Location: KOOTENAI SUBBASIN basin, including sites listed below.
BARRON CREEK, BIG CHERRY CREEK, BIG CREEK (KOOTENAI), BIG CREEK (KOOTENAI), BIG CREEK, SOUTH FORK, BIG CREEK, SOUTH FORK, EAST BRANCH, BOBTAIL CREEK, BRISTOW CREEK, CALLAHAN CREEK, CALLAHAN CREEK, NORTH FORK, CLARENCE CREEK, CRIPPLE HORSE CREEK, DEEP CREEK (KOOTENAI), DODGE CREEK (C BRANCH AREA), DUNN CREEK, FISHER RIVER, FIVEMILE CREEK (KOOTENAI), FORTINE CREEK, GRANITE CREEK (KOOTENAI), GRAVE CREEK, KOOTENAI RIVER [MT], LAKE CREEK (KOOTENAI), LAKE CREEK DAM (TROY DAM), LAKE KOOCANUSA, LAKE KOOCANUSA, LIBBY CREEK, LIBBY DAM, LIBBY DAM, O'BRIEN CREEK, PINKHAM CREEK, PIPE CREEK, QUARTZ CREEK, QUARTZ CREEK, WEST FORK, SINCLAIR CREEK, SULLIVAN CREEK (KOOTENAI), SUTTON CREEK, TENMILE CREEK (KOOTENAI), WARLAND CREEK, YAAK RIVER, YOUNG CREEK.
Summary Description: Use models & field techniques to relate Kootenai River hydraulic conditions to fish habitat & food needs. Link river model to existing reservoir model to balance hydro operations. Study options to mitigate the effects of Libby Dam.
Background: This study was designed to determine the effects of drawdown of Libby Reservoir on game fish. Changes in the distributions of fish, their use of various reservoir zones, and timing of alterations of each zones' physical parameters as they relate to life stages of the fish were to be evaluated in order to determine seasonal drawdown levels that are compatible with the needs of the fish. The timing and quantity of entrainment in Libby Dam outflows will be examined. Habitat preference of rainbow and burbot will be examined in the Kootenai River downstream from the dam.The specific objectives of this project have been 1. Examine cost-effective opportunities to enhance the reservoir fishery through nonoperational and operational mitigation techniques. 2. Assess ways to enhance the recruitment of juvenile gamefish species from reservoir tributaries. 3. Monitor zooplankton and gamefish populations in Libby Reservoir. 4. Determine Libby Dam operations necessary to enhance populations of sturgeon, burbot, rainbow trout, bull trout, and mountain whitefish in the Kootenai River. 5. Determine use of Kootenai River tributaries for spawning and rearing by fluvial burbot, rainbow trout, and bull trout. 6. Describe the diet of rainbow trout, burbot, and bull trout in the Kootenai River. 7. Determine the effects of stream regulation on the macrozoobenthos of the Kootenai River. 8. Determine the feasibility of reclaiming lost spawning and rearing habitat for Kootenai River fish by creating a fish bypass facility at the Lake Creek Dam. 9. Determine operations necessary to balance the Libby Reservoir fishery and the fishery in the Kootenai River. 10. Determine if deltas at tributary mouths in the Kootenai River are impeding spawning migrations; recommend removal of deltas if necessary. 11. Develop a coordinated plan for operations to enhance fisheries in the Kootenai River by working with IDFG and BC on biological and hydrological concerns
Milestones: In 1992/1993, reservoir productivity at various levels were studied. Entrainment studies were continued. Emphasis was on IFIM studies in Kootenai River to determine amount of flow from Libby Dam that would guarantee sturgeon spawning in river. This work was coordinated with IDFG and the Kootenai Tribe of Idaho.Studies in the reservoir focused on areas of utilization of target fish-quantifying and the timing and significance of fish entrainment in Libby outflows. Emphasis was placed on kokanee. In the river below the dam, utilization of specific habitats by rainbow and burbot was examined.The effect of the Libby Dam operation (including power-peaking) on benthic insect production, biomass, and diversity was determined. Techniques used during this study were consistent with a study completed in 1983 so that results can be directly compared. The University of Montana did the work.Other efforts included: 1. Work on fish entrainment through the Libby Dam penstocks and effects of operations on the river fishery continued in FY 1994 and FY 1995 to increase utility of the reservoir model. 2. Effects of stream fluctuations on burbot examined in FY 1994 and continue in FY 1995. 3. IFIM studies were completed in Kootenai River below dam to determine spawning area available to sturgeon at various river flows. Development of Integrated Rules Curves continues (FY 94 and 95) to balance all water uses in the Kootenai River system. FY 94: Spring and fall gill netting, kokanee spawner surveys, zooplankton monitoring, and spring and fall dual beam hydroacoustic surveys of the kokanee population were completed. Contract 1983BI12660 was completed and closed.
