Area |
Chapter |
Title |
Issue Date |
CN Number |
IP |
Inspection
Procedures |
IP |
30800 |
Initial Management Meeting Materials Licensees |
10/01/76 |
76-026 |
IP |
35002 |
Early Site Permit Pre-Docketing Quality Assurance Controls Meeting |
05/29/03 |
03-018 |
IP |
35004 |
Pre-Docketing Early Site Permit Quality Assurance Controls Inspection |
05/29/03 |
03-018 |
IP |
35006 |
Post-Docketing Early Site Permit Quality Assurance Controls Inspection |
05/29/03 |
03-018 |
IP |
35012 |
Early Site Permit Quality Assurance Controls Assessment and Conclusion |
05/29/03 |
03-018 |
IP |
35301 |
Preoperational Testing - Quality Assurance |
08/06/03 |
03-025 |
IP |
35501 |
QA for the Startup Test Program |
01/20/84 |
84-004 |
IP |
35960 |
QA Program Evaluation of Engineering Organization |
10/01/82 |
94-015 |
IP |
36100 |
10 CFR Part 21 Inspection at Nuclear Power Reactors |
08/30/91 |
91-011 |
IP |
36800 |
Organization |
08/12/92 |
92-010 |
IP |
36801 |
Organization, Management, and Cost Controls at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
37001 |
10 CFR 50.59 Safety Evaluation Program |
06/24/98 |
98-010 |
IP |
37550 |
Engineering |
11/15/99 |
99-018 |
IP |
37551 |
Onsite Engineering |
06/24/98 |
98-010 |
IP |
37801 |
Safety Reviews, Design Changes, and Modifications at Permanently
Shutdown Reactors |
08/11/97 |
97-012 |
IP |
38703 |
Commercial Grade Dedication |
04/08/96 |
96-007 |
IP |
40001 |
Resolution of Employee Concerns |
06/03/97 |
97-006 |
IP |
40002 |
Inspections to Review Allegations |
06/28/02 |
02-024 |
IP |
40500 |
Effectiveness of Licensee Process to Identify, Resolve, and Prevent
Problems |
05/03/99 |
99-008 |
IP |
40801 |
SelfAssessment, Auditing, and Corrective Action at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
41500 |
Training and Qualification Effectiveness |
06/13/95 |
95-007 |
IP |
42001 |
Emergency Operating Procedures |
06/28/91 |
91-009 |
IP |
42700 |
Plant Procedures |
11/15/95 |
95-015 |
IP |
43001 |
Reactive Inspection of Nuclear Vendors |
10/11/94 |
94-018 |
IP |
45051 |
Geotechnical/Foundation Activities Procedure Review |
05/29/03 |
03-018 |
IP |
49001 |
Inspection of Erosion/Corrosion Monitoring Programs |
12/11/98 |
98-019 |
IP |
49055 |
Reactor Coolant Pressure Boundary PIPing I Review of Quality Records |
08/16/92 |
82-007 |
IP |
50001 |
Steam Generator Replacement Inspection |
09/06/00 |
00-015 |
IP |
50002 |
Steam Generators |
12/31/96 |
96-024 |
IP |
50090 |
Pipe Support and Restrain Systems |
08/06/03 |
03-028 |
IP |
50100 |
Heating, Ventitaling, and Air Conditioning Systems |
08/06/03 |
03-028 |
IP |
51053 |
Electrical Components and Systems - Work Observation |
08/06/03 |
03-028 |
IP |
51055 |
Electrical Components and Systems - Record Review |
08/06/03 |
03-028 |
IP |
51061 |
Electrical Cable - Procedure Review |
08/06/03 |
03-028 |
IP |
52001 |
Digital Retrofits Receiving Prior Approval |
03/02/98 |
98-003 |
IP |
52002 |
Digital Retrofits Not Receiving Prior Approval |
03/02/98 |
98-003 |
IP |
55050 |
Nuclear Welding General Inspection Procedure |
06/20/83 |
83-006 |
IP |
55100 |
Structural Welding General Inspection Procedure |
06/20/83 |
83-006 |
IP |
57050 |
Nondestructive Examination Procedure Visual Examination Procedure
Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57060 |
Nondestructive Examination Procedure Liquid Penetrant Examination
