Office of Information and Regulatory Affairs (OIRA)
Reviews Completed Last 30 Days
November 6, 2004
Note: "**" denotes recent completion
Choose a starting point in this report from the following:
(Only agencies with information relevant to this report appear in the list)
Department of Agriculture
Reviews Completed
USDA-NASS |
|
OMB NO.: |
0535-0140
|
List Sampling Frame Survey
RECEIVED: 10/17/2003
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
325,000
|
22,500
|
|
Requested: |
325,000
|
22,500
|
|
Approved: |
325,000
|
22,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-NASS |
|
OMB NO.: |
0535-0245
|
Conservation Effects Assessment Project
RECEIVED: 06/30/2004
COMPLETED: 10/22/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
16,448
|
7,846
|
|
Requested: |
21,514
|
10,253
|
|
Approved: |
21,514
|
10,253
|
|
Program Change: |
|
2,407
|
|
Adjustment: |
|
0
|
|
USDA-FAS |
|
OMB NO.: |
0551-0007
|
Export Sales of U.S. Agricultural Commodities
RECEIVED: 07/16/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50,260
|
24,523
|
|
Requested: |
57,760
|
31,190
|
|
Approved: |
57,760
|
31,190
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
6,667
|
|
USDA-FSA |
|
OMB NO.: |
0560-0243
|
Collection of Market Prices
RECEIVED: 06/08/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
7,200
|
1,800
|
|
Approved: |
7,200
|
1,800
|
|
Program Change: |
|
1,800
|
|
Adjustment: |
|
0
|
|
USDA-FSA |
|
OMB NO.: |
0560-0246
|
Ewe Lamb Replacement and Retention Payment Program
RECEIVED: 08/26/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
60,000
|
27,540
|
|
Approved: |
60,000
|
27,540
|
|
Program Change: |
|
27,540
|
|
Adjustment: |
|
0
|
|
USDA-RUS |
|
OMB NO.: |
0572-0109
|
7 CFR 1777, Section 306C WWD Loans and Grants
RECEIVED: 09/17/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
9
|
|
Requested: |
1
|
9
|
|
Approved: |
1
|
9
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-RHS |
|
OMB NO.: |
0575-0114
|
Rural Housing Demonstration Program - Section 502
RECEIVED: 09/01/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
25
|
2,000
|
|
Requested: |
25
|
2,000
|
|
Approved: |
25
|
2,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-RHS |
|
OMB NO.: |
0575-0088
|
Form RD 1940-59, Settlement Statement
RECEIVED: 09/17/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
57,800
|
28,900
|
|
Requested: |
14,909
|
7,455
|
|
Approved: |
14,909
|
7,455
|
|
Program Change: |
|
-21,445
|
|
Adjustment: |
|
0
|
|
USDA-APHIS |
|
OMB NO.: |
0579-0166
|
District of Columbia Plant Health Certificate
RECEIVED: 01/29/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
40
|
|
Requested: |
200
|
40
|
|
Approved: |
200
|
40
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-APHIS |
|
OMB NO.: |
0579-0168
|
Citrus Canker; Payment for Recovery of Lost Production Income
RECEIVED: 01/29/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
65
|
10
|
|
Requested: |
20
|
3
|
|
Approved: |
20
|
3
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-7
|
|
USDA-APHIS |
|
OMB NO.: |
0579-0055
|
Request for credit account approval for reimbursable services
RECEIVED: 08/24/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
360
|
90
|
|
Requested: |
256
|
64
|
|
Approved: |
256
|
64
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-26
|
|
USDA-AMS |
|
OMB NO.: |
0581-0178
|
Vegetable and Specialty Crops
RECEIVED: 07/23/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
38,583
|
10,514
|
|
Requested: |
169,101
|
15,107
|
|
Approved: |
169,101
|
15,107
|
|
Program Change: |
|
311
|
|
Adjustment: |
|
4,282
|
|
USDA-AMS |
|
OMB NO.: |
0581-0182
|
Customer Service Survey for USDA - Donated Food Products
RECEIVED: 09/01/2004
COMPLETED: 10/24/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
8,400
|
700
|
|
Requested: |
8,400
|
700
|
|
Approved: |
8,400
|
700
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-AMS |
|
OMB NO.: |
0581-0225
|
Nectarines and Peaches Grown in CA (7 CFR Part 916 and 917)
Marketing Orders
RECEIVED: 09/13/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
500
|
250
|
|
Approved: |
500
|
250
|
|
Program Change: |
|
250
|
|
Adjustment: |
|
0
|
|
USDA-FSIS |
|
OMB NO.: |
0583-0130
|
Advanced Meat Recovery Systems
RECEIVED: 05/13/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50,456
|
25,256
|
|
Requested: |
50,456
|
25,256
|
|
Approved: |
50,456
|
25,256
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
USDA-FSIS |
|
OMB NO.: |
0583-0129
|
Specified Risk Materials
RECEIVED: 05/21/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,752,500
|
807,500
|
|
Requested: |
752,500
|
107,500
|
|
Approved: |
752,500
|
107,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-700,000
|
|
USDA-FNS |
|
OMB NO.: |
0584-0008
|
Food Stamp Program Application, Forms FNS-252; FNS-252-C;
FNS-252-2
RECEIVED: 08/26/2004
COMPLETED: 10/28/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
34,888
|
7,309
|
|
Requested: |
48,171
|
4,653
|
|
Approved: |
48,171
|
4,653
|
|
Program Change: |
|
-2,656
|
|
Adjustment: |
|
0
|
|
USDA-FS |
|
OMB NO.: |
0596-XXXX
|
Forest Stewardship Program Participant Survey
RECEIVED: 09/28/2004
COMPLETED: 10/15/2004 Improperly submitted
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
1,200
|
400
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Department of Commerce
Reviews Completed
DOC-ITA |
|
OMB NO.: |
0625-XXXX
|
Advocacy Quality Assurance Survey
RECEIVED: 06/14/2004
COMPLETED: 10/29/2004 Disapproval
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
228
|
38
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOC-ITA |
|
OMB NO.: |
0625-0037
|
Request for Duty-Free Entry of Scientific Instruments or
Apparatus
RECEIVED: 07/27/2004
COMPLETED: 10/21/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50
|
100
|
|
Requested: |
60
|
120
|
|
Approved: |
60
|
120
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
20
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0498
|
Southwest Region Logbook Family of Forms
RECEIVED: 07/19/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
5,096
|
3,034
|
2
|
Approved: |
5,096
|
3,034
|
2
|
Program Change: |
|
3,034
|
2
|
Adjustment: |
|
0
|
0
|
DOC-NOAA |
|
OMB NO.: |
0648-0007
|
Coast Pilot Report
RECEIVED: 07/20/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
100
|
50
|
|
Requested: |
100
|
50
|
|
Approved: |
100
|
50
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0441
|
Vessel Monitoring System Requirements in the Western Pacific
Pelagic Longline Fishery
RECEIVED: 07/21/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,445,568
|
743
|
|
Requested: |
1,436,640
|
399
|
|
Approved: |
1,436,640
|
399
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-344
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0075
|
Foreign Fishing Reporting Requirements
RECEIVED: 07/23/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,350
|
422
|
|
Requested: |
1,010
|
177
|
|
Approved: |
1,010
|
177
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-245
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0204
|
Southwest Region Permit Family of Forms
RECEIVED: 07/27/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
427
|
248
|
0
|
Requested: |
1,309
|
530
|
1
|
Approved: |
1,309
|
530
|
1
|
Program Change: |
|
282
|
1
|
Adjustment: |
|
0
|
0
|
DOC-NOAA |
|
OMB NO.: |
0648-0218
|
South Pacific Tuna Act
RECEIVED: 07/29/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
672
|
430
|
73
|
Requested: |
308
|
242
|
36
|
Approved: |
308
|
242
|
36
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-188
|
-37
|
DOC-NOAA |
|
OMB NO.: |
0648-0157
|
NOAA Space-Based Data Collection System (DCS) Agreements
RECEIVED: 08/04/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
390
|
440
|
|
Requested: |
390
|
440
|
|
Approved: |
390
|
440
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0013
|
Southeast Region Dealer and Interview Family of Forms
RECEIVED: 08/06/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
21,002
|
3,569
|
|
Requested: |
11,464
|
2,087
|
|
Approved: |
11,464
|
2,087
|
|
Program Change: |
|
-1,482
|
|
Adjustment: |
|
0
|
|
DOC-NOAA |
|
OMB NO.: |
0648-0500
|
An Observer Program for At-Sea Processing Vessels in the Pacific
Coast Groundfish Fishery
RECEIVED: 08/09/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
222
|
51
|
1
|
Approved: |
222
|
51
|
1
|
Program Change: |
|
51
|
1
|
Adjustment: |
|
0
|
0
|
DOC-NOAA |
|
OMB NO.: |
0648-0212
|
Northeast Region Logbook Family of Forms
RECEIVED: 08/19/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
80,190
|
10,882
|
35
|
Requested: |
80,560
|
10,907
|
35
|
Approved: |
80,560
|
10,907
|
35
|
Program Change: |
|
25
|
0
|
Adjustment: |
|
0
|
0
|
DOC-PTO |
|
OMB NO.: |
0651-0012
|
Admittance to Practice and Roster of Registered Patent Attorneys
and Agents admitted to practice before the United States Patient
and Trademark Office (USPTO)
RECEIVED: 07/12/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
24,042
|
6,078
|
2,491
|
Requested: |
30,035
|
48,227
|
2,189
|
Approved: |
30,035
|
48,227
|
2,189
|
Program Change: |
|
