TOC PREV NEXT

Subpart 42.14- Traffic and Transportation Management

42.1401 General.

(a) The contract administration office (CAO) shall ensure that instructions to contractors result in the most efficient and economical use of carrier services and equipment. If the transportation data regarding f.o.b. origin contracts is insufficient for Government transportation management purposes, the CAO shall obtain the data used in the evaluation of offers.
(b) Transportation personnel assigned to or supporting the CAO, or appropriate agency personnel, are responsible for-
(1) Furnishing timely routings and releases for port shipments;
(2) Monitoring shipments to provide for carload or truckload quantities when practicable;
(3) Controlling and issuing U.S. Government bills of lading (GBL's) and determining proper freight classification descriptions;
(4) Reviewing documentation to ensure the proper distribution and validation of shipping documents;
(5) Developing, and advising on, transportation cost differentials brought on by proposed changes in contract terms; e.g., delivery schedules;
(6) Determining, for contract requirements, the size and carrying capability of carrier equipment to transport overdimensional and/or overweight supplies, hazardous materials, or supplies requiring special shipping arrangements;
(7) Developing information and reporting movements that may be the basis for negotiating special rates for volume movements or for rate adjustments (see 42.1402(b));
(8) Exercising control of irregularities in preservation, packing, loading, blocking and bracing, and other causes contributing to loss and damage; sealing of carrier equipment and documentation;
(9) Providing information on the use of transit arrangements;
(10) Recommending, when appropriate, prepayment by contractor for f.o.b. origin shipments or parcel post (see 47.303-17 and 42.1404);
(11) Recommending, when appropriate, the use of commercial forms and procedures for small shipments of a recurring nature if transportation costs do not exceed $100, as authorized in 41 CFR 101-41.304-2 and, for the Department of Defense (DOD), in Chapter 32, Defense Traffic Management Regulation (DTMR) (AR 55-355, NAVSUPINST 4600.70, AFM 75-2, MCO P-4600.14A, DLAR 4500.3);
(12) Diverting, reconsigning, tracing, and expediting shipments;
(13) Considering the capabilities of contractors for meeting new or emergency requirements that arise during the contract administration and using these capabilities when appropriate; and
(14) Using routings through established consolidation stations when it is in the Government's interest.
(c) Civilian agencies shall consult and cooperate with the Office of Transportation of the General Services Administration (GSA) as required in 41 CFR 101-40. (See 47.105, Transportation assistance, for assistance to civilian Government activities or to military installations.)

42.1402 Volume movements within the continental United States.

(a)(1) For purposes of contract administration, a volume movement is-
(i) In DOD, the aggregate of freight shipments amounting to or exceeding 25 carloads, 25 truckloads, or 500,000 pounds, to move during the contract period from one origin point for delivery to one destination point or area; and
(ii) In civilian agencies, 50 short tons (100,000 pounds) in the aggregate to move during the contract period from one origin point for delivery to one destination point or area.
(2) Transportation personnel assigned to or supporting the CAO, or appropriate agency personnel, shall report planned and actual volume movements in accordance with agency regulations. DOD activities report to the Military Traffic Management Command (MTMC) under the Defense Traffic Management Regulation (DTMR). Civilian agencies report to GSA, Office of Transportation, or other designated offices under the Federal Property Management Regulations (FPMR), specifically 41 CFR 101-40.305-2.
(b) Reporting of volume movements permits MTMC and GSA transportation personnel to determine the reasonableness of applicable current rates and, when appropriate, to negotiate adjusted or modified rates.

42.1403 Shipping documents covering f.o.b. origin shipments.

(a) Except as provided in 47.303-17, when a contract specifies delivery of supplies f.o.b. origin with transportation costs to be paid by the Government, the contractor shall make shipments on U.S. Government bills of lading (GBL's), or on other shipping documents prescribed by MTMC in the case of seavan containers, furnished by the CAO or the appropriate agency transportation office. Each agency shall establish appropriate procedures by which the contractor shall obtain GBL's. The contracting officer shall not authorize the contractor to ship on commercial bills of lading for conversion to GBL's unless delivery is extremely urgent and GBL's are not readily available.
(b) The possible application of reduced rates under section 10721 of the Interstate Commerce Act for shipments on commercial bills of lading and the Commercial Bill of Lading Notations clause are discussed at 47.104.
(c)(1) The limited authority for the use of commercial forms and procedures to acquire freight or express transportation for small shipments of a recurring nature when transportation costs do not exceed $100, is prescribed in the Transportation Documentation and Audit Regulation, specifically 41 CFR 101-41.304-2.
(2) For DOD shipments, corresponding guidance is in Chapter 32 of the DTMR.

42.1404 Shipments by parcel post or other classes of mail.

42.1404-1 Parcel post eligible shipments.

