If it is determined that your problem is due to a firewall constraint, you will be provided with a telephone number, and directed to have your " firewall person" contact our Firewall Center. The Firewall Center will need to have the following information:
The ACASS web-based performance evaluation form is now available for the 11/92 version of the DD2631. It was designed to allow users to enter an entire evaluation directly into the database (similar to the CCASS web form). Once the data has been entered, it is automatically processed in the database within 5 to 15 minutes. Users may opt to use either the web-based form or the PC Program.
Due to technical difficulties, the development and deployment of the 4/99 version of the DD2631 web-based form for entering ACASS performance evaluations has been significantly delayed. It is planned to incorporate this ability during the ACASS/CCASS System Enhancement. Please continue to view this web page for further information. Refer to ACASS Performance Evaluation Form Version Instructions for instructions about converting the DD2631 dated Apr 99 to the DD2631 dated Nov 92.
All performance evaluations must be completed on the DD2631 Nov 92 edition of the form until the ACASS database and associated tools are redesigned to accommodate the new form.
All performance evaluations which were completed on DD2631 Apr 99 edition must be converted to the DD2631 Nov 92 edition and submitted to the ACASS database using the following instructions.
If the evaluation was completed on the new DD 2631 (Apr 99 edition), then the rating official needs to take a blank old DD 2631 (11-92 edition) and mark only the adjustments needed input the evaluation into the ACASS PC program which is based on the old DD 2631. Specifically:
The rating official would also show contract number and delivery order number (if applicable). Also, add a standard note in the Remarks (Block 20). EXAMPLE: "Evaluation adjusted for ACASS entry using 11-92 edition of DD 2631." The rating and reviewing officials would then sign the old version of the form. The old and new version of the form would be stapled together and placed in the contract file after entry into ACASS.
Network Connection using communications software (Telnet, SignaTerm):
Warning: There are other database systems on the same
server as ACASS and CCASS. The "setupacs" command modifies the user's
".login" file to allow access to ACASS and CCASS. This command may delete
script in the user's ".login" file pointing to other applications. If the
user can not access other applications, after running the "setupacs"
command, please call CAIC Help Desk, (503) 808-4590.
There are validation checks made at the field level, and at the form level upon submit. An alert box appears at the field level, and a web page on the form level. You may print this page and use it as needed. Remember to close this page before returning to the form. With each error there is a possible action/solution listed via the Errors/Solutions List button. If there are no errors found, then a successful submit message should appear. The data is then transferred to the database within 15 minutes. If you have multiple evaluations to enter, after submitting an evaluation, you may hit the back button and make changes to the information you already entered. This may or may not reduce the amount of data entry time. A few tips regarding data entry may be found below…
An enhanced web version of the DD2626 is currently in testing phase.
There are validation checks made at the field level, and at the form level upon submit.
An alert box appears at the field level, and a web page on the form level.
You may print this page and use it as needed.
Remember to close this page before returning to the form.
With each error there is a possible action/solution listed via the Errors/Solutions List button.
If there are no errors found, then a successful submit message should appear.
The data is then transferred to the database within 15 minutes.
If you have multiple evaluations to enter, after submitting an evaluation, you may hit the back button and make
changes to the information you already entered.
This may or may not reduce the amount of data entry time.
A few tips regarding data entry may be found below…
Block | Item | Interim | D1 | Remark |
1 | Contract Number | Yes | D1 | |
1 | Task Order No | No | D1 | |
2 | CEC/DUNS No | Yes | D1 | |
2 | Sic Code | No | D1 | |
3 | Eval Type | Yes | D1 | |
4 | Percent | Yes | D1 | |
5 | Firm Name | Yes | D1 | |
5 | Street | Yes | D1 | |
5 | City | Yes | D1 | |
5 | State | Yes if US | D1 | |
5 | Zip | Yes | D1 | If state is selected |
5 | Country | Yes | D1 | |
5 | Contrator Type | Yes | D1 | (Prime/Sub contractor) |
6 | Proc Method | Yes | D1 | (Neg/Sealed bid) |
6 | Contract Type | Yes | D1 | (firm fixed price, Cost reimbursement, Other etc) |
7 | Description and Location of Work | Yes | D1 | Default value is: None Reported |
8 | Type and % Subcontracting | No | D1 | Default value is: None Reported |
9 | Amt of Basic Contract | Yes | D1 | |
9 | Total Mods | Yes | D1 | Even if it is zero entered - default value=0.00 |
9 | Liquidated Damages | No | D1 | Even if it is zero entered - default value=0.00 |
9 | Net Amt Paid | No | D1 | Even if it is zero entered - default value=0.00, It is possible for the contract financial information to not be available at the time of evaluation |
10 | Date of Award | Yes | D1 | |
10 | Original Completion Date | Yes | D1 | |
10 | Revised Completion Date | No | D1 | |
10 | Date work Accepted | No | D1 | |
11 | Overall Rating | Yes | D1 | |
12 | Evaluation By Organization | Yes | D1 | |
12 | Evaluation By Name | Yes | D1 | |
12 | Evaluation By Phone | Yes | D1 | |
12 | Evaluation By Date | Yes | D1 | |
13 | Reviewed By Organization | Yes | D1 | |
13 | Reviewed By Name | Yes | D1 | |
13 | Reviewed By Phone | Yes | D1 | |
13 | Reviewed By Date | Yes | D1 | |
15 | Quality Control | Min 1 | D1 | Question: Is at least 1 rating required in this category? At least 1 rating required across items 15-19? |
16 | Effectiveness of Management | Min 1 | D1 | Question: Is at least 1 rating required in this category? At least 1 rating required across items 15-19? |
17 | Timely Performance | Min 1 | D1 | Question: Is at least 1 rating required in this category? At least 1 rating required across items 15-19? |
18 | Compliance with Labor Standards | Min 1 | D1 | Question: Is at least 1 rating required in this category? At least 1 rating required across items 15-19? |
19 | Compliance with Safety Standards | Min 1 | D1 | Question: Is at least 1 rating required in this category? At least 1 rating required across items 15-19? |
20 | Remarks | Cond | D1 | If there is a M or U then remarks must occur. |
Capabilities for ACASS or CCASS
It is essential that each USACE user obtain, from their ISSO, the
necessary capability to ensure uninterrupted access to the ACASS and CCASS databases.
Inform your ISSO that you, as a current ACASS or CCASS user, need the following
UPASS capabilities:
All Non-USACE system users will be granted these permissions by the ACASS/CCASS team.
U.S. Army Corps of Engineers, Portland District
Contractor Appraisal Information Center, |
[ Contractor Appraisal & Support ] [ Contracting Home ] [ Portland District ] |