42,149
|
-302
|
Adjustment: |
|
0
|
0
|
DOC-PTO |
|
OMB NO.: |
0651-0031
|
Patent Processing (Updating)
RECEIVED: 07/15/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,215,789
|
2,724,957
|
118,916
|
Requested: |
2,281,439
|
2,731,841
|
118,937
|
Approved: |
2,281,439
|
2,731,841
|
118,937
|
Program Change: |
|
6,884
|
21
|
Adjustment: |
|
0
|
0
|
DOC-PTO |
|
OMB NO.: |
0651-0052
|
United States Patent Applicant Survey
RECEIVED: 07/29/2004
COMPLETED: 10/13/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
445
|
187
|
|
Approved: |
445
|
187
|
|
Program Change: |
|
187
|
|
Adjustment: |
|
0
|
|
DOC-PTO |
|
OMB NO.: |
0651-0020
|
Patent Term Extension
RECEIVED: 08/06/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
26,859
|
30,905
|
5,977
|
Requested: |
26,859
|
30,905
|
5,987
|
Approved: |
26,859
|
30,905
|
5,987
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
10
|
DOC-NIST |
|
OMB NO.: |
0693-0036
|
Bees Please
RECEIVED: 08/18/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
30
|
1,875
|
6
|
Requested: |
30
|
1,875
|
0
|
Approved: |
30
|
1,875
|
0
|
Program Change: |
|
0
|
-6
|
Adjustment: |
|
0
|
0
|
DOC-BIS |
|
OMB NO.: |
0694-0092
|
Procedures For Acceptance Or Rejection of Rated Order
RECEIVED: 06/24/2004
COMPLETED: 10/27/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
700,000
|
21,963
|
|
Requested: |
700,000
|
21,963
|
|
Approved: |
700,000
|
21,963
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOC-BIS |
|
OMB NO.: |
0694-0009
|
Approval of Triangular Transactions Involving Commodities by a
U. S. Import Certificate
RECEIVED: 08/09/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
1
|
|
Requested: |
1
|
1
|
|
Approved: |
1
|
1
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOC-BIS |
|
OMB NO.: |
0694-0096
|
Five Year Records Retention Period
RECEIVED: 08/10/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
201,177
|
249
|
|
Requested: |
291,437
|
253
|
|
Approved: |
291,437
|
253
|
|
Program Change: |
|
4
|
|
Adjustment: |
|
0
|
|
Department of Defense
Reviews Completed
DOD-DODDEP |
|
OMB NO.: |
0704-0100
|
Application for Discharge of Member or Survivor of Group
Certified to Have Performed Active Duty with the Armed Forces of
the United States
RECEIVED: 08/24/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,000
|
1,500
|
2
|
Requested: |
3,000
|
1,500
|
0
|
Approved: |
3,000
|
1,500
|
0
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
-2
|
DOD-DODDEP |
|
OMB NO.: |
0704-0253
|
Subcontracting Policies and Procedures -- DOD FAR Supplement
Part 244
RECEIVED: 08/24/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
90
|
1,440
|
|
Requested: |
90
|
1,440
|
|
Approved: |
90
|
1,440
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOD-DODDEP |
|
OMB NO.: |
0704-0272
|
Defense Federal Acqisition Regulation Supplement (DFARS) Subpart
223, Environment, Conservation and Occupational Safety; and
related clauses at DFARS Part 252
RECEIVED: 08/24/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
14,726
|
9,997
|
|
Requested: |
13,507
|
9,448
|
|
Approved: |
13,507
|
9,448
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-549
|
|
DOD-DODDEP |
|
OMB NO.: |
0704-0225
|
Defense Federal Acquisition Regulation Suppement Part 204.,
Administrative Matters, and related clauses at 252.204
RECEIVED: 09/01/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
22,602
|
13,758
|
|
Requested: |
32,240
|
19,624
|
|
Approved: |
32,240
|
19,624
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
5,866
|
|
Department of Education
Reviews Completed
Gateway to Educational Materials (GEM) Resource Annotation (JS)
RECEIVED: 09/24/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
5,000
|
600
|
|
Approved: |
5,000
|
600
|
|
Program Change: |
|
600
|
|
Adjustment: |
|
0
|
|
ED-OESE |
|
OMB NO.: |
1810-0667
|
Improving Literacy Through School Libraries Program Final Grant
Report (KA)
RECEIVED: 08/31/2004
COMPLETED: 11/03/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
100
|
500
|
|
Approved: |
100
|
500
|
|
Program Change: |
|
500
|
|
Adjustment: |
|
0
|
|
ED-OESE |
|
OMB NO.: |
1810-0668
|
21st Century Community Learning Centers Annual Performance
Report (KA)
RECEIVED: 09/17/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,125
|
9,000
|
|
Requested: |
1,400
|
36,400
|
|
Approved: |
1,400
|
36,400
|
|
Program Change: |
|
27,400
|
|
Adjustment: |
|
0
|
|
ED-OSERS |
|
OMB NO.: |
1820-0660
|
Written Application for the Independent Living Services for
Older Individuals Who are Blind Formula Grant (SC)
RECEIVED: 08/25/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
56
|
9
|
|
Approved: |
56
|
9
|
|
Program Change: |
|
9
|
|
Adjustment: |
|
0
|
|
ED-OSERS |
|
OMB NO.: |
1820-0606
|
Section 704 Annual Performance Report (Parts I and II) (SC)
RECEIVED: 10/13/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
0
|
Requested: |
319
|
11,165
|
1
|
Approved: |
319
|
11,165
|
1
|
Program Change: |
|
11,165
|
1
|
Adjustment: |
|
0
|
0
|
ED-OSERS |
|
OMB NO.: |
1820-0608
|
Independent Living Services for Older Individuals Who Are Blind
(SC)
RECEIVED: 10/13/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
55
|
440
|
|
Approved: |
55
|
440
|
|
Program Change: |
|
440
|
|
Adjustment: |
|
0
|
|
ED-OVAE |
|
OMB NO.: |
1830-0026
|
Adult Education and Family Literacy Act State Plan (PL 105-220)
(SC)
RECEIVED: 08/10/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
59
|
2,655
|
|
Requested: |
59
|
2,655
|
|
Approved: |
59
|
2,655
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-OPE |
|
OMB NO.: |
1840-0753
|
Teacher Quality Enhancement Grants Program's Scholarship
Contract and Teaching Verification Form for Title II Scholarship
Recipien ts
RECEIVED: 08/09/2004
COMPLETED: 11/01/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,850
|
3,250
|
|
Requested: |
2,850
|
3,250
|
|
Approved: |
2,850
|
3,250
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-OSFA |
|
OMB NO.: |
1845-0072
|
eZ-Audit: Electronic Submission of Financial Statements and
Compliance Audits (JS)
RECEIVED: 08/06/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5,900
|
4,251
|
0
|
Requested: |
5,900
|
5,450
|
177
|
Approved: |
5,900
|
5,450
|
177
|
Program Change: |
|
0
|
177
|
Adjustment: |
|
1,199
|
0
|
ED-OSFA |
|
OMB NO.: |
1845-0046
|
Consolidation Loan Rebate Fee Report (JS)
RECEIVED: 08/26/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
9,804
|
10,621
|
|
Requested: |
9,804
|
10,621
|
|
Approved: |
9,804
|
10,621
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-IES |
|
OMB NO.: |
1850-0797
|
Reading First Impact Study (KA)
RECEIVED: 07/27/2004
COMPLETED: 10/12/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
74,747
|
74,020
|
|
Approved: |
74,747
|
74,020
|
|
Program Change: |
|
74,020
|
|
Adjustment: |
|
0
|
|
ED-IES |
|
OMB NO.: |
1850-0789
|
American Indian Supplement to the NAEP, Full Scale Study (KI)
RECEIVED: 08/10/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,300
|
325
|
|
Requested: |
6,500
|
1,750
|
|
Approved: |
6,500
|
1,750
|
|
Program Change: |
|
1,425
|
|
Adjustment: |
|
0
|
|
ED-OII |
|
OMB NO.: |
1855-0007
|
Application for Grants under the Credit Enhancement for Charter
School Facilities Program (1890-0001) (KA)
RECEIVED: 09/28/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
30
|
2,400
|
|
Requested: |
30
|
2,400
|
|
Approved: |
30
|
2,400
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-EDSI |
|
OMB NO.: |
1860-0505
|
Sign-on Form for Educational Partnerships and Family Involvement
(KI)
RECEIVED: 08/19/2004
COMPLETED: 10/22/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
720
|
60
|
|
Requested: |
720
|
60
|
|
Approved: |
720
|
60
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-OUS |
|
OMB NO.: |
1875-0232
|
Reading First Implementation Evaluation (KI)
RECEIVED: 07/27/2004
COMPLETED: 10/14/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
8,250
|
4,125
|
|
Approved: |
8,250
|
4,125
|
|
Program Change: |
|
4,125
|
|
Adjustment: |
|
0
|
|
ED-OUS |
|
OMB NO.: |
1875-0233
|
National Educational Technology Trends Study (NETTS) (KI)
RECEIVED: 08/24/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
639
|
595
|
|
Approved: |
639
|
595
|
|
Program Change: |
|
595
|
|
Adjustment: |
|
0
|
|
ED-OCFO |
|
OMB NO.: |
1890-0007
|
GEPA Section 427 Guidance for All Grant Applications (SC)
RECEIVED: 08/31/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
21,200
|
31,800
|
|
Requested: |
21,200
|
31,800
|
|
Approved: |
21,200
|
31,800
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
ED-OCFO |
|
OMB NO.: |
1890-0004
|
U.S. Department of Education Budget Information -
Non-Construction Programs Form, Grant Performance Report Form
and EDGAR Administrative Requirements (SC)
RECEIVED: 09/10/2004
COMPLETED: 10/08/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
37,285
|
607,564
|
|
Requested: |
37,285
|
807,564
|
|
Approved: |
37,285
|
807,564
|
|
Program Change: |
|
200,000
|
|
Adjustment: |
|
0
|
|
Department of Health and Human Services
Reviews Completed
HHS-FDA |
|
OMB NO.: |
0910-0553
|
Use of Symbols on Labels and in Labeling of In Vitro Diagnostic