Procedure Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57070 |
Nondestructive Examination Procedure Magnetic Particle Examination
Procedure Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57080 |
Nondestructive Examination Procedure Ultrasonice Examination Procedure
Review/Work Observation/Record Review |
03/09/99 |
99-003 |
IP |
57090 |
Nondestructive Examination Procedure Radiographic Examination Procedure
Review/Work Observation/Record Review |
06/14/93 |
93-005 |
IP |
60705 |
Preparation for Refueling |
07/27/95 |
95-009 |
IP |
60710 |
Refueling Activities |
07/27/95 |
95-009 |
IP |
60801 |
Spent Fuel Pool Safety at Permanently Shutdown Reactors |
08/11/97 |
97-012 |
IP |
60851 |
Design Control of ISFSI Components |
08/08/03 |
03-030 |
IP |
60852 |
ISFSI Component Fabrication by Outside Fabricators |
08/08/03 |
03-030 |
IP |
60853 |
OnSite Fabrication of Components and Construction of an ISFSI |
02/11/04 |
04-006 |
IP |
60854 |
Preoperational Testing of an ISFSI |
03/28/02 |
02-012 |
IP |
60854.1 |
Preoperational Testing of an ISFSI |
02/02/04 |
04-003 |
IP |
60855 |
Operation of an ISFSI |
03/28/02 |
02-012 |
IP |
60855.1 |
Operation of an ISFSI |
02/02/04 |
04-003 |
IP |
60856 |
Review of 10 CFR 72.212(b) Evaluations |
04/02/03 |
03-008 |
IP |
60856.1 |
Review of 10 CFR 72.212(b) Evaluations |
02/02/04 |
04-003 |
IP |
60857 |
Review of 10 CFR 72.48 Evaluations |
03/09/01 |
01-007 |
IP |
61705 |
Calibration of Nuclear Instrumentation Systems |
05/12/86 |
86-025 |
IP |
61706 |
Core Thermal PowerEvaluation |
07/14/86 |
86-036 |
IP |
61707 |
Determination of ReactorShutdown Margin |
10/11/85 |
85-031 |
IP |
61708 |
Isothermal and ModeratorTemperature CoefficientDeterminations |
10/11/85 |
85-031 |
IP |
61709 |
Total Power Coefficient of Reactivity at Pressurized Water Reactors |
07/14/86 |
86-036 |
IP |
61710 |
Control Rod Worth Measurements |
10/11/85 |
85-031 |
IP |
61715 |
Verification of Containment Integrity |
12/23/86 |
86-060 |
IP |
61720 |
Containment Local Leak Rate Testing |
10/03/85 |
85-030 |
IP |
61726 |
Surveillance Observations |
06/24/98 |
98-010 |
IP |
61728 |
Independent Measurement of RCS Leak Rates for a PWR |
01/01/84 |
84-002 |
IP |
62002 |
Inspection of Structures, Passive Components, and Civil Engineering
Features at Nuclear Power Plants |
12/31/96 |
96-024 |
IP |
62003 |
Inspection of Steel and Concrete Containments at Nuclear Power Plants |
06/11/97 |
97-008 |
IP |
62700 |
Maintenance Implementation |
04/04/00 |
00-005 |
IP |
62706 |
Maintenance Rule |
12/13/00 |
00-028 |
IP |
62707 |
Maintenance Observation |
11/15/99 |
99-018 |
IP |
62708 |
MotorOperated Valve Capability |
09/12/00 |
00-018 |
IP |
62709 |
Configuration Risk Assessment and Risk Management Process |
12/28/00 |
00-029 |
IP |
62710 |
PowerOperated Gate Valve
Pressure Locking and Thermal Binding |
01/17/02 |
02-001 |
IP |
62801 |
Maintenance and Surveillance at Permanently Shutdown Reactors |
08/11/97 |
97-012 |
IP |
64704 |
Fire Protection Program |
06/24/98 |
98-010 |
IP |
69001 |
Class II NonPower Reactors |
02/03/04 |
04-004 |
IP |
69002 |
Class III Research and Test Reactors |
02/03/04 |
04-004 |
IP |
69003 |
Class I NonPower Reactor Operator Licenses, Requalification, and
Medical Activities |
02/03/04 |
04-004 |
IP |
69004 |
Class I NonPower Reactor Effluent and Environmental Monitoring |
02/03/04 |
04-004 |
IP |
69005 |
