Featured
As the final painting phase and scaffolding removal continues, window tops of the Dome's Second Story are now visible.
Featured
Watch as new glass is rolled and trimmed to replace these badly damaged, unstable historical windows.
Featured
See how the work to re-create decorative ornaments on the Dome is done.
Featured
The entire scaffolding system, including art protection, is expected to remain in the Rotunda through late summer 2016.