Skip common site navigation and headers
United States Environmental Protection Agency
Technology Transfer Network
New Source Review
Begin Hierarchical Links EPA Home > Air & Radiation > TTNWeb - Technology Transfer Network > New Source Review > Bulletins and Memos > PSD Abstracts and Memos > Final Determinations Regarding the Applicability of the Clean Air Act's NSPS and PSD Requirements to the Proposed Life Extension Project at the Port Washington Steam Electric Generating Station 4.38 End Hierarchical Links

 

October 14, 1988 Final Determinations Regarding the Applicability of the Clean Air Act's New Source Performance Standards (NSPS) and Prevention of Significant Deterioration (PSD) Requirements to the Proposed Life Extension Project at the Port Washington Steam Electric Generating Station 4.38

This is the final applicability determination regarding the proposed Port Washington steam electric generating station. The renovations constitute physical changes for PSD purposes, and do not come within the exclusions for routine maintenance, repair, replacement; or for production rate or hours of operation. The renovations will result in a significant net increase in emissions of several pollutants for PSD and NSPS purposes, and are, therefore, subject to both PSD and NSPS requirements, unless the project is reconfigured.
Notebook Entries: 2.29

View Entire Document
Download Entire Document in PDF Format

 

Begin Site Footer

Site Index | File Utilities

 
Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us