Class I NonPower Reactor Experiments |
02/03/04 |
04-004 |
IP |
69006 |
Class I Research and Test Reactors Organization and Operations and
Maintenance Activities |
02/03/04 |
04-004 |
IP |
69007 |
Class I Research and Test Reactor Review and Audit and Design Change
Functions |
02/03/04 |
04-004 |
IP |
69008 |
Class I Research and Test Reactor Procedures |
02/03/04 |
04-004 |
IP |
69009 |
Class I Research and Test Reactor Fuel Movement |
02/03/04 |
04-004 |
IP |
69010 |
Class I Research and Test Reactor Surveillance |
02/03/04 |
04-004 |
IP |
69011 |
Class I Research and Test Reactor Emergency Preparedness |
02/03/04 |
04-004 |
IP |
69012 |
Class I Research and Test Reactors Radiation Protection |
02/03/04 |
04-004 |
IP |
69013 |
Research and Test Reactor Decommissioning |
02/03/04 |
04-004 |
IP |
70304 |
Engineered Safety Features Test - Preoperational Test Procedure
Review |
08/06/03 |
03-028 |
IP |
70307 |
Containment Integrated Leak Rate Test Procedure Review |
03/07/86 |
86-013 |
IP |
70313 |
Containment Integrated Leak Rate Test |
10/03/85 |
85-036 |
IP |
70323 |
Containment Leak Rate Test Results Evaluation |
10/03/85 |
85-030 |
IP |
70370 |
Testing PIPing Support and Restraint Systems |
03/07/86 |
86-013 |
IP |
71001 |
Licensed Operator Requalification Program Evaluation |
07/23/98 |
98-011 |
IP |
71002 |
License Renewal Inspection |
09/18/00 |
00-019 |
IP |
71003 |
Post-Approval Site Inspection For License Renewal) |
12/09/02 |
02-044 |
IP |
71004 |
Power Uprate |
07/09/02 |
02-027 |
IP |
71005 |
Inspector Review of Licensing-Related Information |
08/05/03 |
03-027 |
IP |
71007 |
Reactor Vessel Head Replacement Inspection |
07/10/03 |
03-024 |
IP |
71111 |
Reactor Safety-Initiating Events, Mitigating Systems,
Barrier Integrity |
05/06/03 |
03-015 |
IP |
71111.DS |
Safety System Design and Performance Capability |
05/06/03 |
03-015 |
IP |
71111.EP |
Equipment Availability, and Functional Capability |
05/06/03 |
03-015 |
IP |
71111.HS |
Heat Sink Performance |
05/06/03 |
03-015 |
IP |
71111.ST |
Post-Maintenance and Surveillance Testing |
05/06/03 |
03-015 |
IP |
71111.01 |
Adverse Weather Protection |
04/13/04 |
04-008 |
IP |
71111.02 |
Evaluation of Changes, Tests, or Experiments |
07/07/03 |
03-023 |
IP |
71111.04 |
EquIPment Alignment |
01/17/02 |
02-001 |
IP |
71111.05 |
Fire Protection |
03/06/03 |
03-007 |
IP |
71111.05AQ |
Fire Protection (Annual / Quarterly) |
09/10/04 |
04-023 |
IP |
71111.06 |
Flood Protection Measures |
01/17/02 |
02-001 |
IP |
71111.07 |
Heat Sink Performance |
01/17/02 |
02-001 |
IP |
71111.08 |
Inservice Inspection Activities |
05/11/04 |
04-013 |
IP |
71111.11
|
Licensed Operator Requalification Program |
12/16/03 |
03-041 |
IP |
71111.12
|
Maintenance Effectiveness |
07/01/02 |
02-025 |
IP |
71111.13 |
Maintenance Risk Assessments and Emergent Work Evaluation |
01/17/02 |
02-001 |
IP |
71111.14 |
Personnel Performance During Nonroutine Plant Evolutions |
07/07/03 |
03-023 |
IP |
71111.15 |
Operability Evaluations |
02/02/04 |
04-003 |
IP |
71111.16 |
Operator Workarounds |
01/17/02 |
02-001 |
IP |
71111.17 |
Permanent Plant Modifications |
01/17/02 |
02-001 |
IP |
71111.19 |
Post Maintenance Testing |
01/17/02 |
02-001 |
IP |
71111.20
|
Refueling and Outage Activities |
05/06/04 |
04-011 |
IP |
71111.21 |
Safety System Design and Performance Capability |
04/13/04 |
04-008 |
IP |
71111.22 |
Surveillance Testing |
