Review Session Title: NP101-Food Animal Production Panel Review |
Reviews Status: Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 43 |
Planned Duration: 60 months |
NPS List Review/Direction: March-September 2006 |
Begin Preparing Prospectuses: September 2006 |
Prospectuses due to OSQR: November 2006 |
Project Plans due to OSQR: April 2007 |
Termination Date: February 2008 |
Panel Convenes: June 2007 |
|
Ad Hoc Cut-Off Date: March 31, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP103-Animal Health Panel Review |
Reviews Status: Long-term planning in progress. No new ad hocs are being scheduled in this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 44 |
Planned Duration: 60 months |
NPS List Review/Direction: May-September 2005 |
Begin Preparing Prospectuses: September 2005 |
Prospectuses due to OSQR: November 2005 |
Project Plans due to OSQR: April 2006 |
Termination Date: January 2007 |
Panel Convenes: May-June 2006 |
|
Ad Hoc Cut-Off Date: May 31, 2003. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP104-Veterinary, Medical & Urban Entomology Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Veterinary, Medical & Urban Entomology National Program must be considered for an updated peer review. New projects established prior to June 2006 will receive an ad hoc peer review. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 15 |
Planned Duration: 60 months |
NPS List Review/Direction: June-October 2008 |
Begin Preparing Prospectuses: October 2008 |
Prospectuses due to OSQR: December 2008 |
Project Plans due to OSQR: April 2009 |
Termination Date: March 2010 |
Panel Convenes: May-June 2009 |
|
Ad Hoc Cut-Off Date: June 30, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP104-Veterinary, Medical & Urban Entomology Panel Review |
Reviews Status: Revision and certification in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 21 |
Planned Duration: 60 months |
NPS List Review/Direction: May-September 2003-completed |
Begin Preparing Prospectuses: September 2003 |
Prospectuses due to OSQR: December 2003-complete |
Project Plans due to OSQR: April 2004-complete |
Termination Date: February 2005 |
Panel Convenes: May-June 2004-complete |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP105-Animal Well-Being and Stress Control Systems Ad Hoc Review-Fall 2004 |
Reviews Status: Reviewer selection in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 31 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004-complete |
Project Plans due to OSQR: September 2004-complete |
Termination Date: July 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP105-Animal Well-Being and Stress Control Systems Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Animal Well-Being and Stress Control Systems National Program must be considered for an updated peer review. No new ad hocs are being scheduled for this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 5 |
Planned Duration: 60 months |
NPS List Review/Direction: March-September 2006 |
Begin Preparing Prospectuses: September 2006 |
Prospectuses due to OSQR: November 2006 |
Project Plans due to OSQR: April 2007 |
Termination Date: January 2008 |
Panel Convenes: June 2007 |
|
Ad Hoc Cut-Off Date: March 31, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP106-Aquaculture Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 53 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004 |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP106-Aquaculture Ad Hoc Review-September 2005 |
Reviews Status: Prospectus due to OSQR April 22, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 46 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP106-Aquaculture Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Aquaculture National Program must be considered for an updated peer review. New projects established prior to August 2006 will receive an ad hoc peer review. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 25 |
Planned Duration: 60 months |
NPS List Review/Direction: August-December 2008 |
Begin Preparing Prospectuses: December 2008 |
Prospectuses due to OSQR: February 2009 |
Project Plans due to OSQR: June 2009 |
Termination Date: May 2010 |
Panel Convenes: August-September 2009 |
|
Ad Hoc Cut-Off Date: August 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP106-Aquaculture Panel Review |
Reviews Status: Revision and certification in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 25 |
Planned Duration: 60 months |
NPS List Review/Direction: August 2003-complete |
Begin Preparing Prospectuses: December 2003-complete |
Prospectuses due to OSQR: February 2004-complete |
Project Plans due to OSQR: June 2004-complete |
Termination Date: April 2005 |
Panel Convenes: August 2004-complete |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP107-Human Nutrition Ad Hoc Review-Fall 2004 |
Reviews Status: Reviewer selection in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 45 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004 |
Project Plans due to OSQR: September 2004-complete |
