Location: PEND OREILLE SUBBASIN basin, including sites listed below.
LAKE PEND OREILLE, SULLIVAN SPRINGS CREEK.
Summary Description: Monitor annually kokanee abundance and quality of spawning gravel. Assess impact of Albeni Fall Dam operation on lake levels and the kokanee population. Gather baseline data on kokanee abundance prior to the proposed lake level changes.
Background: Albeni Falls dam changes lake levels winter depending on downstream needs and weather conditions.The Army Corps of Engineers continually changes the operation of Albeni Falls Dam. Lake levels have raised as much as 5 feet after kokanee spawning (1994) and dropped as much as 2.3 feet (1986) after spawning. Lake levels have changed to help downstream flood control and aid repairs on downstream projects. In the Council’s program, 10.6E and 5.4D.7, lake levels will change once again to determine the effects on the reservoir’s fisheries and anadromous fisheries. To monitor all of these changes, a project needs to stay in place which annually estimates the abundance of each year class of kokanee. Monitoring kokanee in Lake Pend Oreille has been conducted under other BPA funded projects since 1985.
Milestones: The project received about $50,000 in funding from SOR budget before it was transferred into the Fish and Wildlife Program budget. Only Fish and Wildlife Program funding shows in the historic budget data for the project. Collected data concerning the possible effects of a higher winter operating pool level.
Results: Not recorded
Publications:
Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Monitoring, baseline, assessment, and O&M;
Tertiary: Impacts and outcomes of various conditions and facilities
Work Sites
Site/Subsite Names |
Site Type |
Types of Work Performed |
LAKE PEND OREILLE/ | Reservoir (incl. lakes, ponds,etc.) | Survey, study, research, monitor, evaluate |
SULLIVAN SPRINGS CREEK/ | Stream (river, creek, canal, etc.) | Survey, study, research, monitor, evaluate |
Project Budget and Obligation:
Fiscal Year | Initially Authorized | Latest Authorized | Authorized Change | Obligation In Process | Bonneville Overhead | Contracted Obligation | Contracted Agent |
1994 |
$0 |
$52,897 |
$52,897 |
$0 |
$0 |
$52,897 |
IDAHO DEPARTMENT OF FISH & GAME |
1995 |
$0 |
$52,930 |
$52,930 |
$0 |
$0 |
$52,930 |
IDAHO DEPARTMENT OF FISH & GAME |
Totals: |
$0 |
$105,827 |
$105,827 |
$0 |
$0 |
$105,827 |
. |
|