05/11/04 |
04-013 |
IP |
71111.23 |
Temporary Plant Modifications |
01/17/02 |
02-001 |
IP |
71114 |
Reactor Safety Emergency Preparedness |
07/09/02 |
02-027 |
IP |
71114.01 |
Exercise Evaluation |
07/09/02 |
02-027 |
IP |
71114.02 |
Alert and Notification System Testing |
07/09/02 |
02-027 |
IP |
71114.03 |
Emergency Response Organization Augmentation |
07/09/02 |
02-027 |
IP |
71114.04 |
Emergency Action Level and Emergency Plan Changes |
07/09/02 |
02-027 |
IP |
71114.05 |
Correction of Emergency Preparedness Weaknesses and
Deficiencies |
07/09/02 |
02-027 |
IP |
71114.06 |
Drill Evaluation |
07/09/02 |
02-027 |
IP |
71121 |
Occupational Radiation Safety |
03/06/02 |
02-008 |
IP |
71121.01 |
Access Control To Radiologically Significant Areas |
03/06/02 |
02-008 |
IP |
71121.02 |
ALARA Planning and Controls |
03/06/02 |
02-008 |
IP |
71121.03 |
Radiation monitoring Instrumentation |
03/06/02 |
02-008 |
IP |
71122 |
Public Radiation Safety |
01/24/03 |
03-001 |
IP |
71122.01 |
Radioactive Gaseous and Liquid Effluent Treatment and
Monitoring Systems |
01/24/03 |
03-001 |
IP |
71122.02 |
Radioactive Material Processing and Transportation |
01/24/03 |
03-001 |
IP |
71122.03 |
Radiological Environmental Monitoring Program (REMP) |
01/24/03 |
03-001 |
IP |
71150 |
Discrepant or Unreported Performance Indicator Data |
03/06/01 |
01-006 |
IP |
71151 |
Performance Indicator Verification |
10/06/04 |
04-025 |
IP |
71152 |
Identification and Resolution of Problems |
09/08/03 |
03-032 |
IP |
71153 |
Event Followup |
06/24/03 |
03-020 |
IP |
71707 |
Plant Operations |
12/31/98 |
98-020 |
IP |
71715 |
Sustained Control Room and Plant Observation |
04/14/92 |
92-004 |
IP |
71750 |
Plant Support Activities |
06/24/98 |
98-010 |
IP |
71801 |
Decommissioning Performance and Status Review at Permanently Shutdown
Reactors |
08/11/97 |
97-012 |
IP |
71841 |
Human Performance |
12/12/00 |
00-027 |
IP |
71846 |
Review of Conduct of Operations |
10/01/76 |
76-024 |
IP |
72300 |
Startup Test Procedure review |
01/20/84 |
84-004 |
IP |
72301 |
Startup Test Results Evaluation |
01/20/84 |
84-004 |
IP |
72302 |
Startup Test Witnessing and Observation |
01/20/84 |
84-004 |
IP |
72400 |
Overall Startup Test Program |
07/01/80 |
80-016 |
IP |
72500 |
Initial Fuel Loading Procedure |
04/30/75 |
75-016 |
IP |
72502 |
Initial Criticality Procedure Review (BWR) |
04/30/75 |
75-016 |
IP |
72504 |
Heatup Phase Procedure Review |
04/30/75 |
75-016 |
IP |
72508 |
Power Ascension Procedure Review: HPCI System |
07/01/80 |
80-016 |
IP |
72509 |
Power Ascension Procedure Review Control Rod Drive system |
07/01/80 |
80-016 |
IP |
72510 |
Power Ascension Procedure Review Relief Valves and MSIVs |
04/30/75 |
75-016 |
IP |
72512 |
Startup Test Procedure Review RCIC or Recirculation Pump TrIP |
04/30/75 |
75-016 |
IP |
72514 |
Startup Test Procedure Review Turbine TrIP/Generator TrIP |
07/01/80 |
80-016 |
IP |
72516 |
Startup Test Procedure Review Shutdown From Outside the Control
Room (Group A) |
07/01/80 |
80-016 |
IP |
72517 |
Startup Test Procedure Review: Loss of Offsite Power (Group A &
B) |
07/01/80 |
80-016 |
IP |
72518 |
Startup Test Procedure Review Core Performance |
07/01/80 |
80-016 |
IP |
72524 |
Initial Fuel Loading Witnessing |
01/20/84 |
84-004 |
IP |
72526 |
BWR Initial Criticality Witnessing |
01/20/84 |
84-004 |
IP |
72532 |