Termination Date: July 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP107-Human Nutrition Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 2 |
Planned Duration: 40 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004 |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP107-Human Nutrition Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Human Nutrition National Program must be considered for an updated peer review. New projects established prior to August 2005 will receive an ad hoc peer review. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 120 |
Planned Duration: 60 months |
NPS List Review/Direction: August-December 2007 |
Begin Preparing Prospectuses: December 2007 |
Prospectuses due to OSQR: February 2008 |
Project Plans due to OSQR: June 2008 |
Termination Date: April 2009 |
Panel Convenes: June-August 2008 |
|
Ad Hoc Cut-Off Date: August 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP107-Human Nutrition Panel Review |
Reviews Status: Revision and certifications in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 62 |
Planned Duration: 60 months |
NPS List Review/Direction: August 2002-completed |
Begin Preparing Prospectuses: December 2002 |
Prospectuses due to OSQR: February 2003-complete |
Project Plans due to OSQR: June 2003-completed |
Termination Date: July 2004 |
Panel Convenes: August-September 2003-complete |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP108-Food Safety Panel Review |
Reviews Status: Prospectuses due to OSQR February 10, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 84 |
Planned Duration: 60 months |
NPS List Review/Direction: August 2004-complete |
Begin Preparing Prospectuses: December 2004 |
Prospectuses due to OSQR: February 2005 |
Project Plans due to OSQR: June 2005 |
Termination Date: May 2006 |
Panel Convenes: August 2005 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP201-Water Quality Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 16 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP201-Water Quality and Management Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Water Quality and Management National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 57 |
Planned Duration: 60 months |
NPS List Review/Direction: June 2005 |
Begin Preparing Prospectuses: November 2005 |
Prospectuses due to OSQR: February 2006 |
Project Plans due to OSQR: June 2006 |
Termination Date: April 2007 |
Panel Convenes: August 2006 |
|
Ad Hoc Cut-Off Date: June 30, 2003. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP201-Water Quality and Management Special Initiative Panel Review |
Reviews Status: Panel meets in October. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 60 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004-complete |
Project Plans due to OSQR: September 2004-complete |
Ad Hoc Review Period: N/A |
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP202-Soil Resource Management Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Soil Resource Management National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this Program. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 32 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2004-March 2005 |
Begin Preparing Prospectuses: April 2005 |
Prospectuses due to OSQR: May 2005 |
Project Plans due to OSQR: October 2005 |
Termination Date: August 2006 |
Panel Convenes: December 2005 |
|
Ad Hoc Cut-Off Date: December 31, 2002. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP203-Air Quality Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Air Quality National Program must be considered for an updated peer review. No new ad hocs are being scheduled in this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 6 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2005 |
Begin Preparing Prospectuses: April 2006 |
Prospectuses due to OSQR: June 2006 |
Project Plans due to OSQR: October 2006 |
Termination Date: August 31, 2007 |
Panel Convenes: October-December 2006 |
|
Ad Hoc Cut-Off Date: December 31, 2003. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP204-Global Change Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Global Change National Program must be considered for an updated peer review. New projects established prior to August 2006 will receive an ad hoc peer review. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 11 |
Planned Duration: 60 months |
NPS List Review/Direction: August-December 2008 |
Begin Preparing Prospectuses: December 2008 |
Prospectuses due to OSQR: February 2009 |
Project Plans due to OSQR: June 2009 |
Termination Date: May 2010 |
Panel Convenes: August-September 2009 |
|
Ad Hoc Cut-Off Date: August 31, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP204-Global Change Panel Review |
Reviews Status: Revision and certification in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 11 |
Planned Duration: 60 months |
NPS List Review/Direction: August 2003-complete |
Begin Preparing Prospectuses: December 2003 |
Prospectuses due to OSQR: February 2004-complete |
