August 20, 1991
MEMORANDUM
Subject: Kamine Development Corporation's (KDC) Request for a
Prevention of Significant Deterioration (PSD) Innovative Control
Technology Waiver
From: Ed Lillis, Chief
Permits Program Branch (MD-15)
To: Kenneth Eng, Chief
Air Compliance Branch (2AWM-AC)
This is in response to a request from Clara Poffenberger, Office
of Air Quality Planning and Standards, Stationary Source Compliance
Division to review the PSD innovative control technology waiver
(ICT) requested by KDC. The review focused on three issues: whether
an ICT waiver is applicable for the proposed control technology,
whether an ICT waiver should be granted to each of three KDC projects,
and comments on the draft ICT waiver.
The KDC is proposing to construct the following cogeneration projects
in the State of New York:
Syracuse Cogeneration Project (KDC No. 105)
Beaver Falls Cogeneration Project (KDC No. 106)
South Corning Cogeneration Project (KDC No. 108)
All three of these facilities will be of similar design and a
Siemens V64.3 gas fired turbine will be installed at each facility.
The KDC has requested an ICT waiver that would allow oxides of
nitrogen (NOx) emissions from the gas fired turbines to be controlled
by dry low NOx combustion technology instead of using selective
catalytic reduction (SCR). The goal of the proposed dry low NOx
combustion technology is to achieve a NOx emission limit of 9 parts
per million (ppm). For the majority of turbines, a 9 ppm NOx emission
limit can only be achieved by using SCR. The one exception is the
Siemens V84.2 model turbine which can be purchased with a guaranteed
NOx emission limit of 9 ppm by using dry low NOx control technology.
San Diego Gas and Electric has an option with Siemens for a V84.2
model turbine that will comply with a 9 ppm NOx emission limit.
However, the turbine has not been installed. Therefore, this type
of control technology has not been demonstrated on either the V84.2
or V64.3 model.
As you know, an ICT waiver determination is made on a case- by-case
basis. In order for a technology to qualify for an ICT waiver it
must met both the provisions of 40 Code of Federal Regulations (CFR)
52.21(b)(19) and Agency policy or, where appropriate, the applicable
State Implementation Plan definition.
"Innovative control technology" is defined as any system of air
pollution control that has not been adequately demonstrated in practice,
but would have a substantial likelihood of achieving greater continuous
emissions reduction than any control system in current practice
or of achieving at least comparable reductions at lower cost in
terms of energy, economics, or nonair quality environmental impacts.
Thus, the control technology proposed by KDC qualifies for an ICT
waiver because the dry low NOx emission control technology has not
been demonstrated and, if successful, will achieve comparable emission
reductions to that of SCR at a lower cost in terms of economics.
The request for an ICT waiver for each of the three KDC projects
is unique. In the past, only a limited number of ICT waivers for
a specific control technology have been approved and these waivers
were applicable to only the facility demonstrating the control technology.
Unless each turbine is to be permitted at approximately the same
time it is not clear that each of the projects should be given the
waiver. The rationale for this determination is that once a waiver
for a source has been approved the subsequent applications are no
longer "innovative."
There are unique characteristics about this particular situation
however that may warrant granting an ICT waiver for the additional
two projects. These characteristics are: KDC owns all three projects
and all of the projects will be permitted by the same agency; the
use of the same control technology at all three projects should
reduce the amount of time required to demonstrate the technology,
and most importantly the projects are proposed to be constructed
at approximately the same time. Consequently, approval of an ICT
waiver for the remaining two projects is possible provided that
each additional project is constructed on a schedule coinciding
with the construction and testing of the first permitted project.
The following are specific comments on the draft ICT waiver for
KDC. The duration of the waiver should be definite. As written,
the waiver may last from 2 to 4 years. Unless there are source specific
conditions we are not aware of, it is recommended that the waiver
be granted for 2 years. The rationale is that the various technologies
(e.g., optimum pilot fuel flow, steam injection into the combustor,
water or steam injection into the pilot flame, and combinations
of the above) that comprise the dry low NOx control technology have
already been identified by Siemens. In addition, KDC will have three
sites at which the various technologies can be tested. Therefore
it should not require 4 years to test these various technologies
or any combination thereof. It is also recommended that KDC be required
to provide a detailed test program describing when, where and which
technologies will be tested. Based on its experience with the V84.2
model, Siemens should already have an idea of which and in what
order it wants to test the above mentioned technologies. In addition,
the KDC should submit written periodic reports (e.g. at least an
annual report) outlining the progress made to achieve the 9 ppm
NOx emission limit. Furthermore, it is recommended that the number
and duration of allowable NOx emission excursions above 25 ppm be
specified.
Lastly, we recommend that the KDC should be specifically required
to design the heat recovery steam generator (HRSG) such that it
can be readily retrofitted in the event that the ICT does not meet
the permitted emission limit. This requirement would drastically
reduce the time and cost of retrofitting the turbines if the dry
low NOx control technology proved unsatisfactory. The additional
capital cost of designing and purchasing a HRSG with additional
space should be minimal, especially when compared to retrofit costs.
Also, the additional space may provide a small increase in the efficiency
of the cogeneration facility without the SCR installed.
If you have any questions, please do not hesitate to contact Larry
Elmore at FTS 629-5433.