Power Level Plateau Data Review (BWR) |
01/20/84 |
84-004 |
IP |
72564 |
Precritical Test Procedure Review Protective TrIP Circuit or Rod
Drop Measurement |
07/01/80 |
80-016 |
IP |
72566 |
Precritical Test Procedure Review RCS Leak Test or Pressurizer Effectiveness |
07/01/80 |
80-016 |
IP |
72570 |
Initial Criticality Procedure Review (PWR) |
07/01/80 |
80-016 |
IP |
72572 |
Low Power Test Procedures Review Moderator Temperature Coefficient
and Boron Worth or Control Rod Worth and Pseudo Rod Ejection Worth |
07/01/80 |
80-016 |
IP |
72576 |
Power Ascension Test Procedure Review Natural Circulation or Power
Reactivity Coefficient Measurement |
07/01/80 |
80-016 |
IP |
72578 |
Power Ascension Test Procedure Review Evaluation of Core Performance |
07/01/80 |
80-016 |
IP |
72580 |
Power Ascension Test Procedure Review Turbine TrIP or Generator
TrIP |
07/01/80 |
80-016 |
IP |
72582 |
Power Ascension Test Procedure Review Loss of Offsite Power (Group
A) |
07/01/80 |
80-016 |
IP |
72583 |
Power Ascension Test Procedure Review: Shutdown from Outside the
Control Room (Group B) |
|
80-016 |
IP |
72584 |
Power Ascension Test Procedure Review Evaluation of Flux Asymmetry
or Pseudo Rod Ejection Test |
04/30/75 |
75-015 |
IP |
72592 |
PWR Initial Criticality Witnessing |
01/20/84 |
84-004 |
IP |
72596 |
Precritical Data Review |
07/01/80 |
80-016 |
IP |
72600 |
Power Level Plateau Data Review (25% PWR) |
07/01/80 |
80-016 |
IP |
72608 |
Power Level Plateau Data Review (50% PWR) |
07/01/80 |
80-016 |
IP |
72616 |
Power Level Plateau Data Review (75% PWR) |
07/01/80 |
80-016 |
IP |
72624 |
Power Level Plateau Data Review (100% PWR) |
07/01/80 |
80-016 |
IP |
72701 |
Modification Testing |
04/14/92 |
92-004 |
IP |
73051 |
Inservice Inspection Review of Program |
01/14/86 |
86-003 |
IP |
73052 |
Inservice Inspection Review of Procedures |
01/14/86 |
86-003 |
IP |
73753 |
Inservice Inspection |
06/04/98 |
98-010 |
IP |
73755 |
Inservice Inspection Data Review and Evaluation |
01/14/86 |
86-003 |
IP |
73756 |
Inservice Testing of Pumps and Valves |
07/27/95 |
95-009 |
IP |
78060 |
Design Control (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78070 |
Procurement Document Control (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78080 |
Instruction, Procedures, and Drawings (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78090 |
Document Control (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78160 |
Control of Measuring and Test Equipment (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78170 |
Handling, Storage, and Shipping of Materials and Equipment (Pre-Licensing
and Construction)) |
04/02/03 |
03-008 |
IP |
78200 |
Corrective Action (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
78300 |
Supplier/Vendor Inspection (Pre-Licensing and Construction)) |
04/02/03 |
03-008 |
IP |
79702 |
Control and Monitoring of Radiological Source Term |
04/17/00 |
00-006 |
IP |
81431 |
Fixed Site Physical Protection of Special Nuclear Material of Low
Strategic Significance |
3/09/01 |
01-007 |
IP |
82001 |
Evaluation of Emergency Preparedness |
05/22/00 |
00-010 |
IP |
82001.01 |
ERO Performance Drills |
05/22/00 |
00-010 |
IP |
82001.02 |
ERO Performance Drills Dose Assessment |
05/22/00 |
00-010 |
IP |
82001.03 |
ERO Augmentation Drill |
05/22/00 |
00-010 |
IP |
82001.04 |
Facilities and EquIPment |
05/22/00 |
00-010 |
IP |
82001.05 |