Project Plans due to OSQR: June 2004-complete |
Termination Date: March 2005 |
Panel Convenes: August 2004-complete |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP205-Rangeland, Pasture and Forages Ad Hoc Review-September 2005 |
Reviews Status: Preliminary planning. Prospectus due April 22, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 20 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP205-Rangeland, Pasture and Forages Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Rangeland, Pasture and Forages National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 32 |
Planned Duration: 60 months |
NPS List Review/Direction: March 2006 |
Begin Preparing Prospectuses: September 2006 |
Prospectuses due to OSQR: November 2006 |
Project Plans due to OSQR: April 2007 |
Termination Date: February 2008 |
Panel Convenes: June 2007 |
|
Ad Hoc Cut-Off Date: March 31, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP206-Manure and Byproduct Utilization Ad Hoc Review-September 2005 |
Reviews Status: Preliminary planning. Prospectus due April 22, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 48 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP206-Manure and Byproduct Utilization Panel Review |
Reviews Status: Panelist selection in progress. Project plans are due December 21, 2004. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 23 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2003-April 2004 |
Begin Preparing Prospectuses: April 2004 |
Prospectuses due to OSQR: July 2004-complete |
Project Plans due to OSQR: December 2004 |
Termination Date: October 2005 |
Panel Convenes: December 2004-February 2005 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP207-Integrated Agricultural Systems Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 38 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP207-Integrated Agricultural Systems Ad Hoc Review-Winter 2004 |
Reviews Status: Review in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 50 months |
NPS List Review/Direction: April-July 2003 |
Begin Preparing Prospectuses: July 2003 |
Prospectuses due to OSQR: October 2003-complete |
Project Plans due to OSQR: March 2004-complete |
Termination Date: December 2004 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP207-Integrated Agricultural Systems Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Integrated Agricultural Systems National Program must be considered for an updated peer review. New projects established prior to May 2005 will receive an ad hoc peer review. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 21 |
Planned Duration: 60 months |
NPS List Review/Direction: May-September 2007 |
Begin Preparing Prospectuses: October 2007 |
Prospectuses due to OSQR: December 2007 |
Project Plans due to OSQR: April 2008 |
Termination Date: February 2009 |
Panel Convenes: May-June 2008 |
|
Ad Hoc Cut-Off Date: May 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP301-Plant, Microbial & Insect...Ad Hoc Review-Fall 2004 |
Reviews Status: Reviewer selection in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 5 |
Planned Duration: 40 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004-complete |
Project Plans due to OSQR: September 2004 |
Termination Date: July 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP301-Plant, Microbial & Insect...Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 3 |
Planned Duration: 33 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP301-Plant, Microbial & Insect...Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Plant, Microbial & Insect Genetic... National Program must be considered for an updated peer review. New projects established prior to November 2004 will receive an ad hoc peer review. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 139 |
Planned Duration: 60 months |
NPS List Review/Direction: November 2006-March 2007 |
Begin Preparing Prospectuses: March 2007 |
Prospectuses due to OSQR: May 2007 |
Project Plans due to OSQR: October 2007 |
Termination Date: October 2008 |
Panel Convenes: December 2007-February 2008 |
|
Ad Hoc Cut-Off Date: November 30, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP302-Plant Biological and Molecular Processes Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Plant Biological & Molecular Processes National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this Program. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 48 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2004-March 2005 |
Begin Preparing Prospectuses: April 2005 |
Prospectuses due to OSQR: May 2005 |
Project Plans due to OSQR: October 2005 |
Termination Date: August 2006 |
Panel Convenes: December 2005 |
|
Ad Hoc Cut-Off Date: December 31, 2002. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP303-Plant Diseases Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 2 |
Planned Duration: 34 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP303-Plant Diseases Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Plant Diseases National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this program. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 69 |
