|
|
Test/QA Plans
ETV Test/QA plans are developed by a verification partner for each individual test of a technology or technology
class. Therefore, the Test/QA plan may include more than one technology. The Test/QA plan provides the
experimental approach with clearly stated test objectives and associated quality objectives for the related
measurements. The Test/QA plan may incorporate or reference existing generic verification protocols or provide
the basis for refining draft protocols.
You will need Adobe Acrobat Reader, available as a free download, to view the files in this list. See EPA's PDF page to learn more about PDF, and for a link to the free Acrobat Reader. |
ETV Advanced Monitoring Systems Center |
Advanced Monitoring Systems - Air |
Test/QA Plan for Verification of Ambient Ammonia Monitors at Animal Feeding Operations
Test/QA Plan for Verification of Portable Gaseous Emission Analyzers
Test/QA Plan for Verifications of On-Board Vehicle Emission Monitors
Test/QA Plan for Verifications of Continous Emission Monitors for Mercury
Test/QA Plan for Verifications of Ambient Fine Particle Monitors
Test/QA Plan for Verifications of Optical Path Monitors
Test/QA Plan for Verifications of NO/NO2 Emission Analyzers
|
Advanced Monitoring Systems - Water |
Test/QA Plan for Verification of Rapid PCR Technologies
Test/QA Plan for Verification of Test Kits for Detection of Atrazine
in Water
Test/QA Plan for Verification of Portable Analyzers for Detection
of Cyanide in Water
Test/QA Plan for Verification of Rapid Toxicity Technologies
Test/QA Plan for Long-Term Deployment of Multi-Parameter Water
Quality Probes/Sondes
Test/QA Plan for Verification of Portable Analyzers
Test/QA Plan for Verification of On-line Turbidimeters
|
Advanced Monitoring Systems - Site Characterization and Monitoring Technologies Pilot |
Verification Test Plan for the Evaluation of Field Portable Measurement Technologies for Lead in Dust Wipes
Technology Demonstration Plan for the Evaluation of Polychlorinated Biphenyl (PCB) Field Analytical Techniques
Technology Demonstration Plan for the Evaluation of Explosives Field Analytical Techniques
Ground Water Sampling Technologies Verification Test Plan
Decision Support Software Technology Demonstration Plan
Demonstration Plan for Wellhead Monitoring Technologies
August 1997
Demonstration Plan for the Evaluation of Field-transportable Gas Chromatograph/Mass Spectroscopy Technologies
September 1995
Demonstration Plan for the Evaluation of Laser Induced Breakdown Spectroscopy
August 1995
Laser Induced Fluorometry/Cone Penetrometer Technology Demonstration Plan at the Hydrocarbon National Test Site
May 1995
Development of the following demonstration plans, and associated demonstrations, were supported by the Superfund Innovative Technology Evaluation (SITE) Program:
Demonstration Plan for the Evaluation of Soil/Soil Gas Technologies
August 1997
Superfund Innovative Technology Evaluation Plan for the Evaluation of Field Portable X-Ray Fluorescence Technologies
March 1995
|
ETV Air Pollution Control Technology Center |
Test/QA Plan for Testing of Dust Suppressant Products at Maricopa County, Arizona
Rev
2 (October 2, 2002)
Test/QA Plan for Testing of Dust Suppressant Products at Fort Leonard Wood, Missouri
Rev
2 (October 2, 2002)
Test/QA Plan for the Verification Testing of Diesel Exhaust Catalysts, Particulate Filters, and Engine Modification
Control Technologies for Highway and Nonroad Use Diesel Engines
April 8, 2002
Test/QA Plan for the Verification
Testing of Catalytica Combustion Systems, Inc., XONON Flameless
Combustion System
July
5, 2000
Test/QA Plan for the Verification Testing of Baghouse Filtration
Products
December
17, 1999
Test/QA Plan for Paint Overspray Arrestors
February
11, 1999
Quality Assurance Project Plan: Verification Testing of Emulsified
Oils
June
5, 1997
|
ETV Greenhouse Gas Technology Center |
Air/Fuel Ratio Controllers |
Test and QA Plan for the MIRATECH Corporation, GECOTM 3001 Air/Fuel Ratio Controller
February 2001
|
Compressor Leak Mitigation |
Test and QA Plan for A&A; Environmental Seals, Inc., Seal Assist System (SAS)
February 1999
Test and QA Plan for the C. Lee Cook Division, Dover Corporation, Static Pac® System
August 1999
Test and QA Plan for the France Compressor Products, Emissions Packing
July 1999
|
Diesel Fuel Use Technologies |
Test and QA Plan for the JCH Fuel Solutions, Inc., JCH Enviro Automated Fuel Cleaning and Maintenance System
July 2001
|
Distributed Generation/Combined Heat and Power - Renewable Fuels |
Test and QA Plan for Electric Power and Heat Production
Using Renewable Biogas at a Dairy Farm (PDF 721 KB, 97
pages)
March
2004This
pdf is not 508 compliant but will be made compliant soon.
