Skip common site navigation and headers
United States Environmental Protection Agency
Technology Transfer Network
New Source Review
Begin Hierarchical Links EPA Home > Air & Radiation > TTNWeb - Technology Transfer Network > New Source Review > Bulletins and Memos > PSD Abstracts and Memos > PSD Determination Cabot Corporation - Fuel Conversion 4.2 End Hierarchical Links

 

March 20, 1978 PSD Determination Cabot Corporation - Fuel Conversion 4.2

Under PSD regulations proposed November 3, 1977 a fuel conversion may or may not be considered a "major modification" and thus subject to PSD review. It is subject to PSD if: the source was capable, prior to 1/6/75, of burning the alternative fuel without requiring modifications, or the design for the source showed a clear indication of the intent to switch fuels, or the source obtained, prior to 3/1/78, all final preconstruction permits required by the applicable SIP and began physical on-sit construction prior to 9 months after the date of promulgation of the final PSD regulations.

View Entire Document
Download Entire Document in PDF Format

 

Begin Site Footer

Site Index | File Utilities

 
Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us