Location: COLUMBIA RIVER BASIN basin, including sites listed below.
KOOTENAI RIVER [MT], LAKE ROOSEVELT, LAKE ROOSEVELT, LAKE ROOSEVELT, LAKE ROOSEVELT, MOSCOW, SNAKE RIVER.
Summary Description: Provide basic life history information for white sturgeon. Investigate the responses of young sturgeon to changes in tempoerature, flow, and other variables. Address potential for artificial propagation. Identify genetic distinctions between populations.
Background: This multiyear study of sturgeon, formerly Project 8331600, provided basic life history information to be used in future evaluations of hydroelectric impacts.
Milestones: This study investigated the responses of young sturgeon to changes in temperature, flow, and other variables. It also addressed the potential for artificial propagation and identify genetic distinction between populations. The project continued through FY 1990.
Results: The results will be used to develop sturgeon protection, mitigation, and enhancement measures.
Publications:
Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Research, evaluation, and studies
Tertiary: Primarily studies of either whole life cycles or several phaseses thereof
Work Sites
Site/Subsite Names |
Site Type |
Types of Work Performed |
KOOTENAI RIVER [MT]/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
LAKE ROOSEVELT/BOSSBURG SECTION | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
LAKE ROOSEVELT/KETTLE FALLS BRIDGE TO EVANS | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
LAKE ROOSEVELT/NORTHPORT SECTION | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
LAKE ROOSEVELT/ROPER CREEK / KETTLE FALLS BRIDGE | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
MOSCOW/U OF IDAHO | Labs (research centers, etc.) | Survey, study, research, monitor, evaluate |
SNAKE RIVER/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
Project Budget and Obligation:
Fiscal Year | Initially Authorized | Latest Authorized | Authorized Change | Obligation In Process | Bonneville Overhead | Contracted Obligation | Contracted Agent |
1989 |
$0 |
$104,167 |
$104,167 |
$0 |
$0 |
$104,167 |
UNIVERSITY of IDAHO |
1990 |
$100,000 |
$99,940 |
$-60 |
$0 |
$0 |
$99,940 |
UNIVERSITY of IDAHO |
Totals: |
$100,000 |
$204,107 |
$104,107 |
$0 |
$0 |
$204,107 |
. |
|