NRC Seal/Skip Navigation
Index | Site Map | FAQ | Help | Glossary | Contact Us         Advanced Search

Home Who We Are What We Do Nuclear Reactors Nuclear Materials Radioactive Waste Facility Info Finder Public Involvement Electronic Reading Room
Nuclear Reactors
Regulated Reactors
Power Reactors
Research and Test Reactors
Regulated Activities
Operating Reactors
Operator Licensing
New Reactor Licensing
Plant Specific Items of Interest
Reactor Decommissioning
Quick Links
Reactors Quick Links

Research and Test Reactors

On this page:

Regulatory Oversight

The NRC's Office of Nuclear Reactor Regulation (NRR) has oversight responsibility for the licensing of research and test reactors. Within NRR, the staff within the Research and Test Reactors Section (R&TR), of the New, Research and Test Reactors Project Directorate (RNRP) perform most functions associated with the regulation of Research and Test Reactors. These efforts take the facility from initial licensing through license termination. There are Three major oversight responsibilities for research and test reactors: Program Management, Inspection, and Operator Licensing.

The Research and Test Reactor staff offer an introductory course that provides a general familiarity with Research and Test Reactor designs, facilities, equipment, operating characteristics, technical specifications, inspection requirements, and current areas of concern to the NRC.

For additional information, and or interest in attending the introductory course, please Contact Us.

To top of page

Program Management

The Program Management staff act as the NRC's focal point for research and test reactor policy and technology. This function includes all NRC actions taken with respect to the facility license. It involves approval of license requirements for each facility consistent with NRC Regulations and ensuring an acceptable level of safety.

In recent years, non-routine licensing actions have included initial licensing license renewals and extensions, decommissioning plan reviews, license terminations, conversion to low-enriched uranium fuel, power upgrades, and other license changes. Routine licensing actions have included program reviews (e.g., emergency preparedness, operator requalification, and security changes). The NRC often uses technical assistance from DOE's National Laboratories to supplement NRC staff efforts in conducting the high number of complex reviews required by the licensees.

In addition Program Management includes the review and coordination of all inspection, enforcement and allegation activities for their assigned licensees.

To top of page

Inspection

NRC staff inspect each facility periodically to ensure that the licensees safely conduct regulated activities. The NRC maintains two types of inspections\ programs for operating research and test reactors. For research and test reactors licensed to operate at power levels of 2 megawatts (2,000,000 watts) or greater, the inspection program is completed annually. For reactors licensed to operate at power levels below 2 megawatts, the inspection program is completed biennially (every two years).

Inspection programs for operating reactors include: organizational structure, qualifications and responsibilities, operational activities, design and design control, review and audit functions, radiation and environmental protection, operator requalification, maintenance and surveillance activities, fuel handling, experiments, procedures, emergency preparedness, and safeguards and security.

Those reactors that are shutdown and are not being decontaminated have an abbreviated inspection program completed triennially. NRC inspects decommissioning reactors as required for their condition to verify safe conduct of dismantlement and decontamination.

The NRC Inspection Manual Chapter 2545 PDF Icon, contains the guidance which the NRC uses to administer the Research and Test Reactor Inspection Process.

For information on Inspection Procedures IP 69001 through 69013, see the table below. See also, our complete collection of Inspection Procedures.

The following links on this page are to documents in Adobe Portable Document Format (PDF). See our Plugins, Viewers, and Other Tools page for more information.

Document Description
IP 69001 Class II NonPower Reactors
IP 69002 Class III Research and Test Reactors
IP 69003 Class I NonPower Reactor Operator Licenses, Requalification, and Medical Activities
IP 69004 Class I NonPower Reactor Effluent and Environmental Monitoring
IP 69005 Class I NonPower Reactor Experiments
IP 69006 Class I Research and Test Reactors Organization and Operations and Maintenance Activities
IP 69007 Class I Research and Test Reactor Review and Audit and Design Change Functions
IP 69008 Class I Research and Test Reactor Procedures
IP 69009 Class I Research and Test Reactor Fuel Movement
IP 69010 Class I Research and Test Reactor Surveillance
IP 69011 Class I Research and Test Reactor Emergency Preparedness
IP 69012 Class I Research and Test Reactors Radiation Protection
IP 69013 Research and Test Reactor Decommissioning

To top of page

Operator Licensing

The Commission’s regulations (10 CFR Part 55) require the pesonnel who operate a reactor to have either a Reactor Operator or a Senior Operator license issued by the NRC. Reactor Operators are licensed to operate the reactor under most routine conditions without supervision. However, Senior Operator must be present to supervise operation of the reactor during some non-routine plant conditions. In addition, Senior Operators are usually responsible for plant conditions during emergencies.

To ensure that they have the required knowledge, skills and abilities to control the reactor during both routine evolutions and emergencies the NRC prepares and administers both a comprehensive written examination and a hands-on operating test to all candidates for a new reactor operator or senior operator license. These examinations are designed to measure the candidate's qualifications to operate the reactor and are based on the requirements of Commission’s regulations (in 10 CFR Part 55). The NRC issues licenses for six-year periods.

Once licensed, operators and senior operators are required to maintain their expertise. Each facility is required to maintain a Requalification Program, covering both refresher training (material covered during initial licensing) and training on systems recently changed. The training program is divided into two year cycles and requires a comprehensive written examination, and annual operating tests. These examinations are administered by the facility staff. At the end of the six year period, operators and senior operators are required to submit a renewal application to keep their license. As part of their application, the applicant must certify satisfactory participation in the Requalification Program.

To top of page



Privacy Policy | Site Disclaimer
Last revised Monday, June 21, 2004