Jet Propulsion Laboratory JPL - Earth JPL - Solar System JPL - Stars & Galaxies JPL - Technology Jet Propulsion Laboratory California Institute of Technology Mars Exploration Rover Mission Home NASA Home Page Jet Propulsion Laboratory California Institute of Technology
header NASA logo
+ NASA Homepage
+ NASA en Español
+ Marte en Español
Overview Science Technology The Mission People Features Events Multimedia
Mars for Kids
Mars for Students
Mars for Educators
Mars for Press
+ Mars Home
+ Rovers Home
image link to mission page
image link to summary page
image link to rovers update
image link to week in review
image link to mission team
image link to launch vehicle
image link to spacecraft
link to mission timeline
Summary
Pre-launch Activities
Launch
Cruise
Approach
Entry, Descent, and Landing
Rover Egress
Surface Operations
communications to earth
Mission Timeline: Surface Operations

Surface Operations begin once the rover has completed its egress. The rovers were designed to last for 90 days on the martian surface.

Surface operations includes two highly interconnected efforts:

Engineers responsible for rover navigation and science team members must work closely together to achieve mission goals. What the rover will actually do on the surface will depend on complex calculations from the science team on which rock, soil, and other targets are high-priority and then intense discussion with the engineering team on whether the rover can actually move toward those targets safely and quickly.

Practicing surface operations here on Earth

Before the rovers get to Mars, the science and engineering teams practice surface operations here on Earth through "field tests." In preparation for this mission, a rover called FIDO was taken out to a remote desert location, while the scientists and engineers worked together to move it toward interesting science targets. To see what this experience was like, visit the FIDO Field Test site.

Eventual End of Mission

Toward the end of the surface phase for both missions, both power and telecom capabilities will be decreasing, as the Earth and the Sun become more distant from Mars, dust falls on the solar panels, the batteries lose capacity, and the Sun moves further North past the landing site latitude. Eventually, somewhere near Sol 91 it is expected that the rover will be unable to store up enough thermal or battery energy to prevent its components´ overnight temperatures from falling below flight allowable levels. That will sooner or later result in failure of one or more of those components, silencing the rover forever.

footer credits link footer feedback link footer related links footer link to sitemap
first gov logo
footer NASA logo