March 20, 1978 PSD Determination
Cabot Corporation - Fuel Conversion 4.2
Under PSD regulations proposed November
3, 1977 a fuel conversion may or may not
be considered a "major modification" and
thus subject to PSD review. It is
subject to PSD if: the source was
capable, prior to 1/6/75, of burning the
alternative fuel without requiring
modifications, or the design for the
source showed a clear indication of the
intent to switch fuels, or the source
obtained, prior to 3/1/78, all final
preconstruction permits required by the
applicable SIP and began physical on-sit
construction prior to 9 months after the
date of promulgation of the final PSD
regulations.