(a)(1) Use of parcel post or other classes of mail permits direct movements from source of supply to the user, without the intermediate documentation that is required when supplies are transported through depots or air or water terminals. However, the use of parcel post and other classes of mail shall be confined to deliveries of mailable matter that meet the size, weight, and distance limitations prescribed by the U.S. Postal Service. Parcel post eligible shipments for overseas destinations will not be sent via Small Package Delivery services or parcel post to CONUS military air or water terminals. These shipments will be mailed through the APO or FPO to the overseas user. Contractors shall not divide delivery quantities into mailable parcels for the purpose of avoiding shipments by other modes of transportation.
(2) When parcel post or other classes of mail are used by contractors, they shall prepay the postage costs by using their own mailing labels or stamps and include prepaid postage costs as separate items in the invoices for supplies shipped.
(b)(1) Authority for contractors to use indicia mail may be obtained by submitting Postal Service (PS) Form 3601, Application to Mail Without Affixing Postage Stamps, to the U.S. Postal Service for approval following agency procedures. If approval is granted, the agency shall follow the U.S. Postal Service permit requirements.
(2) When indicia mail is used, the contractor will be provided with a completed PS Form 3601 and official penalty permit imprint mailing labels, envelopes, or cards printed on the top right side in a rectangular box: Postage and Fees Paid (first line); Government Agency Name (second line); and, the proper permit imprint number (G-000) on the third line. These must also bear in the upper left corner in every case the printed return address of the agency concerned above the printed phrases "Official Business" and "Penalty for Private Use, $300." The name and address of a private person or firm shall not be shown.
(c) When a contractor uses the contractor's own label for making a shipment to a post office servicing military and other agency consignees outside the United States, the contractor shall stamp or imprint the parcel immediately above the label in l/4 inch block letters with (i) the name of the agency and (ii) the words "Official Mail-Contents for Official Use-Exempt from Customs Requirements." This permits identification and expedites handling within the postal system. Use of this marking does not eliminate the requirement for payment of postage by the contractor when so required by the contract or when the contractor is to be reimbursed for the cost of postage.
(d) Contractors may not insure shipments at Government expense for the purpose of recovery in case of loss and/or damage, except that minimum insurance required for the purposes of obtaining receipts at point of origin and upon delivery is authorized.

42.1404-2 Contract clauses.

(a) The contracting officer shall insert the clause at 52.242-10, F.o.b. Origin-Government Bills of Lading or Prepaid Postage, in solicitations and contracts when f.o.b. origin shipments are to be made using Government bills of lading or prepaid postage.
(b) The contracting officer shall insert the clause at 52.242-11, F.o.b. Origin-Government Bills of Lading or Indicia Mail, in solicitations and contracts when f.o.b. origin shipments are to be made using Government bills of lading or indicia mail, if indicia mail has been authorized by the U.S. Postal Service.

42.1405 Discrepancies incident to shipment of supplies.

(a) Discrepancies incident to shipment include overage, shortage, loss, damage, and other discrepancies between the quantity and/or condition of supplies received from commercial carriers and the quantity and/or condition of these supplies as shown on the covering bill of lading or other transportation document. Regulations and procedures for reporting and adjusting discrepancies in Government shipments are in Subpart 40.7 of the Federal Property Management Regulations (41 CFR 101-40.7). (Military installations shall consult "Reporting of Transportation Discrepancies in Shipments," AR 55-38, NAVSUP INST 4610.33C, AFR 75-18, MCO P4610.19D, DLAR 4500.15.)
(b) Generally, when the place of delivery is f.o.b. origin, the Government consignee at destination is also accountable for the supplies, and all claims or reports dealing with discrepancies shall be initiated at that point in accordance with the property accountability regulations of the agency concerned.
(c) If supplies are acquired on an f.o.b. destination basis, any claim arising from a discrepancy occurring in transit is a matter for settlement between the contractor and the carrier. However, the Government consignee shall-
(1) Notify the carrier of the discrepancy by noting the exception on the carrier's delivery receipt; and
(2) Furnish all available data to the CAO or appropriate agency office, which shall promptly transmit the data to the contractor.

42.1406 Report of shipment (REPSHIP).

42.1406-1 Advance notice.

Military (and as required, civilian agency) storage and distribution points, depots, and other receiving activities require advance notice of shipments en route from contractors' plants. Generally, this notification is required only for classified material; sensitive, controlled, and certain other protected material; explosives, and some other hazardous materials; selected shipments requiring movement control; or minimum carload or truckload shipments. It facilitates arrangements for transportation control, labor, space, and use of materials handling equipment at destination. Also, timely receipt of notices by the consignee transportation office precludes the incurring of demurrage and vehicle detention charges.

42.1406-2 Contract clause.

The contracting officer shall insert the clause at 52.242-12, Report of Shipment (REPSHIP), in solicitations and contracts when advance notice of shipment is required for safety or security reasons, or where carload or truckload shipments will be made to DoD installations or, as required, to civilian agency facilities.

TOC PREV NEXT