Planned Duration: 60 months |
NPS List Review/Direction: May 2006 |
Begin Preparing Prospectuses: November 2006 |
Prospectuses due to OSQR: February 2007 |
Project Plans due to OSQR: June 2007 |
Termination Date: April 2008 |
Panel Convenes: August 2007 |
|
Ad Hoc Cut-Off Date: May 31, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP304(Schedule A)-Systems & Related Approaches for Insect & Mite Management; Identification & Classification of Insects & Mites Panel Review |
Reviews Status: Panelist selection in progress. Project plans due to OSQR October 22, 2004. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 23 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2003-April 2004-completed |
Begin Preparing Prospectuses: April 2004 |
Prospectuses due to OSQR: June 2004-complete |
Project Plans due to OSQR: October 2004 |
Termination Date: October 2005 |
Panel Convenes: December 2004 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP304(Schedule B)-Postharvest Pest Exclusion, & Quarantine Treatment for Insects & Mites; Weed Science Panel Review |
Reviews Status: Panelist selection in progress. Project plans due to OSQR November 19, 2004. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 35 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2003-April 2004-completed |
Begin Preparing Prospectuses: April 2004 |
Prospectuses due to OSQR: June 2004-complete |
Project Plans due to OSQR: November 2004 |
Termination Date: October 2005 |
Panel Convenes: December 2004-January 2005 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP304(Schedule C)-Fundamental Biology & Ecology of Insects & Mites; Biological Control & Development for Insects & Mites Panel Review |
Reviews Status: Panelist selection in progress. Project Plans are due to OSQR December 21, 2004. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 47 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2003-April 2004-completed |
Begin Preparing Prospectuses: April 2004 |
Prospectuses due to OSQR: July 30, 2004-Complete |
Project Plans due to OSQR: December 2004 |
Termination Date: October 2005 |
Panel Convenes: December 2004-March 2005 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP304-Crop Protection & Quarantine Ad Hoc Review-September 2005 |
Reviews Status: Preliminary planning. Prospectus due April 22, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 4 |
Planned Duration: 48 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP305-Crop Production Ad Hoc Review-Fall 2004 |
Reviews Status: Reviewer selection in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 44 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004-complete |
Project Plans due to OSQR: September 2004-complete |
Termination Date: July 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP305-Crop Production Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 38 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP305-Crop Production Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Crop Production National Program must be considered for an updated peer review. New projects established prior to May 2005 will receive an ad hoc peer review. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 23 |
Planned Duration: 60 months |
NPS List Review/Direction: May-September 2007 |
Begin Preparing Prospectuses: October 2007 |
Prospectuses due to OSQR: December 2007 |
Project Plans due to OSQR: April 2008 |
Termination Date: February 2009 |
Panel Convenes: May-June 2008 |
|
Ad Hoc Cut-Off Date: May 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP306(Schedule A)-Agricultural Fibers, Non-Lipid Biobased Technologies; Food Animal Processing & Production Panel Review |
Reviews Status: Revisions and certifications in progress. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 35 |
Planned Duration: 60 months |
NPS List Review/Direction: Nov 2002-March 2003-complete |
Begin Preparing Prospectuses: April 2003 |
Prospectuses due to OSQR: August 2003-complete |
Project Plans due to OSQR: December 2003-complete |
Termination Date: December 2004 |
Panel Convenes: January-February 2004 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP306(Schedule B)-Functional Foods & Phytochemicals; Oil and Fats Processing, Quality and Utilization Panel Review |
Reviews Status: Revisions and certifications in progress. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 35 |
Planned Duration: 60 months |
NPS List Review/Direction: Nov 2002-March 2003-completed |
Begin Preparing Prospectuses: April 15, 2003 |
Prospectuses due to OSQR: August 28, 2003-complete |
Project Plans due to OSQR: January 2004-complete |
Termination Date: December 2004 |
Panel Convenes: January-March 2004 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP306(Schedule C)-Quality Assessment, Classification & Grading; Grain & Oilseed Quality; Fruits & Vegetables: Postharvest Quality & Utilization Panel Review |
Reviews Status: Revisions and certifications in progress. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 35 |