Devices Intended for Professional Use
RECEIVED: 08/05/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
1,742
|
34,840
|
|
Approved: |
1,742
|
34,840
|
|
Program Change: |
|
34,840
|
|
Adjustment: |
|
0
|
|
HHS-HSA |
|
OMB NO.: |
0915-0140
|
The Nursing Education Loan Repayment Program
RECEIVED: 06/23/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,050
|
1,050
|
3
|
Requested: |
8,000
|
48,000
|
0
|
Approved: |
9,200
|
54,000
|
0
|
Program Change: |
|
52,950
|
0
|
Adjustment: |
|
0
|
-3
|
HHS-CDC |
|
OMB NO.: |
0920-0274
|
CDC Model Performance Evaluation Program (MPEP) for Retroviral
and AIDS-Related Testing
RECEIVED: 08/03/2004
COMPLETED: 10/14/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
4,548
|
852
|
|
Requested: |
2,835
|
1,057
|
|
Approved: |
2,835
|
1,057
|
|
Program Change: |
|
205
|
|
Adjustment: |
|
0
|
|
HHS-CDC |
|
OMB NO.: |
0920-XXXX
|
Severe Acute Respiratory Syndrome (SARS) Laboratory Safety Survey
RECEIVED: 09/30/2004
COMPLETED: 10/12/2004 Withdrawn
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
120
|
20
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-NIH |
|
OMB NO.: |
0925-0532
|
NICHD Research Partner Satisfaction Surveys
RECEIVED: 04/13/2004
COMPLETED: 10/28/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
13,625
|
1,872
|
|
Approved: |
13,625
|
1,872
|
|
Program Change: |
|
1,872
|
|
Adjustment: |
|
0
|
|
HHS-NIH |
|
OMB NO.: |
0925-0493
|
The Multi-Ethnic Study of Atherosclerosis (MESA)
RECEIVED: 08/27/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
555
|
42
|
|
Requested: |
555
|
42
|
|
Approved: |
555
|
42
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-SAMHSA |
|
OMB NO.: |
0930-0261
|
National Surey on Drug Use and Health_ Methodological Field Tests
RECEIVED: 05/28/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
7,354
|
4,886
|
|
Approved: |
7,354
|
4,886
|
|
Program Change: |
|
4,886
|
|
Adjustment: |
|
0
|
|
HHS-SAMHSA |
|
OMB NO.: |
0930-0110
|
2005 National Survey on Drug Use and Health
RECEIVED: 07/14/2004
COMPLETED: 10/28/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
182,250
|
83,677
|
|
Requested: |
249,750
|
83,673
|
|
Approved: |
249,750
|
83,673
|
|
Program Change: |
|
-4
|
|
Adjustment: |
|
0
|
|
HHS-SAMHSA |
|
OMB NO.: |
0930-0258
|
Assessment of the Reach Out Now! Teach-In Initiative
RECEIVED: 08/20/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
75
|
13
|
|
Requested: |
200
|
34
|
|
Approved: |
200
|
34
|
|
Program Change: |
|
21
|
|
Adjustment: |
|
0
|
|
HHS-AHRQ |
|
OMB NO.: |
0935-0123
|
AHRQ-HRSA CBRNE Preparedness Questionnaire for Healthcare
Facilities
RECEIVED: 10/14/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
4,906
|
6,000
|
|
Approved: |
4,906
|
6,000
|
|
Program Change: |
|
6,000
|
|
Adjustment: |
|
0
|
|
HHS-CMS |
|
OMB NO.: |
0938-0714
|
Procedures for advisory opinions concerning physician referrals
and supporting regulations in 42 CFR Sections 411.370 through
411.389
RECEIVED: 07/23/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
2,000
|
0
|
Requested: |
200
|
2,000
|
0
|
Approved: |
200
|
2,000
|
400
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
400
|
HHS-CMS |
|
OMB NO.: |
0938-0717
|
Information Collection Requirements Referenced in 42 CFR Sec.
424.57; Additional DMEPOS Supplier Standards
RECEIVED: 07/23/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
35,000
|
280,000
|
|
Requested: |
35,000
|
280,000
|
|
Approved: |
35,000
|
280,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-CMS |
|
OMB NO.: |
0938-0846
|
Physicians' Referrals to Health Care Entitles With Which They
Have Financial Relationships and Supporting Regulations in 42
CFR, Sections 411.352 through 411.361
RECEIVED: 07/23/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
1
|
|
Requested: |
62,824
|
1,561,633
|
|
Approved: |
62,824
|
422,008
|
|
Program Change: |
|
422,007
|
|
Adjustment: |
|
0
|
|
HHS-CMS |
|
OMB NO.: |
0938-0599
|
CLIA Budget Workload Reports and Supporting Regulations
Contained in 42 CFR 493.1-.2001
RECEIVED: 08/20/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50
|
4,500
|
|
Requested: |
50
|
4,500
|
|
Approved: |
50
|
4,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-CMS |
|
OMB NO.: |
0938-XXXX
|
Expedited Review Notices and Supporting Regulations Contained in
42 CFR Sec. 405.1200 and 405.1202
RECEIVED: 08/27/2004
** COMPLETED: 11/05/2004 Withdrawn
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
4,292,400
|
99,400
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-CMS |
|
OMB NO.: |
0938-0749
|
On-Site Inspection for Durable Medical Equipment (DME) Supplier
Location and Supporting Regulations in 42 CFR, Section 424.57
RECEIVED: 09/10/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
20,000
|
10,000
|
|
Requested: |
20,000
|
10,000
|
|
Approved: |
20,000
|
10,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HHS-ACF |
|
OMB NO.: |
0970-0196
|
Financial Institution Data Match
RECEIVED: 08/16/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
17,173
|
8,586
|
157
|
Requested: |
18,337
|
9,168
|
17
|
Approved: |
18,337
|
9,168
|
17
|
Program Change: |
|
0
|
-140
|
Adjustment: |
|
582
|
0
|
HHS-ACF |
|
OMB NO.: |
0970-XXXX
|
Title IV-E Foster Care Eligibility Re-determinations and
Re-determinations of Candidacy for Foster Care
RECEIVED: 08/27/2004
COMPLETED: 11/03/2004 Comment filed
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
553,870
|
276,935
|
2,769
|
Approved: |
0
|
0
|
0
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
HHS-HDSO |
|
OMB NO.: |
0980-0140
|
Case Plan Requirement, Title IV-E of the Social Security Act
RECEIVED: 07/23/2004
COMPLETED: 10/22/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
714,056
|
1,872,392
|
0
|
Requested: |
701,461
|
1,823,900
|
27,358,500
|
Approved: |
701,461
|
1,823,900
|
0
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-48,492
|
0
|
Department of Homeland Security
Reviews Completed
DHS-BCIS |
|
OMB NO.: |
1615-0066
|
The Student and Exchange Visitor Information System (SEVIS)
RECEIVED: 01/27/2004
COMPLETED: 10/12/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5
|
1,040,850
|
|
Requested: |
5
|
1,040,850
|
|
Approved: |
5
|
999,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-41,850
|
|
DHS-BCIS |
|
OMB NO.: |
1615-0013
|
Application for Travel Document
RECEIVED: 06/29/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
453,318
|
407,986
|
43,065
|
Requested: |
164,103
|
147,692
|
28,553
|
Approved: |
164,103
|
147,692
|
28,553
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-260,294
|
-14,512
|
DHS-BCIS |
|
OMB NO.: |
1615-0003
|
Application to Extend/Change Nonimmigrant Status
RECEIVED: 07/30/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
683,210
|
512,407
|
81,985
|
Requested: |
261,867
|
196,400
|
|
Approved: |
261,867
|
196,400
|
0
|
Program Change: |
|
0
|
-53,028
|
Adjustment: |
|
-316,007
|
-28,957
|
DHS-BCIS |
|
OMB NO.: |
1615-0076
|
Sponsor's Notice of Change of Address
RECEIVED: 08/25/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
100,000
|
23,300
|
|
Requested: |
100,000
|
23,300
|
|
Approved: |
100,000
|
23,300
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DHS-BCIS |
|
OMB NO.: |
1615-0089
|
Request for Fee Waiver Denial Letter
RECEIVED: 08/25/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
16,000
|
20,000
|
|
Requested: |
16,000
|
20,000
|
|
Approved: |
16,000
|
20,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DHS-BCBP |
|
OMB NO.: |
1651-0039
|
Declaration by the Person Who Performed the Processing of Goods
Abroad
RECEIVED: 07/21/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
7,500
|
1,880
|
|
Requested: |
7,500
|
1,880
|
|
Approved: |
7,500
|
1,880
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DHS-BCBP |
|
OMB NO.: |
1651-0050
|
Importation Bond Structure
RECEIVED: 07/21/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
590,250
|
147,596
|
|
Requested: |
590,250
|
147,596
|
|
Approved: |
590,250
|
147,596
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DHS-DHSTSA |
|
OMB NO.: |
1652-0025
|
Secure Flight Program Test Phase
RECEIVED: 09/22/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
77
|
10,857
|
810
|
Approved: |
77
|
10,857
|
810
|
Program Change: |
|
10,857
|
810
|
Adjustment: |
|
0
|
0
|
DHS-DHSEPR |
|
OMB NO.: |
1660-0048
|
Supplemental Property Acquisition and Elevation Assistance
RECEIVED: 05/28/2004
COMPLETED: 10/12/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
30,445
|
60,182
|
1,021
|
Requested: |
1,052
|
5,470
|
0
|
Approved: |
224
|
1,165
|
0
|
Program Change: |
|
-47,349
|
0
|
Adjustment: |
|
-11,668
|
-1,021
|
Department of Housing and Urban Development
Reviews Completed
HUD-OH |
|
OMB NO.: |
2502-0082
|
Recertification of Family Income and Composition
RECEIVED: 08/31/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
100,073
|
97,175
|
|
Requested: |
12,000
|
8,520
|
|
Approved: |
12,000
|
8,520
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-88,655
|
|
HUD-OH |
|
OMB NO.: |
2502-0306
|
Single Family Housing Property Disposition and Acquisition