|
Fuel Cells |
Test and QA Plan for Electric Power and Heat Generation
Using the UTC PC25 Fuel Cell Power Plant and Anaerobic Digester
Gas (PDF 2.3 MB, 108 pages)
January 2004 This pdf is not 508 compliant
but will be made compliant soon.
Test and QA Plan for Residential Electric Power Generation
Using the Plug Power SU1 Fuel Cell System
March 2003
Demonstration of Fuel Cells to Recover Energy From Landfill
Gas. Phase III Demonstration Tests, Phase IV Guidelines and
Demonstrations, and Volume 2 Appendices. (EPA/600/K-98/002b)
January 1998
|
Microturbines and Microturbine Combined Heat and Power |
Test and QA Plan for the Combined Heat and Power at a Commercial Supermarket
Capstone 60 kW MicroTurbineTM
November 2002
Test and QA Plan for the Honeywell Power Systems, Inc., Parallon 75 kW Turbogenerator
November 2000
Test and QA Plan for the Mariah Energy Corporation, Heat PlusPowerTM System
March 2001
Test and QA Plan for the NYSERDA Ingersoll-Rand Energy Systems IR PowerWorks 70 kW Microturbine System
July 2002
Test and QA Plan for the Swine Waste Electric Power and Heat Production Systems:
Capstone MicroTurbineTM and Martin Machinery Internal Combustion Engine
November 2002
|
Monitoring Systems |
Test and QA Plan for the ANR Pipeline Company, Parametric Emissions Monitoring System (PEMS)
July 1999
Test and QA Plan for the KMC Controls, Inc., SLE-1001 Sight Glass Monitor
July 2001
|
Natural Gas Dehydration Technology |
Test and QA Plan for The Engineered Concepts, Inc., Quantum Leap Dehydrator
June 2002
| Pressure Release Valves |
Test and QA Plan for The Protectoseal Company's Pin-TechTM Pressure Relief Valve
August 1999
| Rear Axle Gear Lubricant |
Test and QA Plan for ConocoPhillips Fuel-Efficient High-Performance SAE 75W90 Rear Axle Gear Lubricant
March 2003
|
Vapor Recovery Systems |
Test and QA Plan for the COMM Engineering, USA, Environmental Vapor Recovery Unit (EVRUTM)
April 2002
|
ETV Drinking Water Systems Center |
Arsenic Removal |
Ion Exchange for Removal of Arsenic
April
2002
Coagulation and/or Co-Precipitation and Filtration for Removal
of Arsenic
September 2003
Adsorptive Media Processes for Removal of Arsenic
September 2003
Kinetico CPS100CPT Coagulation and Filtration System for the Removal of Arsenic from Drinking Water
April 2000
|
Removal of Precursors to Disinfection By-Products |
Membrane Processes for the Removal of Precursors to Disinfection
By-Products
September
2003
Granular Activated Carbon Adsorption of Disinfection By-Products
Precursors
April
2002
|
Removal of Inorganic Constituents |
Reverse Osmosis or Nanofiltration for Removal of Inorganic Chemical
Contaminants
April
2002
Electrodialysis or Electrodialysis Reversal for Removal of Inorganic
Chemical and Radionuclide Contaminants
April
2002
|
Physical Removal of Microbiological and Particulate Contaminants |
Membrane Filtration for Removal of Microbiological and Particulate
Contaminants
April 2002
Coagulation and Filtration for Removal of Microbiological and
Particulate Contaminants
April 2002
Bag Filters and Cartridge Filters for Removal of Microbiological
and Particulate Contaminants
April 2002
Precoat Filtration for Removal of Microbiological and Particulate Contaminants
April 2002
Backwashable Depth Filtration for Removal of Microbiological
and Particulate Contaminants
April 2002
|
Inactivation of Microbiological Contaminants |
Ozone and Advanced Oxidation Processes for Inactivation of
Microbiological Contaminants
January
2003
On-Site Generation of Halogen Disinfectants for Inactivation
of Microbiological Contaminants
January
2003
Ultraviolet Radiation Technologies for Inactivation of Microbiological
Contaminants
January
2003
Trojan UVSwift Ultraviolet System
March 2001
|
