Location: FLATHEAD SUBBASIN basin, including sites listed below.
COAL CREEK, COAL CREEK, ELLIOTT CREEK, FLATHEAD LAKE, FLATHEAD RIVER, FLATHEAD RIVER, MIDDLE FORK, FLATHEAD RIVER, NORTH FORK, HAY CREEK (FLATHEAD), HAY CREEK (FLATHEAD).
Summary Description: Determine the status of the fishery in Flathead River above Flathead Lake as a baseline for future mitigation projects. Install instream structures in Coal, Hay, & Elliot Creeks.
Background: Information was needed on the status of fishery and fishermen preference in Flathead River above Flathead Lake. Such information would be used to measure success of upcoming mitigation projects.
Milestones: Status of fishery in Flathead Lake was measured for later comparison after mitigation program is emplaced. Project provided baseline information. Installed erosion control structures in Coal Creek and Hay Creek. Developed mechanism to remove fence from spawning grounds. Installed spawning habitat structures in Elliot Creek. Creel work, fish census, and fisherman interviews were held.
Results: Status of fish stocks and fishermen preference will be used to make management decisions and evaluate success of fisheries mitigation, stream habitat improvements.
Publications:
Publication Title |
Report Type |
Coverage Years |
Published |
Pages |
DOE/BP Number |
Flathead River Creel | Final | 1992 - 1993 | Sep 1995 | | 60424-1 R 102 |
Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Fish habitat/ passage projects & watershed efforts
Tertiary: Implementation of field project work
Work Sites
Site/Subsite Names |
Site Type |
Types of Work Performed |
COAL CREEK/ | Stream (river, creek, canal, etc.) | Instream & bank construction |
COAL CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
ELLIOTT CREEK/ | Stream (river, creek, canal, etc.) | Instream & bank construction |
FLATHEAD LAKE/ | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
FLATHEAD RIVER/UPPER | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
FLATHEAD RIVER, MIDDLE FORK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
FLATHEAD RIVER, NORTH FORK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
HAY CREEK (FLATHEAD)/ | Stream (river, creek, canal, etc.) | Instream & bank construction |
HAY CREEK (FLATHEAD)/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
Project Budget and Obligation:
Fiscal Year | Initially Authorized | Latest Authorized | Authorized Change | Obligation In Process | Bonneville Overhead | Contracted Obligation | Contracted Agent |
1992 |
$0 |
$47,126 |
$47,126 |
$0 |
$0 |
$47,126 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
1993 |
$23,303 |
$23,303 |
$0 |
$0 |
$0 |
$23,303 |
MONTANA DEPARTMENT OF FISH & WILDLIFE - HELENA |
Totals: |
$23,303 |
$70,429 |
$47,126 |
$0 |
$0 |
$70,429 |
. |
|