Project 199501300

NEZ PERCE TROUT PONDS - DESIGN, CONSTRUCT AND O&M;


Location: CLEARWATER basin, including sites listed below.
CLEARWATER RIVER, NORTH FORK, DEER CREEK (CLEARWATER), DWORSHAK RESERVOIR, MUD SPRINGS POND, MUD SPRINGS POND, TALMACKS POND, TALMACKS POND.

Summary Description: Complete emergency repair of two existing trout ponds and commence site inventory, design and construction of up to 12 additional fish ponds on the Nez Perce Reservation. Continue O&M; of facilities.

Background: Provide resident fish substitution for areas lost above Dworshak Reservoir.This project will provide emergency repair on two existing ponds on the reservation. The next phase will conduct site and feasibility work to site new rearing ponds for resident fish production.

Milestones: The following were completed by 1997: Talmaks Reservoir renovation (drain system repair, silt removal, dam heightening, and silt retention pond construction); Mud Springs Dam spillway installation; rainbow trout stocking; surveying the Mud springs fishery, and: potential new pond site identification. A Mud springs fishery survey was conducted from May through Sept. 1996. The contract 39757 was completed and closed in 1997. Work is continuing under a master agreement contract 30423 task order 93952. TBL contract 1997TX30113 taskorder 10022 for $4200 covering gathering floodplain and wetland plant information and determining permits required was issued in 1998. Mod 1 was an appraisal for the Deer Creek Property for $6,152. It was issued in 1999. Accomplishments: 1997 Completed restoration of the Talmaks Reservoir fishery. 1998 Completed restoration of Mud Springs Reservoir fishery. Identified Cold Springs and Deer Creek fishery sites. Collected environmental and cultural information needed to assess site suitability, develop engineering designs, and compile NEPA documentation

Results: Not recorded

Publications:
Publication Title Report Type Coverage Years Published Pages DOE/BP Number
Nez Perce Trout Ponds Annual 1996 - 1996 39757-1
R 133

Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Focus on producing fish
Tertiary: Plan, design, construct production facilities, i.e. hatcheries, acclimation ponds,etc.

Work Sites
Site/Subsite Names Site Type Types of Work Performed
CLEARWATER RIVER, NORTH FORK/UnknownConsult, model / plan devel, gather data, edit
DEER CREEK (CLEARWATER)/Riparian zoneSite / easement purchase (study, manage. plan)
DWORSHAK RESERVOIR/Reservoir (incl. lakes, ponds,etc.)Consult, model / plan devel, gather data, edit
MUD SPRINGS POND/Reservoir (incl. lakes, ponds,etc.)Building (plan, construction)
MUD SPRINGS POND/RIPARIAN ZONERiparian zoneSurvey, study, research, monitor, evaluate
TALMACKS POND/Reservoir (incl. lakes, ponds,etc.)Building (plan, construction)
TALMACKS POND/RIPARIAN ZONERiparian zoneSurvey, study, research, monitor, evaluate

Project Budget and Obligation:
Fiscal
Year
Initially
Authorized
Latest
Authorized
Authorized
Change
Obligation
In Process
Bonneville
Overhead
Contracted
Obligation
Contracted
Agent
1995 $150,000 $21,388 $-128,612 $0 $0 $21,388 NEZ PERCE TRIBE
1996 $158,000 $157,451 $-549 $0 $0 $157,451 NEZ PERCE TRIBE
1997 $286,800 $286,496 $-304 $0 $0 $286,496 NEZ PERCE TRIBE
1998 $750,000 $670,949 $-79,051 $0 $0 $666,749 NEZ PERCE TRIBE
1998 $0 $0 $4,200 TRANSMISSION BUSINESS LINE
1999 $749,263 $814,678 $65,415 $0 $0 $6,152 TRANSMISSION BUSINESS LINE
Totals: $2,094,063 $1,950,962 $-143,101 $0 $0 $1,142,436 .