Physical Chemical and Biological Removal of Nitrate |
Reverse Osmosis and Nanofiltration for Removal of Nitrate
April 2002
Ion Exchange for Nitrate Contaminant Removal
April 2002
Heterotrophic Biological Denitrification for Removal of Nitrate
April 2002
|
Removal of Radioactive Chemical Contaminants |
Cation and Anion Exchange Technologies for Removal of Radium
and Uranium
April
2002
Nanofiltration Membrane Processes for Removal of Radium
and Uranium
April
2002
Air-Stripping Technologies for Removal of Radon
April
2002
|
Removal of Synthetic Organic Chemical (SOC) Contaminants |
Membrane Filtration Processes for Removal of Synthetic Organic Chemical Contaminants
April 2002
Ozone and Advanced Oxidation Processes for SOC Oxidation
April 2002
Removal of Synthetic Organic Chemicals (SOCs) by Adsorptive Media
July 7, 2000
|
Volatile Organic Chemical (VOC) Removal |
Air Stripping Technologies for Removal of Volatile Organic Chemicals
April 2002
|
ETV Water Quality
Protection Center |
Source Water Protection Technologies |
Test Plan for the Suntec Environmental UV Disinfection System
for Secondary Effluent Applications - Version 3.0
February 2003
(PDF - 69 pp., 946 KB)
Test Plan for the Aquionics Inc. UV Disinfection System for
Reuse Applications - Version 3.2
December 2002
(PDF - 90 pp., 1.1 MB)
Test Plan for the Ondeo Degremont Inc. UV Aquaray HO Disinfection
System for Reuse Applications - Version 3.2
December 2002
(PDF - 93 pp., 1.2 MB)
Test Plan for the Verification of Technologies for Separation
of Manure Solids From Flushed Swine Waste
May 29, 2002
updated version (PDF - 29 pp., 349 KB)
Test Plan for Hydro Compliance Management, Inc. Hydro-Kleen™
Filtration System
February
2002 (PDF, 84 pp., 660 KB)
Test Plan for the Bio-Microbics RetroFAST 0.375 Under the
U.S. Environmental Protection Agency's Environmental Technology
Verification Program at the Mamquam Wastewater Technology Test
Facility
September 4,
2001 (PDF - 36 pp., 248 KB)
Test Plan for the Massachusetts Septic System Test Center
for Verification Testing of SeptiTech Nutrient Reduction Technology
August
28, 2001 - Final Draft (PDF - 26 pp., 182 KB)
Test Plan for the Dental Recycling North America Mercury
Removal System
June 2001
(PDF - 73 pp., 380 KB)
Test Plan for the Massachusetts Septic System Test Center
for Verification Testing of AWT Bioclere Nutrient Reduction
Technology
February
13, 2001 - Final Draft (PDF - 28 pp., 184 KB)
Test Plan for the Massachusetts Septic System Test Center
for Verification Testing of Waterloo Biofilter® Nutrient
Reduction Technology
February
12, 2001 - Final Draft (PDF - 27 pp., 103 KB)
Test Plan for the Massachusetts Septic System Test Center
for Verification Testing of F.R. Mahoney Amphidrome™ Model
"Single Family Unit" Nutrient Reduction Technology
January
22, 2001 - Final (PDF - 28 pp., 199 KB)
|
Wet Weather Flow Technologies |
Test Plan for Induction Mixers Manufactured by the U.S. Filter/Stranco
for High Rate Disinfection of Wet Weather Flows
October
2000 (PDF - 79 pp., 4.8 MB)
Test Plan for Induction Mixers Manufactured by the Mastrrr
Company for High Rate Disinfection of Wet Weather Flows
August 2000
(PDF - 55 pp., 5.2 MB)
|
|
ETV Building Decontamination Technology Center |
Test/QA Plan for Verification of Hydrogen Peroxide Vapor Technologies for Decontaminating Indoor Surfaces
Contaminated with Biological or Chemical Agents
July 21, 2003
(PDF - 70 pp., 3.9 MB)
|
ETV Safe Buildings Monitoring and Detection Technology Effort |
Test/QA Plan for Verification of Surface Acoustic Wave (SAW) and Combined SAW/Electrochemical Detectors for
Detection of Chemicals and Chemical Agents in Buildings
April 2004
(PDF - 71 pp., 432 KB)
This pdf is not 508 compliant but will be made compliant soon.
