Loan Guarantee to Support California Solar Generation Project...
Blythe-KAP_6314-Retouched-copy3

Loan Guarantee Program

DOE Finalizes Loan Guarantee for Transformational Rooftop Solar Project

Largest rooftop project in U.S. history will enable wide distribution of solar power across country while funding at least a thousand jobs Washington D.C. – U.S. Energy Secretary Steven Chu [...]

Read more DOE Finalizes Loan Guarantee for Transformational Rooftop Solar Project...
Kaiser 7 Solar Installation Fontana CA

Loan Guarantee Program

DOE Finalizes $1.2 Billion Loan Guarantee to Support California Solar Generation Project

Note: On October 12, 2011, while updating the California Valley Solar Ranch Project page to reflect the change of sponsorship from SunPower Corporation to NRG Energy, the press release announcing [...]

Read more DOE Finalizes $1.2 Billion Loan Guarantee to Support California Solar Generation Project...
spwr_cvsr_south-T0_Alt_2_rev11

Loan Guarantee Program

DOE Finalizes $646 Million Loan Guarantee to Support Innovative Solar Power Plant

Project Funds Hundreds of Jobs in California and Deploys Innovative Technologies that Improve Efficiency and Reliability of Solar Power Washington D.C. – Energy Secretary Steven Chu announced today that the [...]

Read more DOE Finalizes $646 Million Loan Guarantee to Support Innovative Solar Power Plant...
GE DIGITAL CAMERA

Loan Guarantee Program

DOE Finalizes $132 Million Loan Guarantee to Support the Abengoa Bioenergy Project

Groundbreaking Cellulosic Ethanol Project Expected to Fund Over 300 Jobs and Build Nation’s Capacity for Cellulosic Ethanol Production Washington, D.C. – U.S. Energy Secretary Steven Chu today announced that the [...]

Read more DOE Finalizes $132 Million Loan Guarantee to Support the Abengoa Bioenergy Project...
Krone-3x4

Loan Guarantee Program

DOE Finalizes $337 Million Loan Guarantee to Mesquite Solar 1 for Innovative Solar Power Plant

Arizona project expected to fund approximately 300 jobs and employ innovative technologies that increase reliability and energy production Washington, D.C. — U.S. Energy Secretary Steven Chu today announced that the [...]

Read more DOE Finalizes $337 Million Loan Guarantee to Mesquite Solar 1 for Innovative Solar Power Plant...
Solar farm panels

Loan Guarantee Program

DOE Finalizes $737 Million Loan Guarantee to Tonopah Solar Energy for Nevada Project

Solar power facility to generate clean, renewable power and fund 645 direct jobs Washington D.C. — U.S. Energy Secretary Steven Chu today announced the Department finalized a $737 million loan [...]

Read more DOE Finalizes $737 Million Loan Guarantee to Tonopah Solar Energy for Nevada Project...
Artistic-Rendering-SolarReserve-Solar-Plant-20101

Loan Guarantee Program

DOE Finalizes Loan Guarantee of Nearly $170 Million to Granite Reliable Power

Project expected to fund nearly 200 jobs Washington, D.C. – U.S. Energy Secretary Steven Chu announced today the Department of Energy finalized a partial guarantee for $168.9 million loan to [...]

Read more DOE Finalizes Loan Guarantee of Nearly $170 Million to Granite Reliable Power...
granite

Loan Guarantee Program

Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in Nevada

Project expected to fund nearly 400 jobs and produce clean geothermal power Washington, D.C. – U.S. Energy Secretary Steven Chu today announced the Department finalized a partial guarantee for up [...]

Read more Energy Department Finalizes Loan Guarantee for Ormat Geothermal Project in Nevada...
O

Loan Guarantee Program

DOE Finalizes $105 Million Loan Guarantee for First-of-its-Kind Cellulosic Bio-Refinery in Iowa

Project expected to produce up to 25 million gallons of ethanol annually and fund 240 jobs Washington D.C. – U.S. Energy Secretary Steven Chu today announced the Department finalized a [...]

