Fish and Wildlife Project Summary

Project 199700900

EVALUATE SNAKE RIVER STURGEON POPULATION


Location: LOWER SNAKE MAINSTEM basin, including sites listed below.
SNAKE RIVER, SNAKE RIVER.

Summary Description: Evaluate the need and identify potential measures for protecting and rebuilding sturgeon populations conducive to subsistence harvest between Lower Granite and Hells Canyon Dam. This project was original a part of 8605000.

Background: The development of the Columiba River Basin hydroelectric system has created numerous impoundments and severely restricted movements of the white sturgeon and two of their principle food sources, eulachon and lamprey, and degraded or destoyed sturgeon spawning and rearing habitat. This has severely impacted sturgeon populations and some may face extinction.

Milestones: Identify reproductive and life history characteristics of white sturgeon in the Snake River between Lower Granite and Hells Canyon Dam. Identify and quantify habitat used for spawning and rearing in this portion of the Snake river. Evaluate the need and identify potential measures for protecting and rebuilding sturgeon populations conducive to subsistence harvest between Lower Granite and Hells Canyon Dam.

Results: None identified.

Publications:
Publication Title Report Type Coverage Years Published Pages DOE/BP Number
Evaluate Potential Means of Rebuilding Sturgeon Populations in the Snake River between Lower Granite and Hells Canyon Dams Annual 1997 - 1997 Feb 2004 30423-9
R 243

Project Classification Keys:
Primary: All projects in the Resident Fish Program
Secondary: Research, evaluation, and studies
Tertiary: Mitigation and recovery planning

Work Sites
Site/Subsite Names Site Type Types of Work Performed
SNAKE RIVER/LOWER GRANITE TO HELLS CANYON DAMStream (river, creek, canal, etc.)Consult, model / plan devel, gather data, edit
SNAKE RIVER/LOWER GRANITE TO HELLS CANYON DAMStream (river, creek, canal, etc.)Survey, study, research, monitor, evaluate

Project Budget and Obligation:
Fiscal
Year
Initially
Authorized
Latest
Authorized
Authorized
Change
Obligation
In Process
Bonneville
Overhead
Contracted
Obligation
Contracted
Agent
1997 $0 $258,106 $258,106 $0 $0 $258,106 NEZ PERCE TRIBE
1998 $390,600 $390,007 $-593 $0 $0 $390,007 NEZ PERCE TRIBE
Totals: $390,600 $648,113 $257,513 $0 $0 $648,113 .