(Conveyance) of Mortgaged Properties
RECEIVED: 08/31/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,127,580
|
563,765
|
|
Requested: |
1,102,580
|
551,265
|
|
Approved: |
1,102,580
|
551,265
|
|
Program Change: |
|
-12,500
|
|
Adjustment: |
|
0
|
|
HUD-OH |
|
OMB NO.: |
2502-0527
|
Rehabilitation Mortgage Insurance Underwriting Program Section(K)
RECEIVED: 09/29/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
5,225
|
231,000
|
|
Approved: |
5,225
|
231,000
|
|
Program Change: |
|
231,000
|
|
Adjustment: |
|
0
|
|
HUD-CPD |
|
OMB NO.: |
2506-0151
|
24 CFR Part 55, Floodplain Management
RECEIVED: 08/25/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
300
|
2,700
|
|
Requested: |
300
|
2,700
|
|
Approved: |
300
|
2,700
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
HUD-CPD |
|
OMB NO.: |
2506-0153
|
Brownfields Economic Development Initiative (BEDI) Grant
Application
RECEIVED: 08/31/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
100
|
8,160
|
|
Requested: |
50
|
2,000
|
|
Approved: |
50
|
2,000
|
|
Program Change: |
|
-6,160
|
|
Adjustment: |
|
0
|
|
HUD-PD&R; |
|
OMB NO.: |
2528-0013
|
Survey of Market Absorption of New Apartment Buildings
RECEIVED: 09/01/2004
COMPLETED: 11/01/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
48,000
|
4,000
|
|
Requested: |
25,200
|
7,560
|
|
Approved: |
25,200
|
7,560
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
3,560
|
|
HUD-PIH |
|
OMB NO.: |
2577-0237
|
Public Housing Assessment System (PHAS) Memorandum of Agreement
(MOA), MOA Monthly Report, and Improvement Plan (IP)
RECEIVED: 08/31/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
939
|
34,026
|
|
Requested: |
375
|
30,650
|
|
Approved: |
375
|
30,650
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-3,376
|
|
HUD-PIH |
|
OMB NO.: |
2577-0072
|
Computation of Payment in Lieu of Taxes
RECEIVED: 09/03/2004
COMPLETED: 11/01/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
3,135
|
1,254
|
|
Approved: |
3,135
|
1,254
|
|
Program Change: |
|
1,254
|
|
Adjustment: |
|
0
|
|
Department of the Interior
Reviews Completed
DOI-MMS |
|
OMB NO.: |
1010-0110
|
Training and Outreach Evaluation Form (Form MMS-4420 A-E)
RECEIVED: 08/24/2004
COMPLETED: 10/07/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,260
|
126
|
|
Requested: |
950
|
95
|
|
Approved: |
1,600
|
160
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
34
|
|
DOI-MMS |
|
OMB NO.: |
1010-0106
|
30 CFR 253, Oil Spill Financial Responsibility for Offshore
Facilities
RECEIVED: 09/16/2004
COMPLETED: 10/15/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,834
|
19,504
|
|
Requested: |
1,826
|
19,299
|
|
Approved: |
1,826
|
19,299
|
|
Program Change: |
|
|
|
Adjustment: |
|
-205
|
|
DOI-MMS |
|
OMB NO.: |
1010-0114
|
30 CFR 250, Subpart A, General
RECEIVED: 09/16/2004
COMPLETED: 10/21/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
18,517
|
22,727
|
2
|
Requested: |
15,478
|
22,288
|
2
|
Approved: |
15,478
|
22,288
|
2
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-439
|
0
|
DOI-MMS |
|
OMB NO.: |
1010-0159
|
Notice to Lessees and Operators: Damage Caused by Hurricane Ivan
RECEIVED: 10/12/2004
COMPLETED: 10/13/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
380
|
36,960
|
|
Approved: |
380
|
36,960
|
|
Program Change: |
|
36,960
|
|
Adjustment: |
|
0
|
|
DOI-FWS |
|
OMB NO.: |
1018-0070
|
Incidental Take of Marine Mammals During Specified Activities
Applications, 50 CFR 18.27 and 50 CFR 18, Subpart J
RECEIVED: 09/21/2004
COMPLETED: 10/21/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
49
|
1,047
|
|
Requested: |
141
|
2,027
|
|
Approved: |
141
|
2,027
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
980
|
|
DOI-GS |
|
OMB NO.: |
1028-0081
|
Public Perceptions of Bats in Fort Collins, Colorado.
RECEIVED: 08/11/2004
COMPLETED: 10/21/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
950
|
317
|
|
Approved: |
950
|
317
|
|
Program Change: |
|
317
|
|
Adjustment: |
|
0
|
|
DOI-GS |
|
OMB NO.: |
1028-0056
|
North American Reporting Center for Amphibian Malformations
RECEIVED: 08/13/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
450
|
150
|
|
Requested: |
450
|
150
|
|
Approved: |
450
|
150
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOI-OSMRE |
|
OMB NO.: |
1029-0124
|
Revegetation: Standards for Success, 30 CFR 816.116 and 817.116.
RECEIVED: 09/13/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
882
|
70,600
|
44
|
Requested: |
882
|
70,600
|
44
|
Approved: |
882
|
70,600
|
44
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Department of Justice
Reviews Completed
DOJ-FBI |
|
OMB NO.: |
1110-0042
|
Criminal Justice Information Services: Custom Satisfaction
Surveys
RECEIVED: 07/13/2004
COMPLETED: 10/18/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
2,485
|
177
|
|
Approved: |
2,485
|
177
|
|
Program Change: |
|
177
|
|
Adjustment: |
|
0
|
|
DOJ-FBI |
|
OMB NO.: |
1110-0033
|
National Sex Offender Registry (NSOR)
RECEIVED: 09/30/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
250,000
|
8,333
|
|
Requested: |
50,000
|
1
|
|
Approved: |
50,000
|
1
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-8,332
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0284
|
Semi-annual Progress Report for the Grants to Support Tribal
Domestic Violence and Sexual Assault Coalitions
RECEIVED: 08/17/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
28
|
28
|
|
Approved: |
28
|
28
|
|
Program Change: |
|
28
|
|
Adjustment: |
|
0
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0184
|
School Crime Supplement to the National Victimization Survey
RECEIVED: 08/19/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
12,200
|
2,042
|
|
Requested: |
12,200
|
2,038
|
|
Approved: |
12,200
|
2,038
|
|
Program Change: |
|
-4
|
|
Adjustment: |
|
0
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0286
|
Semi-annual Progress Report for Education and Technical
Assistance Grants to End Violence Against Women with Disabilities
RECEIVED: 08/20/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
36
|
36
|
|
Approved: |
36
|
36
|
|
Program Change: |
|
36
|
|
Adjustment: |
|
0
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0287
|
Semi-annual Progress Report for the Rural Domestic Violence and
Child Victimization Enforcement Grant Program
RECEIVED: 08/20/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
330
|
330
|
|
Approved: |
330
|
330
|
|
Program Change: |
|
330
|
|
Adjustment: |
|
0
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0288
|
Semi-annual Progress Report for the STOP Violence Against Indian
Women Discretionary Grant Program
RECEIVED: 08/20/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
330
|
330
|
|
Approved: |
330
|
330
|
|
Program Change: |
|
330
|
|
Adjustment: |
|
0
|
|
DOJ-OJP |
|
OMB NO.: |
1121-0289
|
Used Body Armor Wear and Care Questionnaire
RECEIVED: 09/10/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
500
|
125
|
|
Approved: |
500
|
125
|
|
Program Change: |
|
125
|
|
Adjustment: |
|
0
|
|
DOJ-ATF |
|
OMB NO.: |
1140-0091
|
Customer Satisfaction Surveys
RECEIVED: 08/04/2004
COMPLETED: 10/28/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
500
|
125
|
|
Approved: |
500
|
125
|
|
Program Change: |
|
125
|
|
Adjustment: |
|
0
|
|
DOJ-ATF |
|
OMB NO.: |
1140-0015
|
Application for Tax Exempt Transfer and Registration of Firearm
RECEIVED: 08/25/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
94,974
|
379,896
|
0
|
Requested: |
94,974
|
379,896
|
17,570
|
Approved: |
94,974
|
379,896
|
17,570
|
Program Change: |
|
0
|
17,570
|
Adjustment: |
|
0
|
0
|
DOJ-ATF |
|
OMB NO.: |
1140-0027
|
User - Limited Permit (Explosives))
RECEIVED: 08/25/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,092
|
22
|
|
Requested: |
1,092
|
218
|
|
Approved: |
1,092
|
218
|
|
Program Change: |
|
196
|
|
Adjustment: |
|
0
|
|
DOJ-ATF |
|
OMB NO.: |
1140-0089
|
Open Letter to States With Permits that appear to qualify as
Alternatives to NICS Checks
RECEIVED: 08/25/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
21
|
21
|
|
Requested: |
21
|
21
|
|
Approved: |
21
|
21
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOJ-ATF |
|
OMB NO.: |
1140-0018
|
Application for Federal Firearms License
RECEIVED: 08/30/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10,000
|
12,500
|
0
|
Requested: |
13,000
|
16,250
|
2
|
Approved: |
13,000
|
16,250
|
2
|
Program Change: |
|
3,750
|
2
|
Adjustment: |
|
0
|
0
|
DOJ-ATF |
|
OMB NO.: |
1140-0019
|
Federal Firearms License (FFL) RENEWAL Application
RECEIVED: 08/30/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
35,000
|
14,700
|
0
|
Requested: |
35,000
|
14,700
|
12
|
Approved: |
35,000
|
14,700
|
12
|
Program Change: |
|
0
|
12
|
Adjustment: |
|
0
|
0
|
DOJ-ATF |
|
OMB NO.: |
1140-0055
|
Identification of Explosive Materials
RECEIVED: 08/30/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,563
|
1
|
|
Requested: |
1,563
|
1
|
|
Approved: |
1,563
|
1
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
DOJ-ATF |
|
OMB NO.: |
1140-0070
|
Application for Explosives License or Permit
