PENTAGON METRO ENTRANCE FACILITY
GRAND OPENING
November 21, 2002
Acting Program Manager for the Pentagon Renovation Program addresses the crowd gathered to celebrate the completion of the Pentagon Metro Entrance Facility Project. The Metro Entrance Facility was a security-driven project designed to eliminate the direct entry from the Metro tunnel and provide a secure screening facility for Pentagon visitors.
Acting Program Manager for the Pentagon Renovation Program addresses the crowd gathered to celebrate the completion of the Pentagon Metro Entrance Facility Project. The Metro Entrance Facility was a security-driven project designed to eliminate the direct entry from the Metro tunnel and provide a secure screening facility for Pentagon visitors.

Ribbon cutting.
Participating in the ceremony, from left to right, are Chuck Malacarne, MEF Project Team Leader, John Pugrud, Deputy Chief of the Pentagon Force Protection Agency, Aren Almon-Kok, founder of the Protecting People First Foundation, Ray DuBois, Director of Administration and Management and Mike Sullivan, Acting Program Manager for the Pentagon Renovation Program.

The new Pentagon Metro Entrance Facilty is the new location for the Pentagon tour office and badge office.
The new Pentagon Metro Entrance Facilty is the new location for the Pentagon tour office and badge office. Several promotional displays in the tour office provided a colorful backdrop for the Grand Opening Ceremony.



Read the press release on DefenseLink:
Press Release on DefenseLINK web site.

METRO ENTRANCE FACILITY CELEBRATES
INITIAL OPENING!


A pre-dawn view of the newly-opened MEF escalators.
A pre-dawn view of the newly-opened
MEF escalators.

Pentagon commuters taking advantage of the shorter walk made possible by the new covered patwhay to the building
Pentagon commuters taking advantage of the shorter walk made possible by the new covered pathway to the building.

Pentagon employees can check in at the opening of the facility and proceed directly into the building.
Pentagon employees can check in at
the opening of the facility and proceed directly into the building.


On July 31, the Pentagon Renovation Program proudly celebrated the initial opening of the Metro Entrance Facility (MEF). While the entire facility won't be completed until November 2002, commuters no longer need to walk around the entire construction area in order to enter the building. A canopy-covered walkway to the MEF allows Pentagon commuters direct access to the building from the bus loop and the Metro Rail escalators.

METRO ENTRANCE FACILITY PEDESTRIAN WALKWAY PROGRESS PHOTOS

 

July 15, 2002 -A view of the escalators that feed into and out of the Metro Entrance Facility
A view of the escalators that feed into and out of the Metro Entrance Facility

July 15, 2002 - This photo shows the construction happening on the interior of the Metro Entrance Facility
This photo shows the construction happening on the interior of the Metro Entrance Facility

July 15, 2002 - Once finished, the new, covered pathway will lead pedestrians from the Bus Loop directly to the building
Once finished, the new, covered pathway will lead pedestrians from the Bus Loop directly to the building

 
Transit Users Access Routes as of July 31st
Diagram of route from the bus platform to Metro Rail
Bus to Rail Transfer
Diagram of route from the bus platform to the Pentagon
Bus to Pentagon
Diagram of route from the Metro Rail to the Pentagon
Rail to Pentagon
Diagram of route from the Metro Rail to the Pentagon for Disabled
Rail to Pentagon
for Disabled
Diagram of route from the bus platform to the Slug Lines
Bus to Slug Lines
Diagram of route from the Metro Rail to the Slug Lines
Rail to Slug Lines
Click on Image for Larger Version

Progress Photos
Click on image to view a larger version.

June 30, 2002
Aerial view of the new Metro Entrance Facility and construction site.
Aerial view of the new Metro Entrance Facility
and construction site.

June 30, 2002
Aerial view of the Metro Entrance Facility looking towards the East.
Aerial view of the Metro Entrance Facility looking
towards the East.

July 19, 2002 - New Elevator Shaft
July 19, 2002 -
New Elevator Shaft

July 19, 2002 - MEF West Isometric View
July 19, 2002 - MEF West Isometric View

July 19, 2002 - Lobby Area
July 19, 2002 - Lobby Area

July 19, 2002 - Limestone exterior
July 19, 2002 - Limestone exterior

July 19, 2002 - Limstone exterior
July 19, 2002 - Limestone exterior

July 19, 2002 - New Elevator Shaft
July 19, 2002 -
Large Fan Installed
in Ceiling

July 19, 2002 -Fire Lane
July 19, 2002 -
Fire Lane

July 19, 2002 - Escalators in Lobby
July 19, 2002 - Escalators in Lobby

July 19, 2002 - DoD area
July 19, 2002 -
DoD Area

July 19, 2002 - Concrete Pour for Walkway
July 19, 2002 - Concrete Pour for Walkway

July 19, 2002 - Concrete Pour for Walkway
July 19, 2002 - Concrete Pour for Walkway

July 19, 2002 - Canopy Construction
July 19, 2002 - Canopy Construction

July 19, 2002 - Berms and Bulldozer
July 19, 2002 - Berms and Bulldozer

July 19, 2002 - Berms and Bulldozer
July 19, 2002 - Berms and Bulldozer

July 19, 2002 - Berms and Bulldozer
July 19, 2002 -
Air Handling Unit

 

Tuesday, December 18, 2001

PENTAGON TRANSIT CENTER OPEN!
The Pentagon Transit Center portion of the Metro Entrance Facility is now open and operational. Bus service has now returned to the Pentagon following the relocation to Pentagon City as a result of the events of September 11th, 2001. The Pentagon Renovation Program would like to remind transit users that portions of the facility are still under construction.

New escalators The new Pentagon Transit Center is a modern design incorporating many suggestions from accessibility focus groups.

Grand Opening Ceremony Ceremony
David O. Cooke, Director of Administration and Management, address a crowd at the Grand Opening Ceremony held on December 17th. To his left, Congressman James Moran and Pentagon Renovation Program Manager, Lee Evey, look on.

The new bus facility is only a part of the new Pentagon Metro Entrance Facility project. It was necessary to construct the replacement before the existing bus facility could be demolished. Now, while the demolition is completed and the new Pentagon entrance is constructed, it is not possible to maintain safe pedestrian passage through the site. So, pedestrians must be routed around the site. This current walkway configuration is temporary.

To minimize the duration of this inconvenience to users of the facility, a portion of the new Pentagon entrance will be constructed to expedite direct access into the Pentagon. Components of this access will be temporary (such as barricades), but other elements will be part of the permanent structure (such as elevators and escalators). This configuration is expected to be in place by July 31, 2002.

This configuration, too, will be temporary. Construction on the remainder of the structure will continue until the entire Pentagon entrance is completed in November 2002. Only then will all pathways between the Pentagon, the Pentagon Metro Station, the new Pentagon Transit Center, and parking areas be completed.

Bus Facility

Bus Riders
To mark the opening of the new facility, project managers gave the new Pentagon Transit Center a patriotic feel with red, white and blue lighting. To the right, transit users board a bus on the upper platform early Monday morning.
 
 

CONTACT INFORMATION