Fish and Wildlife Project Summary

Project 199501600

GENETIC INVENTORY - WESTSLOPE CUTTHROAT TROUT


Location: CLEARWATER basin, including sites listed below.
CLEARWATER RIVER, NORTH FORK, DWORSHAK RESERVOIR.

Summary Description: Conduct a genetic inventory of westslope cutthroat trout in the North Fork Clearwater River Drainage to determine the genetic status, including the extent of introgression by introduced rainbow trout.

Background: Hybridization with exotic trout is considered the greatest threat to the conservation of the native westslope cutthroat trout in northern Idaho and western Montana. Although several studies have determined that genetically pure populations of westslope cutthroat trout remain in less than 2.5% of the historic range in Montana, little genetic sampling has been done in Idaho. The NPPC approved the authorizing measure for project 9501600 based on recommendations from project 8740700. Authorization of this project by the NPPC required interagency consultation and concurrence with the Idaho Department of Fish and Game, National Marine Fisheries Service, Bonneville Power Administration, Bureau of Reclamation and Corps of Engineers.

Milestones: Determine genetic purity 12/95. est baseline monitoring 9/96 assess stocking activities. Contract 1995BI61768 for $183,782 was issued in 1995. Mod 1 in 1996 was a no-cost time extension. Mod 2 was a no-cost time extension in 1997. The contract was completed and closed in 1999.

Results: Not recorded

Publications:
Publication Title Report Type Coverage Years Published Pages DOE/BP Number
Genetic Inventory of Westslope Cutthroat Trout in the North Fork Clearwater Basin Annual 1996 - 1996 Apr 1997 61768-1
R 124

Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Research, evaluation, and studies
Tertiary: Basline surveys and research, feasility studies

Work Sites
Site/Subsite Names Site Type Types of Work Performed
CLEARWATER RIVER, NORTH FORK/Stream (river, creek, canal, etc.)Survey, study, research, monitor, evaluate
DWORSHAK RESERVOIR/Reservoir (incl. lakes, ponds,etc.)Survey, study, research, monitor, evaluate

Project Budget and Obligation:
Fiscal
Year
Initially
Authorized
Latest
Authorized
Authorized
Change
Obligation
In Process
Bonneville
Overhead
Contracted
Obligation
Contracted
Agent
1995 $185,000 $183,782 $-1,218 $0 $0 $183,782 NEZ PERCE TRIBE
1997 $167,300 $163,992 $-3,308 $0 $0 $163,992 NEZ PERCE TRIBE
1998 $202,000 $198,609 $-3,391 $0 $0 $198,609 NEZ PERCE TRIBE
Totals: $554,300 $546,383 $-7,917 $0 $0 $546,383 .