Planned Duration: 60 months |
NPS List Review/Direction: Nov 2002-March 2003-completed |
Begin Preparing Prospectuses: April 2003 |
Prospectuses due to OSQR: September 2003-complete |
Project Plans due to OSQR: February 2004-complete |
Termination Date: December 2004 |
Panel Convenes: March-April 2004 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP306-Quality & Utilization...Ad Hoc Review-Fall 2004 |
Reviews Status: Reviewer selection in progress. |
Program Assistant: Chris |
Estimated Number of Projects in the Review: 2 |
Planned Duration: 52 months |
NPS List Review/Direction: October 2003-February 2004 |
Begin Preparing Prospectuses: February 2004 |
Prospectuses due to OSQR: April 2004-complete |
Project Plans due to OSQR: September 2004 |
Termination Date: July 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP306-Quality & Utilization...Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Quality and Utilization of Agricultural Products National Program must be considered for an updated peer review. New projects established prior to December 2005 will receive an ad hoc peer review. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 105 |
Planned Duration: 60 months |
NPS List Review/Direction: December 2007-April 2008 |
Begin Preparing Prospectuses: April 2008 |
Prospectuses due to OSQR: June 2008 |
Project Plans due to OSQR: October 2008 |
Termination Date: November 2009 |
Panel Convenes: December 2008-February 2009 |
|
Ad Hoc Cut-Off Date: December 31, 2005. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP306-Quality & Utilization
Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 47 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: November 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP306-Quality & Utilization
Ad Hoc Review-September 2005 |
Reviews Status: Preliminary planning. Prospectuses due April 22, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 3 |
Planned Duration: 41 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP307-Bioenergy and Energy Alternatives Ad Hoc Review-September 2005 |
Reviews Status: Preliminary planning. Prospectus due April 22, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 45 months |
NPS List Review/Direction: October 2004-February 2005 |
Begin Preparing Prospectuses: February 2005 |
Prospectuses due to OSQR: April 2005 |
Project Plans due to OSQR: September 2005 |
Termination Date: July 2006 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP307-Bioenergy and Energy Alternatives Panel Review |
Reviews Status: Revisions and certifications in progress. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 11 |
Planned Duration: 60 months |
NPS List Review/Direction: May 2003-complete |
Begin Preparing Prospectuses: September 2003 |
Prospectuses due to OSQR: November 2003-complete |
Project Plans due to OSQR: April 2004 |
Termination Date: December 2004 |
Panel Convenes: May-June 2004 |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP307-Bioenergy and Energy Alternatives Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Bioenergy and Energy Alternatives National Program must be considered for an updated peer review. New projects established prior to June 2006 will receive an ad hoc peer review. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 15 |
Planned Duration: 60 months |
NPS List Review/Direction: June-October 2008 |
Begin Preparing Prospectuses: October 2008 |
Prospectuses due to OSQR: December 2008 |
Project Plans due to OSQR: April 2009 |
Termination Date: March 2010 |
Panel Convenes: May-June 2009 |
|
Ad Hoc Cut-Off Date: June 30, 2006. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
Review Session Title: NP308-Methyl Bromide Alternatives Ad Hoc Review-February 2005 |
Reviews Status: Project plan due February 4, 2005. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 1 |
Planned Duration: 28 months |
NPS List Review/Direction: March-July 2004 |
Begin Preparing Prospectuses: July 2004 |
Prospectuses due to OSQR: September 2004-complete |
Project Plans due to OSQR: February 2005 |
Termination Date: December 2005 |
Panel Convenes: N/A |
|
Ad Hoc Cut-Off Date: N/A |
|
Review Session Title: NP308-Methyl Bromide Panel Review |
Reviews Status: Long-term planning in progress. Existing ARS projects entering or modified under the Methyl Bromide National Program must be considered for an updated peer review. No new ad hoc reviews are being scheduled in this program. |
Program Assistant: Florence & Linda |
Estimated Number of Projects in the Review: 16 |
Planned Duration: 60 months |
NPS List Review/Direction: May 2006 |
Begin Preparing Prospectuses: November 2006 |
Prospectuses due to OSQR: February 2007 |
Project Plans due to OSQR: June 2007 |
Termination Date: April 2008 |
Panel Convenes: August 2007 |
|
Ad Hoc Cut-Off Date: May 31, 2004. Projects established prior will receive an ad hoc review, projects established after that date will be put into the next panel review session. |
|
|
Last Updated: October 19, 2004 |