Home > Electronic Reading Room
> Document Collections > Interim Staff Guidance
> Interim Staff Guidance Used by the Spent Fuel Project Staff
Interim Staff Guidance Used by the Spent
Fuel Project Staff
All links on this page are to documents in portable document format (PDF). See our Plugins, Viewers, and Other Tools page for more information.
ISG-1, Rev 1 |
Damaged Fuel |
ISG-2 |
Fuel Retrievability |
ISG-3 |
Post Accident Recovery and Compliance with 10 CFR 72.122(l) |
ISG-4, Rev 1 |
Cask Closure Weld Inspections |
ISG-5, Rev 1 |
Confinement Evaluation |
ISG-6 |
Establishing Minimum Initial Enrichment for the Bounding Design Basis
Fuel Assembly(s) |
ISG-7 |
Potential Generic Issue Concerning Cask Heat Transfer in a Transportation
Accident |
ISG-8, Rev 2 |
Burnup Credit in the Criticality Safety Analyses of PWR Spent Fuel in
Transport and Storage Casks |
ISG-9, Rev 1 |
Storage of Components Associated with Fuel Assemblies |
ISG-10, Rev 1 |
Alternatives to the ASME Code |
ISG-11, Rev 3 |
Spent Fuel Project Office Interim Staff Guidance |
ISG-12, Rev 1 |
Buckling of Irradiated Fuel Under Bottom End Drop Conditions |
ISG-13 |
Real Individual |
ISG-14 |
Supplemental Shielding |
ISG-15 |
Materials Evaluation |
ISG-16 |
Emergency Planning |
ISG-17 |
Interim Storage of Greater Than Class C Waste |
ISG-18 |
The Design/Qualification of Final Closure Welds on Austenitic Stainless
Steel Canisters as Confinement Boundary for Spent Fuel Storage and
Containment Boundary for Spent Fuel Transportation |
ISG-19 |
Moderator Exclusion under Hypothetical Accident Conditions
and Demonstrating Subcriticality of Spent Fuel
under the Requirements of 10 CFR 71.55(e) |
|