Read more DOE Finalizes $105 Million Loan Guarantee for First-of-its-Kind Cellulosic Bio-Refinery in Iowa...
poet
next

Loan Programs Office

Our Projects

Current Totals

Loans: $34.5B

Jobs: ~60,000

Department of Energy
1703
AREVA Front-end Nuclear

Front-end Nuclear

Idaho Falls, ID
$2 billion Loan Amount 310/1,000 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons N/A Annual Avoided CO2(tons) N/A Annual Cars off the Road*
N/A Annual Households Equivalent
1703
Georgia Power Company Nuclear Generation

Nuclear Generation

Waynesboro, GA
$8.33 billion Loan Amount 800/3,500 Jobs (Permanent / Construction) 2,204 Generation Capacity
17,956,000 MWh/Gallons 10,317,000 Annual Avoided CO2(tons) 1,984,000 Annual Cars off the Road*
1,564,000 Annual Households Equivalent
1705
1366 Technologies, Inc. Solar Manufacturing

Solar Manufacturing

Lexington, MA
$150 million Loan Amount 70/50 Jobs (Permanent / Construction) N/A Generation Capacity
647,000 MWh/Gallons 372,000 Annual Avoided CO2(tons) 71,000 Annual Cars off the Road*
56,000 Annual Households Equivalent
1705
Abengoa Bioenergy Biomass of Kansas LLC Biofuel

Biofuel

Hugoton, KS
$132.4 million Loan Amount 65/300 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons 139,000 Annual Avoided CO2(tons) 27,000 Annual Cars off the Road*
N/A Annual Households Equivalent
1705
Abengoa Solar, Inc. (Mojave Solar) Solar Generation

Solar Generation

San Bernardino County, CA
$1.2 billion Loan Amount 70/830 Jobs (Permanent / Construction) 250 Generation Capacity
617,000 MWh/Gallons 355,000 Annual Avoided CO2(tons) 68,000 Annual Cars off the Road*
54,000 Annual Households Equivalent
1705
Abengoa Solar, Inc. (Solana) Solar Generation

Solar Generation

Gila Bend, AZ
$1.446 billion Loan Amount 60/1,700 Jobs (Permanent / Construction) 250 Generation Capacity
944,000 MWh/Gallons 544,000 Annual Avoided CO2(tons) 105,000 Annual Cars off the Road*
82,000 Annual Households Equivalent
1705
Abound Solar Solar Manufacturing

Solar Manufacturing

Longmont, CO and Tipton, IN
$400 million Loan Amount N/A/400 Jobs (Permanent / Construction) N/A Generation Capacity
1,906,000 MWh/Gallons 1,095,000 Annual Avoided CO2(tons) 210,000 Annual Cars off the Road*
166,000 Annual Households Equivalent
1705
Abound Solar Solar Manufacturing

Solar Manufacturing

Tipton, IN
$400 million Loan Amount N/A/400 Jobs (Permanent / Construction) N/A Generation Capacity
1,906,000 MWh/Gallons 1,095,000 Annual Avoided CO2(tons) 210,000 Annual Cars off the Road*
166,000 Annual Households Equivalent
1705
Beacon Power Corporation Energy Storage

Energy Storage

Stephentown, NY
$43 million Loan Amount 14/20 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons N/A Annual Avoided CO2(tons) N/A Annual Cars off the Road*
N/A Annual Households Equivalent
1705 (FIPP)
Caithness Shepherds Flat Wind Generation

Wind Generation

Gilliam and Morrow Counties, OR
partial guarantee of $1.3 billion Loan Amount 35/400 Jobs (Permanent / Construction) 845 Generation Capacity
1,797,000 MWh/Gallons 1,032,000 Annual Avoided CO2(tons) 199,000 Annual Cars off the Road*
157,000 Annual Households Equivalent
1705 (FIPP)
Caithness Shepherds Flat Wind Generation

Wind Generation

Stamford, CT
partial guarantee of $1.3 billion Loan Amount 35/400 Jobs (Permanent / Construction) 845 Generation Capacity
1,797,000 MWh/Gallons 1,032,000 Annual Avoided CO2(tons) 199,000 Annual Cars off the Road*
157,000 Annual Households Equivalent
1705 (FIPP)
Caithness Shepherds Flat Wind Generation