Procedure Quality |
05/22/00 |
00-010 |
IP |
82001.06 |
Remedial Exercises |
05/22/00 |
00-010 |
IP |
82301 |
Evaluation of Exercises for Power Reactors |
12/31/96 |
96-024 |
IP |
82302 |
Review of Exercise Objectives and Scenarios for Power Reactors |
06/24/98 |
98-010 |
IP |
82701 |
Operational Status of the Emergency Preparedness Program |
12/31/96 |
96-024 |
IP |
83100 |
Occupational Exposure During SAFSTOR and DECON |
12/30/91 |
91-022 |
IP |
83501 |
Significant Uncontrolled Radiation Exposure |
04/17/00 |
00-006 |
IP |
83502 |
Evaluation of Public Radiation Safety |
04/17/00 |
00-006 |
IP |
83502.01 |
Radioactive Gaseous and Liquid Treatment and Monitoring Systems |
04/17/00 |
00-006 |
IP |
83502.02 |
Radioactive Material Process and Transportation |
04/17/00 |
00-006 |
IP |
83502.03 |
Radiological Environment Monitoring Program and Radioactive Material
Control Program |
04/17/00 |
00-006 |
IP |
83521 |
Radiation Protection Startup |
01/01/84 |
84-001 |
IP |
83723 |
General Employee, Radiation Safety, Plant Chemistry, Radwaste, and
Transportation Training |
12/16/03 |
03-041 |
IP |
83724 |
External Occupational Exposure Control and Personal Dosimetry |
04/17/00 |
00-006 |
IP |
83725 |
Internal Exposure Control and Assessment |
04/17/00 |
00-006 |
IP |
83728 |
Maintaining Occupational Exposures ALARA |
04/17/00 |
00-006 |
IP |
83729 |
Occupational Exposure During Extended Outages |
12/31/91 |
91-021 |
IP |
83750 |
Occupational Radiation Exposure |
03/15/94 |
02-023 |
IP |
83801 |
Inspection of Final Surveys at Permanently Shutdown Reactors |
01/28/02 |
02-003 |
IP |
83822 |
Radiation Protection |
09/07/00 |
00-016 |
IP |
83890 |
Closeout Inspection and Survey |
05/01/03 |
03-013 |
IP |
84100 |
Special Nuclear Material Inspections At Near Surface LowLevel Waste
Disposal Facilities in Agreement States |
11/27/01 |
01-028 |
IP |
84101 |
Radioactive Waste Management |
12/30/91 |
91-022 |
IP |
84521 |
Radwaste Startup |
01/01/84 |
84-001 |
IP |
84750 |
Radioactive Waste Treatment, and Effluent and Environmental Monitoring |
03/15/94 |
94-006 |
IP |
84850
|
Radioactive Waste Management - Inspection of Waste Generator Requirements
of 10 CFR Part 20 and 10 CFR Part 61. |
06/06/02 |
02-023 |
IP |
84900 |
LowLevel Radioactive Waste Storage |
10/20/00 |
00-022 |
IP |
85200 |
MC&A; for Licensees Possessing Less Than of Equal to One Effective
Kilogram of SNM |
04/10/85 |
85-015 |
IP |
85203 |
Facility Organization and Management Controls |
01/17/86 |
86-004 |
IP |
85205 |
Facility Operations and Management Controls |
04/10/85 |
85-015 |
IP |
85207 |
Measurement Systems |
01/17/86 |
86-004 |
IP |
85209 |
Measurement Control and Statistics |
04/10/85 |
85-015 |
IP |
85211 |
Physical Inventory |
01/17/86 |
86-004 |
IP |
85215 |
Records and Reports |
01/17/86 |
86-001 |
IP |
85301 |
MC&A; for Imports and Exports |
07/18/84 |
84-022 |
IP |
85303 |
MC&A; Management Structure and Personnel Training and Qualification |
03/18/91 |
91-005 |
IP |
85305 |
Item Monitoring |
03/18/91 |
91-005 |
IP |
85307 |
Process Monitoring |
03/18/91 |
91-005 |
IP |
85309 |
Measurement Systems and Control |
03/18/91 |
91-005 |
IP |
85311 |
Physical Inventory |
03/18/91 |
91-005 |
IP |
85313 |
Alarm Resolution |
03/18/91 |
91-005 |
IP |
85315 |
Accounting and Internal Control |
03/18/91 |
91-005 |
IP |
85401 |
Management Structure |
07/22/99 |
99-011 |
IP |
85402 |