Test/QA Plan for Verification of Portable Ion Mobility Spectrometers for Detection of Chemicals and Chemical
Agents in Buildings
July 2003
(PDF - 73 pp., 447 KB)
This pdf is not 508 compliant but will be
made compliant soon.
|
ETV Safe Buildings Air Filtration and Cleaning
Technology Effort |
Test Plan for Biological Testing of General Ventilation Filters
September 24,
2003
|
ETV P2, Recycling, and Waste Treatment Pilots |
P2 Innovative Coatings and Coating Equipment Pilot |
Allied PhotoChemical KrohnZone TM 7014 - Testing and Quality Assurance Project Plan (TQAPP)
January
27, 2003
Anest Iwata LPH400-LV HVLP Spray Gun - Testing and Quality Assurance Project Plan (TQAPP)
April
15, 2003
Evermore Paints and Coatings Formula 5 Coating - Testing and Quality Assurance Project Plan (TQAPP)
August 4, 2000
Laser TouchTM Beta Model - Testing and Quality Assurance Project Plan (TQAPP)
September 16, 1999
Sharpe Platinum 2013 Spray Gun - Testing and Quality Assurance Project Plan (TQAPP)
February 25, 1999
ITW DeVilbiss JGHV-531-46FF HVLP Spray Gun - Testing and Quality Assurance Project Plan (TQAPP)
December 11, 1998
ITW DeVilbiss FLG-631-318 HVLP Spray Gun - Testing and Quality Assurance Project Plan (TQAPP)
December 15, 1998
ITW DeVilbiss GTI-600G HVLP Spray Gun - Testing and Quality Assurance Project Plan (TQAPP)
December 15, 1998
|
P2 Metal Finishing Technologies Pilot |
Verification Test Plan, Evaluation of Lobo Liquids Rinse Water Recovery System
January 8, 2002
Verification Test Plan, Evaluation of the KCH Services, Inc. Automated Covered Tank System for Energy Conservation (ACTSEC)
November 7, 2001
Verification Test Plan, Evaluation of the Kaselco Electrocoagulation Treatment System
November 2, 2001
Verification Test Plan, Evaluation of the Hadwaco MVR Evaporator for the Metal Finishing Industry
September 20, 2001
Verification Test Plan, Evaluation of Hydrometrics, Inc. High Efficiency Reverse Osmosis (HEROTM) Industrial Wastewater Treatment Systems
June 15, 2001
Verification Test Plan, Evaluation of Davis Technologies International Corporation Industrial Wastewater Treatment Plant for the Metal Finishing Industry
March 1, 2001
Verification Test Plan, Evaluation of the MART Corporation EQ-1TM Wastewater Processing System
January 5, 2001
Verification Test Plan, Evaluation of USFilter RETEC® Separated Cell Purification of Chromic Acid Anodize Bath Solution
September 13, 2000
Verification Test Plan, Evaluation of USFilter Membralox® SilverbackTM Model 900 Alkaline Cleaner Recycling System
April 4, 2000
Verification Test Plan, Evaluation of BioClean USA, LLC Biological Degreasing System for the Recycling of Alkaline Cleaners
February 4, 2000
|
P2, Recycling and Waste Treatment Systems Pilot |
Final Technology Evaluation Plan for Cooper Power Systems, Inc., Envirotemp® FR3TM Insulating Dielectric Fluid
July 12, 2001
Final Technology Evaluation Plan ABB, BIOTEMP® Dielectric Fluid
April 9, 2001
Lithium Metatungstate (LMT) Verification WorkPlan
September 1, 2000
Hydromatix Technology Evaluation Workplan
November 1, 2000
Technology Evaluation Field Test Plan for Katec Inc., Aerosolv Aerosol Can Recycling System
July 28,1998
Technology Evaluation Workplan for the Rayovac Corporation Renewal® Rechargeable Alkaline Household Batteries Verification Report and Workplan
July 21, 1998
Technology Evaluation Workplan for the Smart Sonic Corporation, Smartsonic Aqueous Cleaning Systems
April 23, 1998
|
ETV Indoor Air Products Pilot |
Commercial Furniture |
Quality Assurance Project Plan for Emissions of VOCs and Aldehydes From Commercial Furniture
September 30, 1999
Test Plan for Emissions of VOCs and Aldehydes From Commercial Furniture
September 30, 1999
|
Ventilation Air Filters |
Quality Assurance Project Plan for General Ventilation Filters
September 30, 1999
Test Plan for General Ventilation Filters
September 30, 1999
|
|
|
|
|
|
|
|