Skip common site navigation and headers
United States Environmental Protection Agency
National Risk Management Research Laboratory
Begin Hierarchical Links EPA Home > Research & Development > National Risk Management Research Laboratory > EPA 540/MR-93/527 End Hierarchical Links

EPA 540/MR-93/527

Augmented In Situ Subsurface Bioremediation Process™ BIO-REM, Inc.

This document is available in the Adobe Acrobat PDF Format.

Click here for information about Portable Document File (PDF) Formats.

or

Click here to directly download the Acrobat Reader.

(To view the PDF, it is recommended that you use the latest version of Acrobat Reader.)

 


Augmented In Situ Subsurface Bioremediation Process™ BIO-REM, Inc.(17K)


ABSTRACT

Augmented In Situ Subsurface Bioremediation Process™
BIO-REM, Inc.
Demonstration Bulletin
EPA 540/MR-93/527
November 1993

The Augmented In Situ Subsurface Bioremediation Process™ developed by BIO-REM, Inc., uses microaerophilic bacteria and micronutrients (H-10) and surface tension depressants/penetrants for the treatment of hydrocarbon contaminated soils and groundwater. The bacteria utilize hydrocarbons as electron acceptors and can propagate under very low oxygen tensions thus eliminating the need for additional oxygen sources as well as nutrient treatment. The contaminants are hardy and can thrive over a wide temperature range. Application of the technology is adaptable to site specific situations. The Bio-Rem process was evaluated on JP-4 jet fuel contaminated soils at a former Liquid Fuels Storage Area on Williams Air Force Base (AFB), Phoenix, Arizona, between March 1992 and June 1993. Testing involved the preparation and delivery of 100,000 gallons of H-10 slurry using groundwater from the site to the subsurface soil via a network of over 315 open soil borings. The treatment area was monitored via periodic soil sampling. Samples were analyzed for BTEX, TRPH, and TPH utilizing EPA SW846 methodologies. The developers claimed that organic contaminants in soils between the depths of four to twenty-five feet would be reduced to less than the project specific cleanup levels.

 Back to SITE Home Page

Posted February 26, 1999

 

Office of Research & Development | National Risk Management Research Laboratory

 
Begin Site Footer

EPA Home | Privacy and Security Notice | Contact Us