Report on DOT Significant Rulemakings

page views since 04-May-04

Table of Contents

Federal Highway Administration

27. National Bridge Inspection Standards

 

28. National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Maintaining Traffic Sign Retroreflectivity




Federal Highway Administration


 

Federal Highway Administration

27. 

National Bridge Inspection Standards

Green

Popular Title: NBIS

RIN 2125-AE86

Stage: Final Rule

Previous Stage: ANPRM: Publication Date 9/26/2001; End of Comment Period 12/26/2001. NPRM: Publication Date 9/9/2003; End of Comment Period 11/10/2003.

Abstract: This rulemaking would examine whether to revise the regulation on National Bridge Inspection Standards (NBIS) to incorporate current, state-of-the-art bridge inspection practices that public authorities may be using. It has been fourteen years since the NBIS regulations were updated. The experience, material, and technology changes over time dictate that the FHWA take a fresh look at these regulations. The FHWA has received some unsolicited comments from engineers, inspectors, transportation planners, and others recommending a number of changes to the FHWA's NBIS regulations. In revising these regulations the FHWA is considering incorporating a number of the FHWA policy memorandums and technical advisories into the regulation.

Effects:

 

None

Prompting action: None

Legal Deadline: 

None

Rulemaking Project Initiated: 08/31/2001

Dates for Final Rule:

Milestone

Originally
Scheduled
Date

New
Projected
Date

Actual
Date

To OST

06/15/2004 

 

 

To OMB

07/16/2004 

 

 

OMB Clearance

10/15/2004 

 

 

Publication Date

10/23/2004 

 

 

Explanation for any delay:

N/A

Federal Register Citation for Final Rule: None



Federal Highway Administration

28. 

National Standards for Traffic Control Devices; the Manual on Uniform Traffic Control Devices for Streets and Highways; Maintaining Traffic Sign Retroreflectivity

Red

Popular Title: Retroreflectivity of Road Signs

RIN 2125-AE98

Stage: NPRM

Previous Stage:None

Abstract: This rulemaking would amend the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) to include methods to maintain traffic sign retroreflectivity. The maintenance methods would establish a basis for improving nighttime visibility of traffic signs to promote safety, enhance traffic operations, and facilitate comfort and convenience for all drivers. The changes would be designated as Revision No. 1 to the 2003 Edition of the MUTCD. This rulemaking was prompted by the FY 1993 DOT and Related Agencies Appropriations Act, which in 1998, ASHTO requested a delay in rulemaking until formal ASHTO recommendations could be developed based on research completed. ASHTO submitted recommendations in 2000. Further studies were completed in 2001. During 2002 the Texas Transportation Institute, under contract to the FHWA, conducted four workshops on sign retroreflectivity.

Effects:

 

Major

Prompting action: Statute

Legal Deadline: 

None

Rulemaking Project Initiated: 05/07/2003

Dates for NPRM:

Milestone

Originally
Scheduled
Date

New
Projected
Date

Actual
Date

To OST

02/05/2004 

03/08/2004 

03/10/2004 

To OMB

03/05/2004 

04/08/2004 

 

OMB Clearance

06/04/2004 

06/08/2004 

 

Publication Date

05/26/2004 

06/15/2004 

 

End of Comment Period

07/26/2004 

08/06/2004 

 

Explanation for any delay:

Unanticipated issues requiring further analysis

Federal Register Citation for NPRM: None