RECEIVED: 08/30/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10,000
|
15,000
|
690
|
Requested: |
10,000
|
15,000
|
|
Approved: |
10,000
|
15,000
|
0
|
Program Change: |
|
0
|
-690
|
Adjustment: |
|
0
|
0
|
DOJ-ATF |
|
OMB NO.: |
1140-0090
|
National Firearms Act (NFA) - Special Occupation Taxes (SOT)
RECEIVED: 09/29/2004
** COMPLETED: 11/05/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,000
|
983
|
1
|
Requested: |
3,000
|
983
|
1
|
Approved: |
3,000
|
983
|
1
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Department of Labor
Reviews Completed
DOL-ETA |
|
OMB NO.: |
1205-0392
|
Trade Act Participant Report (TAPR)
RECEIVED: 08/26/2004
** COMPLETED: 11/05/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
9,500
|
325
|
Requested: |
200
|
9,500
|
|
Approved: |
200
|
9,500
|
325
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
DOL-EBSA |
|
OMB NO.: |
1210-0076
|
Reg. Relating to Loans to Plan Participants and Beneficiaries
Who Are Parties In Interest With Respect to The Plan
RECEIVED: 08/17/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,310
|
1
|
283
|
Requested: |
1,700
|
1
|
428
|
Approved: |
1,700
|
1
|
428
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
145
|
DOL-ESA |
|
OMB NO.: |
1215-0031
|
Employer's First Report of Injury or Occupational Disease;
Physician's Report on Impairment of Vision; and Employer's
Supplementary Report of Accident or Occupational Illness
RECEIVED: 08/12/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
26,660
|
6,705
|
11
|
Requested: |
23,220
|
5,835
|
10
|
Approved: |
23,220
|
5,835
|
10
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-870
|
-1
|
DOL-ESA |
|
OMB NO.: |
1215-0058
|
Operator Controversion, Operator Response, Operator Response to
Schedule for Submission of Additional Evidence, and Operator
Response to Notice of Claim
RECEIVED: 08/12/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10,800
|
2,283
|
4
|
Requested: |
8,200
|
1,709
|
3
|
Approved: |
8,200
|
1,709
|
3
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-574
|
-1
|
DOL-BLS |
|
OMB NO.: |
1220-0157
|
National Longitudinal Survey of Youth 1997
RECEIVED: 07/12/2004
COMPLETED: 10/25/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
17,151
|
10,972
|
|
Requested: |
8,800
|
7,990
|
|
Approved: |
8,800
|
7,990
|
|
Program Change: |
|
-2,982
|
|
Adjustment: |
|
0
|
|
DOL-BLS |
|
OMB NO.: |
1220-0050
|
The Consumer Expenditure Surveys: The Quarterly Interview and
the Diary
RECEIVED: 07/28/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
80,652
|
95,352
|
|
Requested: |
86,925
|
89,018
|
|
Approved: |
86,925
|
89,018
|
|
Program Change: |
|
-6,334
|
|
Adjustment: |
|
0
|
|
DOL-ASVET |
|
OMB NO.: |
1293-XXXX
|
Uniformed Services Employment and Reemployment Rights Act of 1964
RECEIVED: 09/08/2004
COMPLETED: 11/03/2004 Comment filed
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
132,500
|
66,250
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Department of State
Reviews Completed
STATE-AFA |
|
OMB NO.: |
1405-0157
|
Export Declaration of Defense Technical Data or Services
RECEIVED: 08/09/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
10,000
|
2,500
|
|
Approved: |
10,000
|
2,500
|
|
Program Change: |
|
2,500
|
|
Adjustment: |
|
0
|
|
Department of the Treasury
Reviews Completed
TREAS-DO |
|
OMB NO.: |
1505-0174
|
Financial Subsidiaries (Interim Final Rule)
RECEIVED: 09/30/2004
COMPLETED: 10/15/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
20
|
400
|
|
Approved: |
20
|
400
|
|
Program Change: |
|
400
|
|
Adjustment: |
|
0
|
|
TREAS-TTB |
|
OMB NO.: |
1513-0118
|
Formulas for Fernmented Beverage Products
RECEIVED: 08/17/2004
COMPLETED: 10/13/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
500
|
500
|
38
|
Approved: |
500
|
500
|
38
|
Program Change: |
|
500
|
38
|
Adjustment: |
|
0
|
0
|
TREAS-TTB |
|
OMB NO.: |
1513-0001
|
Tax Authorization Information
RECEIVED: 09/08/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50
|
50
|
|
Requested: |
50
|
50
|
|
Approved: |
50
|
50
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-TTB |
|
OMB NO.: |
1513-0003
|
Referral of Information
RECEIVED: 09/08/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
500
|
500
|
|
Requested: |
500
|
500
|
|
Approved: |
500
|
500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-TTB |
|
OMB NO.: |
1513-0054
|
Offer in Compromise of liability incurred under the provisions
of Title 26 U.S.C. enforced and administered by the Alcohol and
Tobacco Tax and Trade Bureau
RECEIVED: 09/08/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
40
|
80
|
|
Requested: |
40
|
80
|
|
Approved: |
40
|
80
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-TTB |
|
OMB NO.: |
1513-0096
|
TTB F 5300.27, Federal Firearms and Ammunition Excise Tax Deposit
RECEIVED: 09/09/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
18
|
770
|
0
|
Requested: |
18
|
770
|
27
|
Approved: |
18
|
770
|
27
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
27
|
TREAS-TTB |
|
OMB NO.: |
1513-0025
|
Notice of Release of Tobacco Products, Cigarette Papers, or
Cigarette Tubes
RECEIVED: 09/29/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
1,224
|
306
|
|
Approved: |
1,224
|
306
|
|
Program Change: |
|
306
|
|
Adjustment: |
|
0
|
|
TREAS-TTB |
|
OMB NO.: |
1513-0058
|
Usual and Customary Business Records Maintained by Brewers
RECEIVED: 09/29/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
1,400
|
1
|
|
Approved: |
1,400
|
1
|
|
Program Change: |
|
1
|
|
Adjustment: |
|
0
|
|
TREAS-BPD |
|
OMB NO.: |
1535-0091
|
Information collected to establish a valid reason for a waiver
of the requirements of the regulations.
RECEIVED: 09/24/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,000
|
167
|
0
|
Requested: |
2,000
|
417
|
5
|
Approved: |
2,000
|
417
|
5
|
Program Change: |
|
250
|
5
|
Adjustment: |
|
0
|
0
|
TREAS-BPD |
|
OMB NO.: |
1535-0117
|
Resolution For Transactions Involving Registered Securities
RECEIVED: 09/29/2004
COMPLETED: 11/01/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
500
|
85
|
|
Requested: |
500
|
85
|
|
Approved: |
500
|
85
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-0901
|
Mortgage Interest Statement
RECEIVED: 09/03/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
66,989,155
|
8,038,699
|
|
Requested: |
66,989,155
|
8,038,699
|
|
Approved: |
66,989,155
|
8,038,699
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1266
|
Expenses for Business Use of Your Home
RECEIVED: 09/03/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
4,000,000
|
10,400,000
|
|
Requested: |
4,000,000
|
10,400,000
|
|
Approved: |
4,000,000
|
10,400,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1882
|
Request for Waiver of Annual Income Recertification Requirement
for the Low-Income Housing Credit
RECEIVED: 09/14/2004
COMPLETED: 10/19/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
1,598
|
|
Requested: |
200
|
1,598
|
|
Approved: |
200
|
1,598
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1890
|
Revenue Procedure 2004-44, Extension of the Amortization Period
RECEIVED: 09/14/2004
COMPLETED: 10/19/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
50
|
2,500
|
|
Requested: |
50
|
2,500
|
|
Approved: |
50
|
2,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1205
|
Disabled Access Credit
RECEIVED: 09/23/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
26,133
|
246,696
|
|
Requested: |
26,133
|
202,270
|
|
Approved: |
26,133
|
202,270
|
|
Program Change: |
|
-44,426
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1292
|
PS-97-91 and PS-101-90 (Final) Enhanced Oil Recovery Credit
RECEIVED: 09/23/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
20
|
1,460
|
|
Requested: |
20
|
1,460
|
|
Approved: |
20
|
1,460
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1345
|
CO-99-91 (Final) Limitations on Corporate Net Operating Loss
RECEIVED: 09/23/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10
|
10
|
|
Requested: |
1
|
1
|
|
Approved: |
1
|
1
|
|
Program Change: |
|
-9
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1352
|
PS-276-76 (Final) Treatment of Gain From Disposition of Certain
Natural Resource Recapture Property
RECEIVED: 09/23/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
400
|
2,000
|
|
Requested: |
400
|
2,000
|
|
Approved: |
400
|
2,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1362
|
Renewable Electricity Producation Credit
RECEIVED: 09/23/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
70
|
874
|
|
Requested: |
70
|
755
|
|
Approved: |
70
|
755
|
|
Program Change: |
|
-119
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1317
|
INTL-79-91 (Final) Information Returns Required of United States
Persons with Respect to Certain Foreign Corporations
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
1
|
|
Requested: |
1
|
1
|
|
Approved: |
1
|
1
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1324
|
CO-88-90 (Final) Limitation on Net Operating Loss Carryforwards
and Certain Built-in Losses Following Ownership Change; Special
Rule for Value of a Loss Corporation Under the Jurisdiction...
