FRF Buildings and Facilities
|
|
The Research Pier![]()
The concrete and steel research pier is the centerpiece of the FRF. It took two years to construct
and was completed in 1977. It was constructed to survive severe storm conditions. The pier deck
is 6 m (20 ft) wide and extends 560 m (1840 ft) from the dune to a nominal water depth of
approximately 7 m (21 ft). The deck is supported on 1 m (3 ft) diameter steel pilings which are
imbedded 15-18 m (50-60 ft) below the ocean bottom.
|
The pier deck is 7.7 m (25 ft) above the sea surface and was designed to stay above the storm waves. However, the the deck has been overtopped, particularly during the Halloween storm of 1991. |
At the top of the tower is a 2.1 square meter (7 square ft)
room equipped with 110 volt power, an
intercom to the FRF Building, and coax video
cables to the FRF's video lab. This room also
has the best view in Duck!!
There are two major buildings. The main laboratory, completed in 1980, houses the main
computer system, electronics repair facility, and offices.
The Workshop/Conference Room Facilities include a garage, work shops, SCUBA locker,
conference room (26 x 35.5 ft) and technical library. The conference room is equipped with a rear projection screen for video,
computer, and slide projection and has a great view of the Atlantic.
The conference facility easily handles 30 people and is available for use.
|