Wind Generation

North OR
partial guarantee of $1.3 billion Loan Amount 35/400 Jobs (Permanent / Construction) 845 Generation Capacity
1,797,000 MWh/Gallons 1,032,000 Annual Avoided CO2(tons) 199,000 Annual Cars off the Road*
157,000 Annual Households Equivalent
1705
Cogentrix of Alamosa, LLC. Solar Generation

Solar Generation

Alamosa, CO
$90.6 million Loan Amount 10/75 Jobs (Permanent / Construction) 30 Generation Capacity
75,000 MWh/Gallons 43,000 Annual Avoided CO2(tons) 8,000 Annual Cars off the Road*
7,000 Annual Households Equivalent
1705
Exelon (Antelope Valley Solar Ranch) Solar Generation

Solar Generation

Lancanster, CA
$646 million Loan Amount 20/350 Jobs (Permanent / Construction) 230 Generation Capacity
623,000 MWh/Gallons 358,000 Annual Avoided CO2(tons) 69,000 Annual Cars off the Road*
54,000 Annual Households Equivalent
1705 (FIPP)
Granite Reliable Wind Generation

Wind Generation

Coos, NH
partial guarantee of $168.9 million Loan Amount 6/198 Jobs (Permanent / Construction) 99 Generation Capacity
224,000 MWh/Gallons 124,000 Annual Avoided CO2(tons) 23,000 Annual Cars off the Road*
19,000 Annual Households Equivalent
1705
Kahuku Wind Power, LLC. Wind Generation

Wind Generation

Kahuku Oahu, HI
$117 million Loan Amount 10/200 Jobs (Permanent / Construction) 30 Generation Capacity
71,000 MWh/Gallons 41,000 Annual Avoided CO2(tons) 8,000 Annual Cars off the Road*
6,000 Annual Households Equivalent
1705
Kahuku Wind Power, LLC. Wind Generation

Wind Generation

Oahu, HI
$117 million Loan Amount 10/200 Jobs (Permanent / Construction) 30 Generation Capacity
71,000 MWh/Gallons 41,000 Annual Avoided CO2(tons) 8,000 Annual Cars off the Road*
6,000 Annual Households Equivalent
1705
LS Power Associates (ON Line – formerly known as SWIP-S) Transmission

Transmission

Ely to Las Vegas, NV
$343 million Loan Amount 15/400 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons N/A Annual Avoided CO2(tons) N/A Annual Cars off the Road*
N/A Annual Households Equivalent
1705
LS Power Associates (ON Line – formerly known as SWIP-S) Transmission

Transmission

Chesterfield, MO
$343 million Loan Amount 15/400 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons N/A Annual Avoided CO2(tons) N/A Annual Cars off the Road*
N/A Annual Households Equivalent
1705
LS Power Associates (ON Line – formerly known as SWIP-S) Transmission

Transmission

Eastern Nevada, NV
$343 million Loan Amount 15/400 Jobs (Permanent / Construction) N/A Generation Capacity
N/A MWh/Gallons N/A Annual Avoided CO2(tons) N/A Annual Cars off the Road*
N/A Annual Households Equivalent
1705
Mesquite Solar 1, LLC (Sempra Mesquite) Solar Generation

Solar Generation

Maricopa County, AZ
$337 million Loan Amount 7/300 Jobs (Permanent / Construction) 170 Generation Capacity
350,000 MWh/Gallons 201,000 Annual Avoided CO2(tons) 39,000 Annual Cars off the Road*
30,000 Annual Households Equivalent
1705 (FIPP)
Nevada Geothermal Power Company, Inc. (Blue Mountain) Geothermal

Geothermal

Reno, NV
partial guarantee of $98.5 million Loan Amount 14/200 Jobs (Permanent / Construction) 36 Generation Capacity
305,000 MWh/Gallons 175,000 Annual Avoided CO2(tons) 34,000 Annual Cars off the Road*
27,000 Annual Households Equivalent
1705 (FIPP)
NextEra Energy Resources, LLC (Desert Sunlight) Solar Generation

