Summary: H.R.2983 — 115th Congress (2017-2018)All Information (Except Text)

There is one summary for H.R.2983. Bill summaries are authored by CRS.

Shown Here:
Introduced in House (06/21/2017)

Stop the Asian Carp Now Act of 2017

This bill directs the U.S. Army Corps of Engineers to release for public comment the Great Lakes and Mississippi River Interbasin Study - Brandon Road interim report that was scheduled for release on February 27, 2017. (The interim report is a feasibility study that assesses the viability of establishing a single point to control the upstream transfer of aquatic nuisance species from the Mississippi River Basin into the Great Lakes Basin in the vicinity of the Brandon Road Lock and Dam in Joliet, Illinois.)