SNfactory Software we need but don't have: ------------------------------------------------------------------------------- Search: ------------------------------------------------------------------------------- NEAT field selection [3 wks] current moon avoidance future moon avoidance follow-up potential (e.g. visible last half of night for 2 months) Maui field rotation [1 wk] NEAT image transfer monitor [1 - 4 wks] speed interupts log alarm caching status and log switch to T1 backup (Palomar) Candidate catalog cross-id (from NED & SIMBAD) [1 - 2 wks] known redshift and other host galaxy parameters (size, orientation) QSO/variable star star forming galaxy Construction of historic NEAT lightcurves for all candidates [8 wks] Image-quality feedback [4 wks] Photometric bootstrap calibration (standard stars & image overlaps) [4 wks] Backup (databases, NEAT hdr info, etc.) [4 wks] (total 18 - 22 wks) ------------------------------------------------------------------------------- Scheduling: ------------------------------------------------------------------------------- Follow-up scheduler (can we use SPIKE?) [4 - 16 wks] N-telescopes current weather forecast future weather forecast current time available future time available current moon avoidance future moon avoidance candidate ranking active SN ranking (higher ranking if already invested) investment options (total 4 - 16 wks) ------------------------------------------------------------------------------- Generic Follow-up implementation ------------------------------------------------------------------------------- SNIFS observing script (see webpage description) [8 - 12 wks] Processing of SNIFS imaging data [8 - 12 wks] Automated field identification on-the-fly extinction estimatation (including web plots) on-the-fly cross calibration of imager and spectrograph (including web plots) Autoguider control [2 wks] Autoguider output [1 wk] flux variations --> photometric no not mean seeing / seeing distribution Environmental inputs (log in database or use header was database) [1 - 4 wks] CSO H2O column Mauna Loa extinction local wind speed and direction humidty temperature (inside dome and outside) CCD temperature Cryotiger monitor/alarm [1 - 2 wks] (total 21 - 33 wks) ------------------------------------------------------------------------------- Follow-up Spectroscopy ------------------------------------------------------------------------------- Processing of SNIFS spectroscopic data Standard spectral reduction Point-source extraction Galaxy extraction point-source spectral classification SN redshift SN spectral analysis Galaxy spectral classification Galaxy redshift Galaxy spectral analysis Generation of synthetic photometry Flexure monitoring (using arc lines; store and plot) Lightcurve fitting with projection (and projection uncertainty) (8 - 12 wks) ------------------------------------------------------------------------------- Pipeline integration and testing ------------------------------------------------------------------------------- Needs to be detailed [12 - 24 wks] drafted by Greg Aldering, Feb 15, 2001