Solar Generation

Riverside County, CA
partial guarantee of $1.46 billion Loan Amount 15/550 Jobs (Permanent / Construction) 550 Generation Capacity
1,280,000 MWh/Gallons 735,000 Annual Avoided CO2(tons) 141,000 Annual Cars off the Road*
111,000 Annual Households Equivalent
1705 (FIPP)
NextEra Energy Resources, LLC (Genesis Solar) Solar Generation

Solar Generation

Riverside County, CA
partial guarantee of $852 million Loan Amount 47/800 Jobs (Permanent / Construction) 250 Generation Capacity
560,000 MWh/Gallons 322,000 Annual Avoided CO2(tons) 62,000 Annual Cars off the Road*
49,000 Annual Households Equivalent
1705
NRG Energy, Inc. (BrightSource) Solar Generation

Solar Generation

Mojave, CA
$1.6 billion Loan Amount 86/1,000 Jobs (Permanent / Construction) 383 Generation Capacity
998,000 MWh/Gallons 574,000 Annual Avoided CO2(tons) 110,000 Annual Cars off the Road*
87,000 Annual Households Equivalent
1705
NRG Solar (California Valley Solar Ranch) Solar Generation

Solar Generation

San Luis Obispo, CA
$1.237 billion Loan Amount 15/350 Jobs (Permanent / Construction) 250 Generation Capacity
739,000 MWh/Gallons 425,043 Annual Avoided CO2(tons) 74,153 Annual Cars off the Road*
59,000 Annual Households Equivalent
1705
NRG Solar, LLC (Agua Caliente) Solar Generation

Solar Generation

Yuma County, AZ
$967 million Loan Amount 10/400 Jobs (Permanent / Construction) 290 Generation Capacity
648,000 MWh/Gallons 372,000 Annual Avoided CO2(tons) 72,000 Annual Cars off the Road*
56,000 Annual Households Equivalent
1705 (FIPP)
Ormat Nevada, Inc. Geothermal

Geothermal

Jersey Valley, McGinness Hills, and Tuscarora, NV
partial guarantee of $350 million Loan Amount 64/332 Jobs (Permanent / Construction) 121 Generation Capacity
1,007,000 MWh/Gallons 579,000 Annual Avoided CO2(tons) 111,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

28 States
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

New York
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

New Jersey
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Pennsylvania
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Virginia
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

North Carolina
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

South Carolina
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Georgia
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

28 States
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Tennessee
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Kentucky
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Ohio
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Illinois
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Wisconsin
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Mississippi
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Louisiana
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Oregon
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

28 States
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Minnesota
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Texas
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Utah
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Arizona
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Nevada
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

California
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705 (FIPP)
Prologis (Project Amp) Solar Generation

Solar Generation

Washington
partial guarantee of $1.4 billion Loan Amount 42/Over 1,000 Jobs (Permanent / Construction) 752 Generation Capacity
1,015,000 MWh/Gallons 583,000 Annual Avoided CO2(tons) 112,000 Annual Cars off the Road*
88,000 Annual Households Equivalent
1705
Record Hill Wind Wind Generation

Wind Generation

Roxbury, ME
$102 million Loan Amount 8/200 Jobs (Permanent / Construction) 50 Generation Capacity
96,000 MWh/Gallons 55,000 Annual Avoided CO2(tons) 11,000 Annual Cars off the Road*
8,000 Annual Households Equivalent
1705
SolarReserve, LLC (Crescent Dunes) Solar Generation

Solar Generation

Nye County, NV
$737 million Loan Amount 45/600 Jobs (Permanent / Construction) 110 Generation Capacity
504,000 MWh/Gallons 289,000 Annual Avoided CO2(tons) 56,000 Annual Cars off the Road*
44,000 Annual Households Equivalent
1705
SoloPower Solar Manufacturing