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,250
|
813
|
|
Requested: |
3,250
|
813
|
|
Approved: |
3,250
|
813
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1341
|
EE-43-92 (Final) Direct Rollovers and 20-Percent Withholding
Upon Eligible Rollover Distributions from Qualified Plans
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10,323,926
|
2,129,669
|
|
Requested: |
10,323,926
|
2,129,669
|
|
Approved: |
10,323,926
|
2,129,669
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1343
|
PS-100-88 (Final) Valuation Tables
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,000
|
4,500
|
|
Requested: |
6,000
|
4,500
|
|
Approved: |
6,000
|
4,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1361
|
PS-89-91 (Final) Exports of Chemicals that Deplete the Ozone
Layer; Special Rules for Certain Medical Uses of Chemicals That
Deplete the Ozone Layer
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,305
|
201
|
|
Requested: |
1,305
|
201
|
|
Approved: |
1,305
|
201
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1416
|
Credit for Contributions to Selected Community Development
Corporations
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
34
|
268
|
|
Requested: |
34
|
210
|
|
Approved: |
34
|
210
|
|
Program Change: |
|
-58
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1743
|
Summary of Archer MSAs
RECEIVED: 09/30/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
400,000
|
1,540,000
|
|
Requested: |
400,000
|
1,540,000
|
|
Approved: |
400,000
|
1,540,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1897
|
REG-120616-03 (NPRM and Temporary) Entry of Taxable Fuel
RECEIVED: 10/01/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,125
|
281
|
|
Requested: |
1,125
|
281
|
|
Approved: |
1,125
|
281
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-0087
|
1040-ES and 1040-ES(E), Estimated Tax for Individuals; 1040-ES
(NR), U.S. Estimated Tax for Nonresident Alien Individuals;
1040- ES (Espanol), Contribuciones Federales Estimadas Del
Trabajo Por
RECEIVED: 10/18/2004
COMPLETED: 10/19/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
40,991,991
|
94,591,282
|
|
Requested: |
40,991,991
|
94,471,282
|
|
Approved: |
40,991,991
|
94,471,282
|
|
Program Change: |
|
-120,000
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1909
|
REG-149519-03 (NPRM) Section 707 Regarding Disguised Sales,
Generally
RECEIVED: 10/19/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
22,500
|
7,500
|
|
Approved: |
22,500
|
7,500
|
|
Program Change: |
|
7,500
|
|
Adjustment: |
|
0
|
|
TREAS-IRS |
|
OMB NO.: |
1545-1910
|
Information Return of U.S. Persons With Respect to Foreign
Disregarded Entities
RECEIVED: 10/22/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
750,000
|
1,832,500
|
|
Approved: |
750,000
|
1,832,500
|
|
Program Change: |
|
1,832,500
|
|
Adjustment: |
|
0
|
|
Department of Veterans Affairs
Reviews Completed
Nation-wide Customer Satisfaction Surveys
RECEIVED: 07/26/2004
COMPLETED: 10/14/2004 Withdrawn/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
546,600
|
207,287
|
|
Requested: |
557,040
|
213,137
|
|
Approved: |
546,600
|
207,287
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Corporation for National and Community Service
Reviews Completed
Spirit Service Awards Nomination Guidelines and Application -
Senior Corps
RECEIVED: 08/27/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
600
|
9,900
|
Requested: |
200
|
600
|
0
|
Approved: |
200
|
600
|
0
|
Program Change: |
|
0
|
-9,900
|
Adjustment: |
|
0
|
0
|
Spirit Service Awards Nomination Guidelines and Application -
AmeriCorps
RECEIVED: 08/27/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
600
|
9,900
|
Requested: |
200
|
600
|
0
|
Approved: |
200
|
600
|
0
|
Program Change: |
|
0
|
-9,900
|
Adjustment: |
|
0
|
0
|
Spirit of Service Awards Nomination Guidelines and Application -
Learn and Serve America
RECEIVED: 08/27/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
200
|
600
|
9,900
|
Requested: |
200
|
600
|
0
|
Approved: |
200
|
600
|
0
|
Program Change: |
|
0
|
-9,900
|
Adjustment: |
|
0
|
0
|
Voucher and Payment Request Form
RECEIVED: 09/02/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
55,000
|
4,585
|
|
Requested: |
69,000
|
5,750
|
|
Approved: |
69,000
|
5,750
|
|
Program Change: |
|
1,165
|
|
Adjustment: |
|
0
|
|
Peer Reviewer Application Instructions
RECEIVED: 09/08/2004
COMPLETED: 10/14/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
7,500
|
|
Requested: |
1
|
2,000
|
|
Approved: |
1
|
2,000
|
|
Program Change: |
|
-5,500
|
|
Adjustment: |
|
0
|
|
AmeriCorps Alumni Profile Card
RECEIVED: 09/14/2004
COMPLETED: 10/14/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
1
|
800
|
|
Approved: |
1
|
800
|
|
Program Change: |
|
800
|
|
Adjustment: |
|
0
|
|
AmeriCorps*National, State and Indian Tribes and U.S.
Territories 2005 Application Instructions
RECEIVED: 09/16/2004
COMPLETED: 10/14/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,000
|
20,334
|
|
Requested: |
1
|
20,000
|
|
Approved: |
1
|
20,000
|
|
Program Change: |
|
-334
|
|
Adjustment: |
|
0
|
|
AmeriCorps Education Awards Program 2005 Application Instructions
RECEIVED: 09/16/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
300
|
2,450
|
|
Requested: |
1
|
2,400
|
|
Approved: |
1
|
2,400
|
|
Program Change: |
|
-50
|
|
Adjustment: |
|
0
|
|
Environmental Protection Agency
Reviews Completed
EPA-OECA |
|
OMB NO.: |
2020-0028
|
ECOS Survey of State Performance Measures
RECEIVED: 09/03/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
49
|
98
|
|
Approved: |
49
|
98
|
|
Program Change: |
|
98
|
|
Adjustment: |
|
0
|
|
EPA-SWER |
|
OMB NO.: |
2050-0050
|
Hazardous Waste Specific Unit Requirements and Special Waste
Processes and Types (Renewal)
RECEIVED: 03/29/2004
COMPLETED: 10/14/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,341
|
287,069
|
875
|
Requested: |
8,170
|
669,476
|
4,329
|
Approved: |
8,170
|
669,476
|
4,329
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
382,407
|
3,454
|
EPA-AR |
|
OMB NO.: |
2060-0277
|
Regulation of Fuel and Fuel Additivies (Renewal)
RECEIVED: 04/22/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
53,171
|
101,571
|
22,986
|
Requested: |
53
|
96,625
|
22,984
|
Approved: |
53
|
96,625
|
22,984
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-4,946
|
-2
|
EPA-AR |
|
OMB NO.: |
2060-0243
|
State Operating Permits Regulations (40 CFR part 70) (Renewal)
RECEIVED: 09/03/2004
COMPLETED: 11/01/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
21,036
|
4,779,620
|
|
Requested: |
17,738
|
5,109,548
|
|
Approved: |
17,738
|
5,109,548
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
329,928
|
|
EPA-AR |
|
OMB NO.: |
2060-0336
|
Federal Operating Permit Regulations (40 CFR part 71)(Renewal)
RECEIVED: 09/03/2004
COMPLETED: 11/01/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,179
|
15,323
|
|
Requested: |
1,717
|
24,077
|
|
Approved: |
1,717
|
24,077
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
8,754
|
|
EPA-AR |
|
OMB NO.: |
2060-XXXX
|
St. Croix Environmental Information Management and Outreach
Initiative
RECEIVED: 10/01/2004
COMPLETED: 10/08/2004 Improperly submitted
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
100
|
150
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
EPA-OPPTS |
|
OMB NO.: |
2070-0067
|
Chemical-Specific Rules, Toxic Substanes Control Act Section 8(a)
RECEIVED: 04/07/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
4
|
275
|
|
Requested: |
4
|
275
|
|
Approved: |
4
|
275
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
EPA-OPPTS |
|
OMB NO.: |
2070-0142
|
Plant-Incorporated Protectants; CBI Substantiation and Adverse
Effects Reporting
RECEIVED: 07/26/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
15
|
1,370
|
|
Requested: |
14
|
303
|
|
Approved: |
14
|
303
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-1,067
|
|
National Aeronautics and Space Administration
Reviews Completed
AST - Technology Utilization
RECEIVED: 08/17/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
930
|
895
|
|
Requested: |
1,605
|
1,545
|
|
Approved: |
1,605
|
1,545
|
|
Program Change: |
|
650
|
|
Adjustment: |
|
0
|
|
National Archives and Records Administration
Reviews Completed
Volunteer Service Application Form
RECEIVED: 07/15/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
2,300
|
575
|
|
Approved: |
2,300
|
575
|
|
Program Change: |
|
575
|
|
Adjustment: |
|
0
|
|
Request for and Record of Pass
RECEIVED: 07/27/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,266
|
63
|
|
Requested: |
1,300
|
65
|
|
Approved: |
1,300
|
65
|
|
Program Change: |
|
2
|
|
Adjustment: |
|
0
|
|
Institute of Museum and Library Services
Reviews Completed
Digital Collections and Content - Collection Registry Entry/Edit
Form
RECEIVED: 09/21/2004
COMPLETED: 11/03/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
43
|
21
|
268
|
Approved: |
130
|
65
|
268
|
Program Change: |
|
65
|
268
|
Adjustment: |
|
0
|
0
|
National Science Foundation
Reviews Completed
Response Plan and Educational Materials for Non-Governmental
Antarctic Expeditions
RECEIVED: 08/31/2004
COMPLETED: 11/03/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
12
|
480
|
|
Requested: |
12
|
480
|
|
Approved: |
12
|
480
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Overseas Private Investment Corporation
Reviews Completed
Project Information Report
RECEIVED: 08/24/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
25
|
175
|
|
Requested: |
30
|
1,200
|
|
Approved: |
30
|
1,200
|
|
Program Change: |
|
|
|
Adjustment: |
|
1,025
|
|
Peace Corps
Reviews Completed
Peace Corps Week Brochure
RECEIVED: 08/19/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