Measurement Program |
07/22/99 |
99-011 |
IP |
85403 |
Measurement Control Program |
07/22/99 |
99-011 |
IP |
85404 |
Physical Inventory |
10/23/86 |
96-021 |
IP |
85405 |
Item Control Program |
07/22/99 |
99-011 |
IP |
85406 |
Resolution Program |
10/23/96 |
96-021 |
IP |
85407 |
Assessment Program |
07/22/99 |
99-011 |
IP |
85408 |
Recordkeeping |
07/22/99 |
99-011 |
IP |
85501 |
Inventory Program |
07/22/99 |
99-011 |
IP |
85502 |
Detection Program |
07/22/99 |
99-011 |
IP |
85503 |
Resolution Program |
07/22/99 |
99-011 |
IP |
85420 |
Inspection of IAEA Safeguards for Inspectors at Power Reactors |
06/22/88 |
88-007 |
IP |
85425 |
Implementation of the US/IAEA Safeguards Agreement at Fuel Facilities |
06/22/88 |
88-007 |
IP |
86001 |
Design, Fabrication, Testing, and Maintenance of Transportation
Packagings |
02/07/02 |
02-004 |
IP |
86730 |
Transportation of Radioactive Materials |
04/17/00 |
00-006 |
IP |
86740
|
Inspection of Transportation Activities |
04/24/02 |
02-020 |
IP |
86750 |
Solid Radioactive Waste Management and Transportation of Radioactive
Materials |
03/15/94 |
94-006 |
IP |
87102 |
Maintaining Effluents from Materials Facilities As Low As Is Reasonably
Achievable (ALARA) |
04/04/00 |
00-005 |
IP |
87103 |
Inspection of Materials Licensees Involved in an Incident or Bankruptcy
Filing |
11/03/00 |
00-023 |
IP |
87104
|
Decommissioning Inspection Procedure for Materials Licensees |
07/29/02 |
02-029 |
IP |
87121 |
Industrial Radiography Programs |
12/31/02 |
02-047 |
IP |
87122 |
Irradiator Programs |
12/31/02 |
02-047 |
IP |
87123 |
Well Logging Programs |
11/25/03 |
03-037 |
IP |
87124 |
Fixed and Portable Gauge Programs |
11/25/03 |
03-037 |
IP |
87125 |
Materials Processor/Manufacturer Programs |
12/31/02 |
02-047 |
IP |
87126 |
Industrial/Academic/Research Programs |
12/31/02 |
02-047 |
IP |
87127 |
Radiopharmacy Programs |
12/31/02 |
02-047 |
IP |
87129 |
Master Materials Program |
09/15/03 |
03-034 |
IP |
87130 |
Nuclear Medicine Programs, Written Directive Not Required |
10/24/02 |
02-041 |
IP |
87131 |
Nuclear Medicine Programs, Written Directive Required |
10/24/02 |
02-041 |
IP |
87132 |
Brachytherapy Programs |
10/24/02 |
02-041 |
IP |
87133 |
Medical Gamma Sterotactic Radiosurgery and Teletherapy Programs |
10/24/02 |
02-041 |
IP |
87134 |
Medical Broad Scope Programs |
10/24/02 |
02-041 |
IP |
87250 |
Locating Missing Materials Licensees |
10/29/01 |
01-022 |
IP |
87654 |
Uranium Mill Site Decommissioning Inspection |
03/19/02 |
02-010 |
IP |
88001 |
Onsite Construction |
04/15/94 |
94-011 |
IP |
88002 |
Operational Event Review and Feedback Programs at Fuel Cycle Facilities |
12/20/96 |
96-025 |
IP |
88003 |
Reactive Inspection for Events at Fuel Cycle Facilities Program |
08/10/98 |
98-012 |
IP |
88005 |
Management Organization and Controls |
12/20/96 |
96-025 |
IP |
88010 |
Operator Training/Retraining |
05/23/84 |
84-017 |
IP |
88015 |
Headquarters Nuclear Criticality Safety Program |
12/20/96 |
96-025 |
IP |
88020 |
Regional Criticality Safety Inspection Program |
12/20/96 |
96-025 |
IP |
88025 |
Maintenance and Surveillance Testing |
05/23/84 |
84-017 |
IP |
88035 |
Radioactive Waste Management |
05/23/84 |
84-017 |
IP |
88045 |
Environmental Protection |
05/23/84 |
84-017 |
IP |
88050 |
Emergency Preparedness |
04/08/96 |
96-007 |
IP |
88055 |
Fire Protection |
01/14/91 |
91-001 |
IP |
88056 |
