Due to the lapse in federal funding, this website will not be actively managed. More Info.
Main Content

No-rise Certification for Floodways

The purpose of this page is to define No-Rise Certifications, a commonly used term in floodplain management.

Definition/Description

Any project in a floodway must be reviewed to determine if the project will increase flood heights. An engineering analysis must be conducted before a permit can be issued. The community's permit file must have a record of the results of this analysis, which can be in the form of a No-rise Certification. This No-rise Certification must be supported by technical data and signed by a registered professional engineer. The supporting technical data should be based on the standard step-backwater computer model used to develop the 100-year floodway shown on the Flood Insurance Rate Map (FIRM) or Flood Boundary and Floodway Map (FBFM).

NFIP Requirement

Other Applicable NFIP Regulations

Guidance

Related Keywords

Special Topic Resources

Last Updated: 
09/14/2018 - 10:48