8,100
|
55
|
Requested: |
10,000
|
500
|
13
|
Approved: |
10,000
|
500
|
0
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-7,600
|
-55
|
Peace Corps Week Survey
RECEIVED: 08/19/2004
COMPLETED: 10/15/2004 Withdrawn
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
2,500
|
208
|
|
Approved: |
0
|
0
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Railroad Retirement Board
Reviews Completed
Representative Payee Monitoring
RECEIVED: 09/01/2004
COMPLETED: 11/03/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,535
|
2,032
|
|
Requested: |
6,535
|
2,032
|
|
Approved: |
6,535
|
2,032
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Application and Claim for Unemployment Benefits and Employment
Service
RECEIVED: 09/14/2004
COMPLETED: 10/25/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
78,700
|
8,617
|
|
Requested: |
127,200
|
13,467
|
|
Approved: |
127,200
|
13,467
|
|
Program Change: |
|
2,320
|
|
Adjustment: |
|
2,530
|
|
Selective Service System
Reviews Completed
Potential Board Member Information
RECEIVED: 09/14/2004
COMPLETED: 10/27/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
900
|
225
|
|
Requested: |
900
|
225
|
|
Approved: |
900
|
225
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Small Business Administration
Reviews Completed
8(a) Annual Update
RECEIVED: 07/23/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,942
|
13,884
|
|
Requested: |
6,700
|
13,400
|
|
Approved: |
6,700
|
13,400
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-484
|
|
SBIC Financial Reports
RECEIVED: 07/28/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,040
|
16,480
|
0
|
Requested: |
1,265
|
19,855
|
6,600,000
|
Approved: |
1,265
|
19,855
|
6,600
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
3,375
|
6,600
|
Social Security Administration
Reviews Completed
Request for Correction of Earnings Record, 20 CFR 404.820 and
422.125
RECEIVED: 08/20/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
375,000
|
62,500
|
|
Requested: |
375,000
|
62,500
|
|
Approved: |
375,000
|
62,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Statement of Agricultural Employer (Year Prior to 1988; 1988 and
Later), 20 CFR 404.702, .802, & .1056
RECEIVED: 08/20/2004
COMPLETED: 10/18/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
125,000
|
37,500
|
|
Requested: |
125,000
|
37,500
|
|
Approved: |
125,000
|
62,500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
25,000
|
|
Medical Report (General), 20 CFR 404.1512-.1515 and 416.912-.915
RECEIVED: 08/20/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
750,000
|
375,000
|
|
Requested: |
750,000
|
375,000
|
|
Approved: |
750,000
|
375,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Disability Hearing Officer's Report of Disability Hearing
RECEIVED: 08/20/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
100,000
|
100,000
|
|
Requested: |
100,000
|
100,000
|
|
Approved: |
100,000
|
100,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Beneficiary Recontact Report 20 CFR 404.703 and .705
RECEIVED: 08/20/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
982,357
|
49,118
|
|
Requested: |
982,357
|
49,118
|
|
Approved: |
982,357
|
49,118
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Annual Registration Statement Identifying Separated Participants
with Deferred Vested Benefits
RECEIVED: 08/30/2004
** COMPLETED: 11/04/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
88,000
|
220,000
|
12,194
|
Requested: |
88,000
|
220,000
|
|
Approved: |
88,000
|
220,000
|
12,194
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Expanded Cross-Program Recovery Regulations; 20 CFR Part 404
Subpart F & 20 CFR 416 Subpart E
RECEIVED: 09/09/2004
COMPLETED: 11/03/2004 Approved with change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
1
|
1
|
|
Approved: |
1
|
1
|
|
Program Change: |
|
1
|
|
Adjustment: |
|
0
|
|
Tennessee Valley Authority
Reviews Completed
TVA Police Customer Satisfaction Survey
RECEIVED: 07/30/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,000
|
167
|
|
Requested: |
50
|
4
|
|
Approved: |
50
|
4
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-163
|
|
Federal Acquisition Regulations
Reviews Completed
Quality Assurance Requirements - FAR Sections Affected: Subparts
46.1 thru 46.3; 52.246-2 thru 52.246-8; 52.246-10; 52.246-12;
52.246-15
RECEIVED: 09/02/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
950
|
39,719
|
|
Requested: |
850
|
35,746
|
|
Approved: |
850
|
35,746
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-3,973
|
|
Prompt Payment - FAR Sections Affected: Subparts 32.9; 52.232-5;
52.232-26; 2.232-27; 52.212-4
RECEIVED: 09/03/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
420,134
|
671,211
|
|
Requested: |
403,326
|
644,360
|
|
Approved: |
403,326
|
644,360
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-26,851
|
|
Contract Financing - FAR Sections Affected: Subparts 32.0 thru
32.1; 32.2; 32.5; 32,10; 52,232-29 thru 32
RECEIVED: 09/03/2004
COMPLETED: 10/26/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
11,000
|
22,000
|
|
Requested: |
11,000
|
22,000
|
|
Approved: |
11,000
|
22,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Commodity Futures Trading Commission
Reviews Completed
Practice by Former Members and Employees of the Commission
Pursuant to 17 C.F.R. 140.735.6
RECEIVED: 07/28/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3
|
4
|
|
Requested: |
4
|
1
|
|
Approved: |
4
|
1
|
|
Program Change: |
|
-3
|
|
Adjustment: |
|
0
|
|
Rules Pertaining to Contract Markets and Their Members
RECEIVED: 08/13/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
30,537
|
770,506
|
|
Requested: |
305,996
|
770,527
|
|
Approved: |
305,996
|
770,527
|
|
Program Change: |
|
21
|
|
Adjustment: |
|
0
|
|
Part 41, Relating to Security Futures Products
RECEIVED: 08/13/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
16,530
|
3,472
|
|
Requested: |
2,739
|
1,620
|
|
Approved: |
2,739
|
1,620
|
|
Program Change: |
|
-1,852
|
|
Adjustment: |
|
0
|
|
Large Trader Reports
RECEIVED: 09/01/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
62,760
|
18,575
|
|
Requested: |
62,420
|
18,574
|
|
Approved: |
62,420
|
18,574
|
|
Program Change: |
|
-1
|
|
Adjustment: |
|
0
|
|
Futures Volume, Open Interest, Price, Deliveries, and Exchanges
of Futures
RECEIVED: 09/01/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,640
|
1,320
|
|
Requested: |
3,520
|
1,760
|
|
Approved: |
3,520
|
1,760
|
|
Program Change: |
|
440
|
|
Adjustment: |
|
0
|
|
Federal Communications Commission
Reviews Completed
Request for Technical Support - Help Request Form
RECEIVED: 09/14/2004
COMPLETED: 11/02/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
31,500
|
4,200
|
336
|
Requested: |
36,300
|
4,840
|
387
|
Approved: |
36,300
|
4,840
|
387
|
Program Change: |
|
640
|
51
|
Adjustment: |
|
0
|
0
|
Regulatory Fee Assessment Notifications
RECEIVED: 10/13/2004
COMPLETED: 10/13/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,130
|
283
|
|
Requested: |
1,130
|
283
|
|
Approved: |
1,130
|
283
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Section 76.29, Special Temporary Authority
RECEIVED: 10/22/2004
COMPLETED: 10/22/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
3
|
|
Requested: |
1
|
3
|
|
Approved: |
1
|
3
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Section 76.911, Petition for Reconsideration of Certification
RECEIVED: 10/22/2004
COMPLETED: 10/22/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
45
|
410
|
|
Requested: |
25
|
210
|
|
Approved: |
25
|
210
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-200
|
|
Cost of Service Filing for Regulated Cable Service, FCC Form 1220
RECEIVED: 11/05/2004
** COMPLETED: 11/05/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
30
|
1,640
|
120
|
Requested: |
10
|
1,220
|
60
|
Approved: |
10
|
1,220
|
60
|
Program Change: |
|
0
|
-60
|
Adjustment: |
|
-420
|
0
|
Setting Maximum Initial Permitted Rates for Regulated Cable
Services, FCC Form 1200
RECEIVED: 11/05/2004
** COMPLETED: 11/05/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
150
|
1,100
|
75
|
Requested: |
50
|
800
|
38
|
Approved: |
50
|
800
|
38
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-300
|
-37
|
Federal Deposit Insurance Corporation
Reviews Completed
Application for Waiver of Prohibition on Acceptance of Brokered
Deposits b Adequately Capitalized Insured Institutions
RECEIVED: 08/09/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
25
|
150
|
|
Requested: |
30
|
180
|
|
Approved: |
30
|
180
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
30
|
|
Real Estate Lending Standards
RECEIVED: 08/09/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5,600
|
112,000
|
|
Requested: |
5,300
|
106,000
|
|
Approved: |
5,300
|
106,000
|
|
Program Change: |
|
-6,000
|
|
Adjustment: |
|
0
|
|
Management Official Interlocks
RECEIVED: 08/12/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5
|
20
|
|
Requested: |
2
|
8
|
|
Approved: |
2
|
8
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-12
|
|
Community Reinvestment Act
RECEIVED: 08/16/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5,341
|
331,358
|
|
Requested: |
5,296
|
193,975
|
|
Approved: |
5,296
|
193,975
|
|
Program Change: |
|
26,450
|
|
Adjustment: |
|
-163,833
|
|
Procedures for Monitoring Bank Secrecy Act Compliance
RECEIVED: 08/18/2004
COMPLETED: 10/08/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
5,600
|
2,800
|
|
Requested: |
5,300
|
2,650
|
|
Approved: |
5,300
|
2,650
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-150
|
|
Federal Reserve System
Reviews Completed
Recordkeeping and Disclosure Requirements Associated with
Securities Transactions Pursuant to Regulation H