Process Safety Information |
01/16/96 |
96-001 |
IP |
88057 |
Hazard Identification and Assessment |
01/16/96 |
96-001 |
IP |
88058 |
Standard Operating Procedures |
01/16/96 |
96-001 |
IP |
88059 |
SiteWide Safety Procedures |
01/16/96 |
96-001 |
IP |
88060 |
Detection and Monitoring |
01/16/96 |
96-001 |
IP |
88061 |
Chemical Safety Training |
01/16/96 |
96-001 |
IP |
88062 |
Maintenance and Inspection |
01/16/96 |
96-001 |
IP |
88063 |
Management of Change |
01/16/96 |
96-001 |
IP |
88064 |
Emergency Response Procedures |
01/16/96 |
96-001 |
IP |
88065 |
Incident Investigation |
01/16/96 |
96-001 |
IP |
88066 |
Audits and Inspection |
01/16/96 |
96-001 |
IP |
88100 |
Plant Operations |
12/30/96 |
96-026 |
IP |
88101 |
Configuration Control |
12/30/96 |
96-026 |
IP |
88102 |
Surveillance Observations |
12/30/96 |
96-026 |
IP |
88103 |
Maintenance Observations |
12/30/96 |
96-026 |
IP |
88104
|
Decommissioning Inspection Procedure For Fuel Cycle Facilities |
07/03/02 |
02-026 |
IP |
88105 |
Management Organization and Controls |
12/30/96 |
96-026 |
IP |
89001 |
InSitu Leach (ISL) Facilities |
09/02/97 |
97-013 |
IP |
90501 |
Reportable Matters Startup Test Program |
04/30/75 |
75-016 |
IP |
90712 |
Inoffice Review of Written Reports of Nonroutine Events at Power
Reactor Facilities |
12/31/98 |
98-020 |
IP |
92050 |
Review of Quality Assurance for Extended Construction Delay |
04/04/00 |
00-005 |
IP |
92700 |
Onsite Followup of Written Reports of Nonroutine Events at Power
Reactor Facilities |
12/31/98 |
98-020 |
IP |
92701 |
Followup |
03/14/94 |
94-005 |
IP |
92703
|
Followup of Confirmatory Action Letters |
11/08/01 |
01-025 |
IP |
92709 |
Licensee Strike Contingency Plans |
08/21/92 |
92-010 |
IP |
92711 |
Continued Implementation of Strike Plans During an Extended Strike |
08/21/92 |
92-010 |
IP |
92712 |
Resumption of Normal Operations After a Strike |
08/21/92 |
92-010 |
IP |
93001 |
OSHA Interface Activities |
02/11/04 |
04-006 |
IP |
93800 |
Augmented Inspection Team |
10/23/00 |
02-039 |
IP |
93801 |
Safety System Functional Inspection (SSFI) |
07/15/96 |
96-016 |
IP |
93802 |
Operational Safety Team Inspection (OSTI) |
11/27/89 |
89-015 |
IP |
93803 |
Safety Systems Outage Modifications Inspection |
04/27/89 |
89-008 |
IP |
93804 |
RiskBased Operational Safety and Performance Inspection |
01/15/92 |
92-001 |
IP |
93805 |
Maintenance Program |
08/06/93 |
93-007 |
IP |
93806 |
Operational Readiness Assessment Team Inspections |
09/29/98 |
98-015 |
IP |
93807 |
Systems Based Instrumentation and Control Inspection |
01/29/93 |
93-001 |
IP |
93809 |
Safety System Engineering Inspection (SSEI) |
06/23/97 |
97-009 |
IP |
93810 |
Service Water System Operational Performance Inspection (SWSOPI) |
09/14/98 |
98-013 |
IP |
93811 |
Electrical Distribution System Functional Inspection (EDSFI) |
02/03/99 |
99-002 |
IP |
93812 |
Special Inspection |
07/07/03 |
03-023 |
IP |
95001 |
Inspection For One Or Two White Inputs In A Strategic Performance
Area |
05/23/03 |
03-016 |
IP |
95002 |
Inspection For One Degraded Cornerstone Or Any Three White Inputs
In a Strategic Performance Area |
05/23/03 |
03-016 |
IP |
95003 |
Supplemental Inspection For Repetitive Degraded Cornerstone, MultIPle
Degraded Cornerstone, MultIPle Yellow Inputs, Or One Red Input |
01/17/02 |
02-001 |
IP |
95003.01 |
Emergency Preparedness |
01/17/02 |
02-001 |