Results: All objectives of the Libby Dam entrainment study have been completed. Habitat preference data were collected for rainbow trout and mountain whitefish. The reservoir model now includes a hydrologic component downstream to Duncan and Corra Linn dams. Formed advisory group of anglers, other agencies, and citizens' groups to develop mitigation recommendations to the NPPC. Completed reservoir component of Libby Reservoir model. IFIM studies completed for sturgeon spawning habitat. Spring 1995 - 1990-1994 Progress report includes summary of entrainment study and updates on river and reservoir work.
Publications:
Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Research, evaluation, and studies
Tertiary: Development and testing of Models
Work Sites
Site/Subsite Names |
Site Type |
Types of Work Performed |
BARRON CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BIG CHERRY CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BIG CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Fish Traps (build, operate) |
BIG CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BIG CREEK, SOUTH FORK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BIG CREEK, SOUTH FORK, EAST BRANCH/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BOBTAIL CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
BRISTOW CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
CALLAHAN CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
CALLAHAN CREEK, NORTH FORK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
CLARENCE CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
CRIPPLE HORSE CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
DEEP CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
DODGE CREEK (C BRANCH AREA)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
DUNN CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
FISHER RIVER/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
FIVEMILE CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
FORTINE CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
GRANITE CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
GRAVE CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
KOOTENAI RIVER [MT]/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
LAKE CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
LAKE CREEK DAM (TROY DAM)/ | Dam (hydro-electric, reclamation, diversion, etc.) | Survey, study, research, monitor, evaluate |
LAKE KOOCANUSA/ | Reservoir (incl. lakes, ponds,etc.) | Consult, model / plan devel, gather data, edit |
LAKE KOOCANUSA/ | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
LIBBY CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
LIBBY DAM/ | Dam (hydro-electric, reclamation, diversion, etc.) | Consult, model / plan devel, gather data, edit |
LIBBY DAM/ | Dam (hydro-electric, reclamation, diversion, etc.) | Survey, study, research, monitor, evaluate |
O'BRIEN CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
PINKHAM CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
PIPE CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
QUARTZ CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
QUARTZ CREEK, WEST FORK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
SINCLAIR CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
SULLIVAN CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
SUTTON CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
TENMILE CREEK (KOOTENAI)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
WARLAND CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
YAAK RIVER/BELOW YAAK FALLS | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
YOUNG CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
Project Budget and Obligation:
Fiscal Year | Initially Authorized | Latest Authorized | Authorized Change | Obligation In Process | Bonneville Overhead | Contracted Obligation | Contracted Agent |
1983 |
$156,305 |
$0 |
$-156,305 |
$0 |
$0 |
$156,305 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1984 |
$327,567 |
$0 |
$-327,567 |
$0 |
$0 |
$112,561 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1984 |
|
|
|
$0 |
$0 |
$215,006 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1985 |
$524,014 |
$0 |
$-524,014 |
$0 |
$0 |
$231,908 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1985 |
|
|
|
$0 |
$0 |
$292,106 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1986 |
$472,871 |
$0 |
$-472,871 |
$0 |
$0 |
$472,871 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1987 |
$56,245 |
$0 |
$-56,245 |
$0 |
$0 |
$6,550 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1987 |
|
|
|
$0 |
$0 |
$49,695 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1988 |
$72,826 |
$0 |
$-72,826 |
$0 |
$0 |
$72,826 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1989 |
$50,000 |
$248,844 |
$198,844 |
$0 |
$0 |
$248,844 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1990 |
$110,000 |
$270,492 |
$160,492 |
$0 |
$0 |
$270,492 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1991 |
$217,000 |
$282,142 |
$65,142 |
$0 |
$0 |
$282,142 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1992 |
$275,000 |
$297,956 |
$22,956 |
$0 |
$0 |
$297,956 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1993 |
$275,000 |
$275,000 |
$0 |
$0 |
$0 |
$275,000 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1994 |
$325,000 |
$293,463 |
$-31,537 |
$0 |
$0 |
$6,939 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1994 |
|
|
|
$0 |
$0 |
$286,524 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1995 |
$325,000 |
$284,215 |
$-40,785 |
$0 |
$0 |
$4,500 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1995 |
|
|
|
$0 |
$0 |
$279,715 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1996 |
$325,000 |
$298,249 |
$-26,751 |
$0 |
$0 |
$298,249 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1997 |
$310,700 |
$310,700 |
$0 |
$0 |
$0 |
$310,700 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1998 |
$450,000 |
$308,004 |
$-141,996 |
$0 |
$0 |
$308,004 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
Totals: |
$4,272,528 |
$2,869,065 |
$-1,403,463 |
$0 |
$0 |
$4,478,893 |
. |
|