RECEIVED: 10/22/2004
COMPLETED: 10/22/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,136,644
|
158,327
|
|
Requested: |
3,136,644
|
158,327
|
|
Approved: |
3,136,644
|
158,327
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Quantitative Impact Study
RECEIVED: 10/25/2004
COMPLETED: 10/25/2004 Delegated
|
Responses: |
Hours: |
Costs (000): |
Previous: |
0
|
0
|
|
Requested: |
50
|
8,000
|
|
Approved: |
50
|
8,000
|
|
Program Change: |
|
8,000
|
|
Adjustment: |
|
0
|
|
National Credit Union Administration
Reviews Completed
Mergers of Federal-Insured Credit Unions
RECEIVED: 08/17/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
304
|
4,560
|
213
|
Requested: |
303
|
7,530
|
212
|
Approved: |
303
|
7,530
|
212
|
Program Change: |
|
2,970
|
-1
|
Adjustment: |
|
0
|
0
|
12 C.F.R. Sections 723.5 - Develop written policies; 723.11 -
Waiver requests; 723.16 - Application for approval
RECEIVED: 08/17/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,500
|
6,000
|
|
Requested: |
1,900
|
8,020
|
|
Approved: |
1,900
|
8,020
|
|
Program Change: |
|
2,020
|
|
Adjustment: |
|
0
|
|
Part 708a, Charter conversions - documentation required for
credit union members and National Credit Union Administration in
the charter conversion context
RECEIVED: 08/17/2004
COMPLETED: 10/07/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10
|
200
|
|
Requested: |
5
|
115
|
|
Approved: |
5
|
115
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-85
|
|
Nuclear Regulatory Commission
Reviews Completed
10 CFR Part 21, Reporting of Defects and Noncompliance
RECEIVED: 08/26/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
170
|
12,565
|
|
Requested: |
108
|
7,790
|
|
Approved: |
108
|
7,790
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-4,775
|
|
NRC Form 327, Special Nuclear Material (SNM) and Source Material
(SM) Physical Inventory Summary Report, and NUREG/BR-009,
Instructions and Guidance for Completing Physical Inventory
RECEIVED: 08/26/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
23
|
98
|
|
Requested: |
23
|
98
|
|
Approved: |
23
|
98
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
10 CR Part 34, Licenses for Radiography and Radiation Safety
Requirements for Radiographic Operations
RECEIVED: 09/10/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
546
|
139,644
|
0
|
Requested: |
580
|
244,048
|
15
|
Approved: |
580
|
244,048
|
15
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
104,404
|
15
|
10 CFR Part 39, Licenses and Radiation Safety Requirements for
Well Logging
RECEIVED: 09/10/2004
COMPLETED: 10/20/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,408
|
27,352
|
0
|
Requested: |
1,800
|
34,933
|
2
|
Approved: |
1,800
|
34,933
|
2
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
7,581
|
2
|
10 CFR Part 63, Disposal of High-Level Radioactive Wastes in a
Proposed Geologic Repository at Yucca Mountain, NV.
RECEIVED: 09/10/2004
COMPLETED: 10/29/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
9
|
363
|
|
Requested: |
9
|
363
|
|
Approved: |
9
|
363
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
10 CFR Part 110, Export and Import of Nuclear Equipment and
Material
RECEIVED: 09/16/2004
COMPLETED: 10/28/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
254
|
316
|
|
Requested: |
1,089
|
525
|
|
Approved: |
1,089
|
525
|
|
Program Change: |
|
209
|
|
Adjustment: |
|
0
|
|
Securities and Exchange Commission
Reviews Completed
Form S-1-Registration Statement
RECEIVED: 07/14/2004
COMPLETED: 10/18/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
443
|
193,702
|
174,331
|
Requested: |
265
|
112,753
|
|
Approved: |
265
|
112,753
|
101,477
|
Program Change: |
|
1,563
|
1,406
|
Adjustment: |
|
-82,512
|
-74,260
|
Rule 204-3 [17 CFR 275.204-3] under the Investment Advisers Act
of 1940
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
15,678,000
|
5,412,643
|
|
Requested: |
17,637,750
|
6,089,293
|
|
Approved: |
15,678,000
|
5,412,643
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Form ADV
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
23,350
|
102,653
|
2,760
|
Requested: |
24,222
|
131,611
|
3,539
|
Approved: |
23,350
|
102,653
|
2,760
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Rule 0-2 and Form ADV-NR under the Investment Advisers Act of
1940
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
15
|
15
|
|
Requested: |
17
|
17
|
|
Approved: |
15
|
15
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 206(4)-2 under the Investment Advisers Act of 1940-Custody
of Funds or Securities of Clients by Investment Advisers
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
144,225
|
72,113
|
963
|
Requested: |
797,475
|
398,738
|
5,325
|
Approved: |
144,225
|
72,113
|
963
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Rule 206(4)-3 under the Investment Advisers Act of 1940 [17 CFR
275.206(4)-3]
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
17,160
|
10,982
|
|
Requested: |
19,305
|
12,355
|
|
Approved: |
17,160
|
10,982
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 204-2
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
8,019
|
1,537,884
|
10,665
|
Requested: |
8,994
|
1,724,870
|
11,962
|
Approved: |
8,019
|
1,537,884
|
10,665
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
0
|
0
|
Rule 203-2 and Form ADV-W under the Investment Advisers Act of
1940
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1,000
|
500
|
|
Requested: |
1,156
|
578
|
|
Approved: |
1,000
|
500
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 206(4)-4 under the Investment Advisers Act of 1940 [17 CFR
275.206(4)-4]
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,024
|
10,118
|
|
Requested: |
2,278
|
11,383
|
|
Approved: |
2,024
|
10,118
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 203-3 and Form ADV-H under the Investment Advisers Act of
1940
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
10
|
10
|
|
Requested: |
11
|
11
|
|
Approved: |
10
|
10
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 206(4)-6 Under the Investment Advisers Act of 1940 [17 CFR
275.206(4)-6]
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6,203
|
103,590
|
|
Requested: |
7,178
|
119,873
|
|
Approved: |
6,203
|
103,590
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Investment Advisers Act rule 206(4)-7, 17 C.F.R. Sec.
275.206(4)- 7, Compliance procedures and practices.
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
7,790
|
623,200
|
|
Requested: |
8,765
|
701,200
|
|
Approved: |
7,790
|
623,200
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 204A-1
RECEIVED: 07/22/2004
COMPLETED: 10/18/2004 Comment filed/cont
|
Responses: |
Hours: |
Costs (000): |
Previous: |
3,817,044
|
945,841
|
|
Requested: |
4,281,144
|
1,060,842
|
|
Approved: |
3,817,044
|
945,841
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 19b-7 Under the Securities Exchange Act of 1934 and Form
19b-7 under the Securities Exchange Act of 1934
RECEIVED: 08/02/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
120
|
1,860
|
|
Requested: |
120
|
1,860
|
|
Approved: |
120
|
1,860
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 6a-4 under the Securities Exchange Act of 1934 and Form 1-N
under the Securities Exchange Act of 1934
RECEIVED: 08/02/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
189
|
410
|
|
Requested: |
189
|
420
|
|
Approved: |
189
|
420
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
10
|
|
Regulation 12B-Registration and Reporting
RECEIVED: 08/04/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
1
|
1
|
|
Requested: |
1
|
1
|
|
Approved: |
1
|
1
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Form 15
RECEIVED: 08/04/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
2,000
|
3,000
|
|
Requested: |
2,000
|
3,000
|
|
Approved: |
2,000
|
3,000
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Form 8-K
RECEIVED: 08/12/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
154,007
|
410,406
|
39,895
|
Requested: |
154,007
|
583,574
|
58,357
|
Approved: |
154,007
|
583,574
|
58,357
|
Program Change: |
|
6,284
|
628
|
Adjustment: |
|
166,884
|
17,834
|
Rule 303 (17 CFR 242.303) Record Preservation Requirements for
Alternative Trading Systems
RECEIVED: 08/12/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
69
|
276
|
|
Requested: |
50
|
200
|
|
Approved: |
50
|
200
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-76
|
|
Rule 19b-5 Under the Securities Exchange Act of 1934 (17 CFR
240.19b-5); Pilot Trading System Rule Filing Requirements
RECEIVED: 08/12/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
6
|
252
|
|
Requested: |
6
|
252
|
|
Approved: |
6
|
252
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
0
|
|
Rule 301 (17 CFR 242.301) Requirements for Alternative Trading
Systems that are not National Securities Exchanges
RECEIVED: 08/12/2004
COMPLETED: 10/13/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
493
|
1,988
|
37
|
Requested: |
379
|
1,533
|
0
|
Approved: |
379
|
1,533
|
31
|
Program Change: |
|
0
|
0
|
Adjustment: |
|
-455
|
-6
|
Rule 302 (17 CFR 242.302) Recordkeeping Requirements for
Alterna- tive Trading Systems
RECEIVED: 08/12/2004
COMPLETED: 10/12/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
69
|
2,484
|
|
Requested: |
50
|
1,800
|
|
Approved: |
50
|
1,800
|
|
Program Change: |
|
0
|
|
Adjustment: |
|
-684
|
|
U.S. Election Assistance Commission
Reviews Completed
United States Election Commission Election Day Data Survey
RECEIVED: 10/18/2004
COMPLETED: 10/25/2004 Approved without change
|
Responses: |
Hours: |
Costs (000): |
Previous: |
|
|
|
Requested: |
55
|
11,000
|
|
Approved: |
55
|
11,000
|
|
Program Change: |
|
11,000
|
|
Adjustment: |
|
0
|
|
|