Solar Manufacturing

Portland, OR
$197 million Loan Amount 450/270 Jobs (Permanent / Construction) N/A Generation Capacity
794,000 MWh/Gallons 456,000 Annual Avoided CO2(tons) 88,000 Annual Cars off the Road*
69,000 Annual Households Equivalent
1705
Solyndra Inc. Solar Manufacturing

Solar Manufacturing

Fremont, CA
$535 million Loan Amount N/A/3,000 Jobs (Permanent / Construction) N/A Generation Capacity
681,000 MWh/Gallons 391,000 Annual Avoided CO2(tons) 75,000 Annual Cars off the Road*
59,000 Annual Households Equivalent
1705
US Geothermal, Inc. Geothermal

Geothermal

Malheur Cty, OR
$97 million Loan Amount 10/150 Jobs (Permanent / Construction) 23 Generation Capacity
180,000 MWh/Gallons 103,000 Annual Avoided CO2(tons) 20,000 Annual Cars off the Road*
16,000 Annual Households Equivalent
ATVM
Fisker Automotive OEM

OEM

Wilmington, DE
$529 million Loan Amount 2,000 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 154,000 Annual Avoided CO2(tons) 30,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Fisker Automotive OEM

OEM

Irvine, CA
$529 million Loan Amount 2,000 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 154,000 Annual Avoided CO2(tons) 30,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Ford Motor Company Motor Vehicle Manufacturing

Motor Vehicle Manufacturing

Michigan
$5.907 billion Loan Amount 33,000 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 2,018,000 Annual Avoided CO2(tons) 388,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Ford Motor Company Motor Vehicle Manufacturing

Motor Vehicle Manufacturing

Illinois
$5.907 billion Loan Amount 3,000 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 2,018,000 Annual Avoided CO2(tons) 388,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Ford Motor Company Motor Vehicle Manufacturing

Motor Vehicle Manufacturing

Kentucky
$5.907 billion Loan Amount 3,500 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 2,018,000 Annual Avoided CO2(tons) 388,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Ford Motor Company Motor Vehicle Manufacturing

Motor Vehicle Manufacturing

Missouri
$5.907 billion Loan Amount 4,000 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 2,018,000 Annual Avoided CO2(tons) 388,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Nissan North America, Inc. OEM

OEM

Smyrna, TN
$1.448 billion Loan Amount 1,300 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 204,000 Annual Avoided CO2(tons) 39,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
Tesla Motors OEM

OEM

Fremont, CA
$465 million Loan Amount 1,500 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 26,000 Annual Avoided CO2(tons) 5,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
The Vehicle Production Group LLC OEM

OEM

Mishawaka, IN
$50 million Loan Amount 900 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 9,000 Annual Avoided CO2(tons) 2,000 Annual Cars off the Road*
N/A Annual Households Equivalent
ATVM
The Vehicle Production Group LLC OEM

OEM

Mishawaka, IN
$50 million Loan Amount 900 Jobs (Permanent) N/A Generation Capacity
N/A MWh/Gallons 9,000 Annual Avoided CO2(tons) 2,000 Annual Cars off the Road*
N/A Annual Households Equivalent
About the Data

Annual MWh/Gallon:
Annual generation of electricity in megawatt-hours (MWh) or gallons of biofuel (project type dependent).

20-year avoided GHG:
Tons of greenhouse gases that might have otherwise been emitted from other energy sources over a 20-year period if not for implementation of the project.

Annual avoided CO2:
Annual tons of carbon dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.

Annual avoided SO2:
Annual tons of sulfur dioxide that might have otherwise been emitted from other energy sources if not for implementation of the project.

Annual avoided NOx:
Annual tons of nitrogen oxides that might have otherwise been emitted from other energy sources if not for implementation of the project.

Annual “cars off the road”:
The number of passenger vehicles with equivalent annual tons of greenhouse gases emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EPA MOBILE6.2 Average passenger vehicle = 5.20 metric tons CO2e).

Household equivalents:
The number of residential households with equivalent annual tons of carbon dioxide emissions that might have otherwise occurred from other energy sources if not for implementation of the project (as based on EIA figure 14,796 lbs CO2 emissions per year for an average household).

Latest News

Visit LPO News Room »