Jet Propulsion Laboratory JPL - Earth JPL - Solar System JPL - Stars & Galaxies JPL - Technology Jet Propulsion Laboratory California Institute of Technology Mars Exploration Rover Mission Home NASA Home Page Jet Propulsion Laboratory California Institute of Technology
header NASA logo
+ NASA Homepage
+ NASA en Español
+ Marte en Español
Overview Science Technology The Mission People Features Events Multimedia
Mars for Kids
Mars for Students
Mars for Educators
Mars for Press
+ Mars Home
+ Rovers Home
image link to mission page
image link to summary page
image link to rovers update
image link to week in review
image link to mission team
image link to launch vehicle
image link to spacecraft
link to mission timeline
Summary
Pre-launch Activities
Launch
Cruise
Approach
Entry, Descent, and Landing
Rover Egress
Surface Operations
communications to earth
Mission Timeline: Launch - archived

View Detailed Launch Information - archived

Launch phases begin when the spacecraft transfers to internal power on the launch pad and ends when the spacecraft is declared stable, healthy, ready to accept commands and the launch telemetry has been played back.

Rover A launched using a Delta II 7925 launch vehicle from Space Launch Complex 17A (SLC-17A) at the Cape Canaveral Air Force Station in Florida. Rover B launched using a Delta II 7925H launch vehicle from SLC-17B at the Cape. For details, see the launch vehicle in the spacecraft section.

The launch periods for each rover were as follows:

Mission
Open
Close
Arrival
Rover A June 5, 2003 June 24, 2003 January 4, 2004
Rover B June 25, 2003 July 15, 2003 January 25, 2004

To allow changeover of ground equipment at the launch pads, the two missions must be launched at least 10 days apart. There were two daily launch opportunities throughout both launch periods, providing a high probability of liftoff within the back-to-back MER launch periods. A constant arrival date is used for both rovers.

The major activities in this mission phase include:

  • the liftoff and boost phase of the launch

  • insertion into a circular parking orbit

  • a coast period followed by additional launch vehicle burns necessary to inject the spacecraft onto a trajectory to Mars

  • separation of the spacecraft from the launch vehicle

  • initial acquisition by the Deep Space Network

  • verification of the initial spacecraft health and operating conditions

  • the verified execution of a minimal set of post-launch commands

footer credits link footer feedback link footer related links footer link to sitemap
first gov logo
footer NASA logo