FY03 planned work:
1. Complete the design of the geospatial interface and publish to the web. A prototype is planned for release late in FY02 or early in FY03. This invloves completing the coding of ArcIMS site to customize for PBS needs and updating the site based on feedback from customers following the public release of the site.
2. Populate the geospatial library with background data layers from existing data layers. THis involves loading existing background datasets into the geospatial libraryand checking that the data sets have appropriate metadata records.
3. Develop data layers representing the location of USGS data collection sites. This involves the creation of data layers from the SOFIA database of USGS data collection sites by theme and preparation of metadata records
4. Develop data layers representing published USGS products, such as geologic contour maps. Many of these data sets will be used for the Atlas being prepared as part of the SOFIA database project. This entails creating data layers from published USGS map products and preparation of metadata records.
Design and maintenance fo geospatial interface and database
1. Complete coding of ArcIMS site to customize for PBS needs 2. Update the site based on feedback from customers following the public release of the site 3. Load existing background datasets into the geospatial library. Check that the data sets have appropriate metadata records 4. Create data layers from the SOFIA database of USGS data collection sites by theme. Prepare metadata records 5. Create data layers from published USGS map products. Prepare metadata records
Suite 107
U.S. Department of the Interior, U.S. Geological Survey, Center for
Coastal Geology
Comments and suggestions? Contact: Heather
Henkel - Webmaster
Generated by mp version 2.8.11 on Tue Aug 03 15:10:54 2004